{"id":20939,"date":"2023-08-19T09:11:00","date_gmt":"2023-08-19T16:11:00","guid":{"rendered":"https:\/\/essential.construction\/news\/granite-wins-215m-sewer-contract\/"},"modified":"2023-08-19T09:11:01","modified_gmt":"2023-08-19T16:11:01","slug":"granite-wins-215m-sewer-contract","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/granite-wins-215m-sewer-contract\/","title":{"rendered":"Granite wins $215M sewer contract"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><strong>Award:<\/strong> <span><span><span><span><span><span><span>Northside<\/span> Interceptor Tunnel Project<\/span><\/span><\/span><\/span><\/span><\/span><br \/><strong>Value:<\/strong> <span><span><span><span><span><span>$215 million<\/span><\/span><\/span><\/span><\/span><\/span><br \/><strong>Location:<\/strong>\u00a0Akron, Ohio<br \/><strong>Client:<\/strong> <span><span><span><span><span><span>City of Akron<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span>Granite Construction has won a $215 million <a rel=\"nofollow noopener\" href=\"http:\/\/www.graniteconstruction.com\/newsroom\/granite-selected-approximately-215-million-tunnel-project-akron-ohio\" target=\"_blank\">contract to build a sewer tunnel<\/a> and divert overflows from the Cuyahoga River in Akron, Ohio, the contractor <span><span>announced in an Aug. 16 news release<\/span><\/span>.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The Northside Interceptor Tunnel Project is a component of the city\u2019s mandated 2014 consent decree from the EPA to clean up its waterways, according to an update from <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.akronwaterwaysrenewed.com\/consent-decree-update\" target=\"_blank\"><span><span><span><span><span><span><span><span>Akron Mayor Daniel Horrigan<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The NITP will include 6,660 linear feet of precast-concrete-segmental-lined rock tunnel with a finished inside diameter of 16.5 feet, designed to accommodate both dry and wet-weather sewage flow, as well as provide storage, according to Granite.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The structure will help collect combined sewer overflows at four locations, with a storage capacity of more than 10 million gallons to reduce impacts on local waterways.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The project also features an array of control structures, flow drop shafts, connecting sewers and overflow structures to optimize the system&#8217;s performance. In his update, Horrigan said the tunnel would capture 99% of wet weather flow and treat more than 2.3 billion gallons of water that currently goes back to local waterways untreated.\u00a0\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cSpanning 6,660 feet in length and descending over 100 feet below ground into rock, NITP will be a feat of engineering and is set to become a symbol of innovation and environmental stewardship for the entire region,\u201d said Jim Nickerson, vice president of regional operations for Watsonville, California-based Granite, in the release.\u00a0\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The tunnel is the 25th project the city has taken on under the EPA mandate, which has resulted in a combined price tag of $1 billion. But the city is <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/fox8.com\/news\/akron-files-formal-dispute-with-federal-epa-over-consent-decree\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>pushing back against a 26th project<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, to build a $209 million Enhanced High-Rate Treatment Facility outlined in an amendment to the consent decree, which Horrigan characterized as one of the strictest in the nation.\u00a0\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Project funding for the NITP will come from the Ohio EPA\u2019s Water Pollution Control Loan Fund.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Granite plans to begin the project in September, with completion slated for July 2027.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/granite-wins-215m-sewer-contract-akron-ohio\/691235\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Award: Northside Interceptor Tunnel ProjectValue: $215 millionLocation:\u00a0Akron, OhioClient: City of Akron Granite Construction has won a $215 million contract &#8230; <a title=\"Granite wins $215M sewer contract\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/granite-wins-215m-sewer-contract\/\" aria-label=\"Read more about Granite wins $215M sewer contract\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20940,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-20939","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20939"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20939\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/20940"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}