{"id":21671,"date":"2023-09-07T12:03:11","date_gmt":"2023-09-07T19:03:11","guid":{"rendered":"https:\/\/essential.construction\/news\/shoring-advances-at-cielo-condos-site-bulk-excavation-scheduled-this-month\/"},"modified":"2023-09-07T12:03:17","modified_gmt":"2023-09-07T19:03:17","slug":"shoring-advances-at-cielo-condos-site-bulk-excavation-scheduled-this-month","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/shoring-advances-at-cielo-condos-site-bulk-excavation-scheduled-this-month\/","title":{"rendered":"Shoring Advances at Cielo Condos Site, Bulk Excavation Scheduled This Month"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"article_body\">\n<p>As we move into autumn, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cielo-condos.29486\" target=\"_blank\">Cielo Condos<\/a> in Toronto&#8217;s vibrant Annex neighbourhood continues to make significant strides.\u00a0Located at 300 Bloor Street West between St George and Spadina stations on TTC Lines 1 and 2, the 29-storey tower developed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/collecdev.25215\" target=\"_blank\">Collecdev<\/a>\u00a0and designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kpmb-architects.8018\" target=\"_blank\">KPMB Architects<\/a>\u00a0is nestled on the edge the University of Toronto&#8217;s St George Campus. The development is a new chapter for the site of the 19th century Bloor Street United Church.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, KPMB Architects, Collecdev\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-c1074303-cde5-4333-a3f1-7799b56e4256\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162319.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162319.jpeg', true, ''); return false;\" title=\"Looking south from Bloor Street West to Cielo Condos, designed by KPMB Architects for Collecdev\"\/><span class=\"image-description\">Looking south from Bloor Street West to Cielo Condos, designed by KPMB Architects for Collecdev<\/span><\/p>\n<p>Following\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/08\/work-prepares-cielo-condos-site-bulk-excavation-september.53523\" target=\"_blank\">our last update in August<\/a>, significant strides have been made in the construction process. Over 85% of shoring work for the residential parking area has been completed, with all caissons installed on the east, west, and south elevations. About 50% of the caissons are done on the north side. The bulk excavation north of the TTC tunnels marks another significant milestone in the project timeline, scheduled to commence the second week of September.<\/p>\n<p>Casting our gaze southward in August from within the site, steel I-beams staged across the floor of the site come into focus, primed for use in shoring operations. The structural steel frame for the facade retention of the historic Bloor Street United Church walls is also distinctly visible, while protective material shields interior parts of the structure from the weather during the construction period.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, KPMB Architects, Collecdev\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-12ba268a-2481-475f-9f2f-0cb5b190be26\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162314.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162314.jpg', true, ''); return false;\" title=\"Looking south to steel I-beams staged across the site, image courtesy of Collecdev\"\/><span class=\"image-description\">Looking south to steel I-beams staged across the site, image courtesy of Collecdev<\/span><\/p>\n<p>Shifting our focus to the southeast, a concrete caisson and mobile crane become the focal point.\u00a0On the northern half of the site, the caisson emerges from a square slab at ground level, signifying ongoing shoring around the TTC tunnel.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, KPMB Architects, Collecdev\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-08cab5f8-9c2b-43b0-bccc-9449c31fd6cb\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162315.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162315.jpg', true, ''); return false;\" title=\"A concrete caisson as part of ongoing shoring, image courtesy of Collecdev\"\/><span class=\"image-description\">A concrete caisson as part of ongoing shoring, image courtesy of Collecdev<\/span><\/p>\n<p>Panning the view southwestward, the extended jib of the mobile crane boom positions another concrete caisson near the hoarding along the southern edge of the property, while crew members aid in the procedure.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, KPMB Architects, Collecdev\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-1c03c273-3b20-4ad6-b551-9f7c0be9bc39\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162316.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162316.jpg', true, ''); return false;\" title=\"A mobile crane in operation for shoring work along Bloor Street, image courtesy of Collecdev\"\/><span class=\"image-description\">A mobile crane in operation for shoring work along Bloor Street, image courtesy of Collecdev<\/span><\/p>\n<p>With shoring nearing its completion, bulk excavation for the parking levels south of the TTC tunnels is slated to start in early October. Additionally, November, 2023 is expected to witness the completion of a temporary staging slab at the ground floor level, supported on structural caissons.<\/p>\n<p>Turning our attention eastwards, we see a row of I-beams anchored into the ground at regular intervals, demarcating the TTC tunnel below. To the left is the George C. Pidgeon House, to be restored and incorporated into the redevelopment while preserving a layer of historical richness to the Annex.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, KPMB Architects, Collecdev\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-5788ff43-e2a1-4e02-89b4-998f5671f534\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162318.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/09\/53787\/53787-162318.jpg', true, ''); return false;\" title=\"Looking north to vertically installed I-beams anchored into the ground, image courtesy of Collecdev\"\/><span class=\"image-description\">Looking north to vertically installed I-beams anchored into the ground, image courtesy of Collecdev<\/span><\/p>\n<p>Melding modern innovation with the storied history of the 19th-century Bloor Street United Church, upon completion, Cielo Condos will bring 284 residential units spread across 29 floors, reaching a height of 99m. The developer aims to fuse modern luxury with Toronto\u2019s rich cultural fabric, with construction in full swing for the bulk excavation in the coming months.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UrbanToronto Pro<\/a>, that provides comprehensive data on construction projects in the Greater Toronto Area\u2014from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant\u00a0Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');\nfbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2023\/09\/shoring-advances-cielo-condos-site-bulk-excavation-scheduled-month.53787\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we move into autumn, Cielo Condos in Toronto&#8217;s vibrant Annex neighbourhood continues to make significant strides.\u00a0Located at 300 Bloor &#8230; <a title=\"Shoring Advances at Cielo Condos Site, Bulk Excavation Scheduled This Month\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/shoring-advances-at-cielo-condos-site-bulk-excavation-scheduled-this-month\/\" aria-label=\"Read more about Shoring Advances at Cielo Condos Site, Bulk Excavation Scheduled This Month\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":21672,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-21671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/21671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=21671"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/21671\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/21672"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=21671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=21671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=21671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}