{"id":20745,"date":"2023-08-15T09:02:39","date_gmt":"2023-08-15T16:02:39","guid":{"rendered":"https:\/\/essential.construction\/news\/usace-taps-turner-for-389m-military-flood-contract\/"},"modified":"2023-08-15T09:02:40","modified_gmt":"2023-08-15T16:02:40","slug":"usace-taps-turner-for-389m-military-flood-contract","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/usace-taps-turner-for-389m-military-flood-contract\/","title":{"rendered":"USACE taps Turner for $389M military flood contract"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><span><span><span><strong><span><span>Award: <\/span><\/span><\/strong><span><span><span><span>Offutt<\/span> Flood Recovery Program final contract<\/span><\/span><\/span><br \/><strong><span><span>Value<\/span><\/span><\/strong><span><span><span>: $389 million<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Location<\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>: Omaha, Nebraska<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Clients<\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>: U.S. Army Corps of Engineers<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span>The U.S. Army Corps of Engineers has awarded Turner Construction a $389 million contract to make Omaha, Nebraska\u2019s, Offutt Air Force Base more resilient to flooding, <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.turnerconstruction.com\/insights\/offutt-air-force-base-to-enhance-resilience-against-future-flooding-threats\" target=\"_blank\"><span><span><span><span><span><span><span><span>according to a company news release<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The project is the final contract of the <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.airandspaceforces.com\/rebuilding-offutt-cost-1-1-1-2-billion-congressman\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>$1.1 billion Offutt Flood Recovery Program<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, which was developed at the military installation in response to catastrophic flooding from the Missouri River in 2019. That\u2019s nearly double the original cost estimate of $650 million to rebuild after one-third of the base, including its runway, was inundated with water due to heavy rainfall and melting snow.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The project\u2019s objective is to raise base facilities above the 100-year flood plain.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Turner will build a three-story, 420,000-square-foot facility to house intelligence, training, maintenance and reconnaissance squadrons. That building will allow Offutt\u2019s 55th Wing and Air Force information operations unit to operate in the same location.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The facility will enhance Offutt\u2019s abilities to serve dominant information warfare forces through electromagnetic spectrum operations, information operations, intelligence, surveillance, reconnaissance and nuclear command, control and communications, <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.facebook.com\/OmahaUSACE\" target=\"_blank\"><span><span><span><span><span><span><span><span>according to a post<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> on the USACE\u2019s Omaha District Facebook page.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>A separate, 5,000-square-foot defense courier station will serve as a shipping and receiving facility.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The facilities are slated to open in December 2027.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/usace-turner-military-flood-resilience-contract-nebraska\/690860\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Award: Offutt Flood Recovery Program final contractValue: $389 millionLocation: Omaha, NebraskaClients: U.S. Army Corps of Engineers The U.S. Army &#8230; <a title=\"USACE taps Turner for $389M military flood contract\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/usace-taps-turner-for-389m-military-flood-contract\/\" aria-label=\"Read more about USACE taps Turner for $389M military flood contract\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20746,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-20745","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20745","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20745"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20745\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/20746"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}