{"id":20337,"date":"2023-08-04T02:41:57","date_gmt":"2023-08-04T09:41:57","guid":{"rendered":"https:\/\/essential.construction\/news\/commercial-work-rise-sees-construction-return-to-growth\/"},"modified":"2023-08-04T02:41:59","modified_gmt":"2023-08-04T09:41:59","slug":"commercial-work-rise-sees-construction-return-to-growth","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/commercial-work-rise-sees-construction-return-to-growth\/","title":{"rendered":"Commercial work rise sees construction return to growth"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>The bellwether S&amp;P Global \/ CIPS UK Construction Purchasing Managers\u2019 Index posted 51.7 in July \u2013 up from 48.9 in June.<\/p>\n<p>Robust increases in commercial building (index at 54.4) and civil engineering (53.9) were offset by a steep fall in house building (43.0).<\/p>\n<p>Tim Moore, Economics Director at S&amp;P Global Market Intelligence, which compiles the survey said: \u201cJuly data indicated that some parts of the UK construction sector gained momentum, notably commercial building and civil engineering activity.<\/p>\n<p>\u201cThis led to a renewed rise in total construction output which, although modest, was the fastest for five months. Survey respondents commented on increased infrastructure work, office refurbishments, and resilient demand for a range of commercial projects.<\/p>\n<p>\u201cMeanwhile, another steep reduction in house building acted as a severe constraint on construction growth. Around 35% of the survey panel reported a decline in residential work during July, while only 18% signalled a rise.<\/p>\n<p>\u201cLower volumes of housing activity have been recorded in each month since December 2022, with construction companies widely reporting subdued sales due to rising interest rates and worries about the economic outlook.<\/p>\n<p>\u201cSupply conditions improved considerably in July, as a combination of weaker demand and replenished stocks meant that delivery times shortened to the greatest extent since 2009. As a result, input prices inflation was much lower than seen on average in the first half of the year, but there were still many reports from construction firms that higher wages costs had put upward pressure on business expenses.\u201d<\/p>\n<p>Dr John Glen, Chief Economist at the Chartered Institute of Procurement &amp; Supply (CIPS), said: \u201cAlthough the sector showed a slight uplift in activity in July, there is a question mark over the sustainability of this growth and the challenges that lie beneath the floorboards.<\/p>\n<p>\u201cDecisions about buying a new home are being delayed by many consumers. Another fall in residential building levels and for the eighth month in a row, it\u2019s obvious that UK interest rate rises and cost of living pressures have dealt a hammer blow to the housing sector. The commercial and civil engineering sectors remained the only engines of growth last month.<\/p>\n<p>\u201cFor those that secured additional work, the best improvement in delivery times for raw materials since March 2009 will be music to their ears as supply chain disruptions improved and shortages lessened. Likewise the right skilled candidates found the best positions as job creation rose to the highest for nine months so there were some bright spots in the data.<\/p>\n<p>\u201cIn spite of more uncertainty and thinner margins, builders kept their confidence up and focussed on resilience in their operations as optimism about the next 12 months remained fairly steady.\u201d<\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/08\/04\/commercial-work-rise-sees-construction-return-to-growth\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The bellwether S&amp;P Global \/ CIPS UK Construction Purchasing Managers\u2019 Index posted 51.7 in July \u2013 up from 48.9 in &#8230; <a title=\"Commercial work rise sees construction return to growth\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/commercial-work-rise-sees-construction-return-to-growth\/\" aria-label=\"Read more about Commercial work rise sees construction return to growth\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20338,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-20337","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20337"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20337\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/20338"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}