{"id":22455,"date":"2023-10-03T12:12:11","date_gmt":"2023-10-03T19:12:11","guid":{"rendered":"https:\/\/essential.construction\/news\/sickkids-patient-support-centre-reaches-the-finish-line\/"},"modified":"2023-10-03T12:12:13","modified_gmt":"2023-10-03T19:12:13","slug":"sickkids-patient-support-centre-reaches-the-finish-line","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/sickkids-patient-support-centre-reaches-the-finish-line\/","title":{"rendered":"SickKids\u2019 Patient Support Centre reaches the finish line"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<div id=\"attachment_1003980463\" style=\"width: 212px\" class=\"wp-caption alignright\"><a rel=\"magnific nofollow noopener\" href=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2023\/10\/SickKids4-sm-scaled.jpeg\" target=\"_blank\"><\/a><\/p>\n<p id=\"caption-attachment-1003980463\" class=\"wp-caption-text\">(Photo courtesy of PCL)<\/p>\n<\/div>\n<p>The new Patient Support Centre, the first major step of Project Horizon, The Hospital for Sick Children\u2019s (SickKids) multi-year campus transformation, has been officially unveiled. On September 28, PCL Construction and B+H Architects joined SickKids, SickKids Foundation and partners to celebrate the monumental milestone marking the end of major construction activities of the new training, education and administrative tower with a ribbon-cutting ceremony.<\/p>\n<p>\u201cSeeing the PSC move from vision to reality is an exciting moment for Project Horizon \u2013 and for SickKids. We\u2019re thrilled to be taking this first critical step in our campus redevelopment project with the completion of this education, training and administrative tower,\u201d said Kyle Robinson, chief redevelopment and sustainable facilities officer at SickKids. \u201cWith the PSC complete, we will be able to start moving approximately 3,000 staff members over to the building, which enables us to start our many renovation projects on our way to a new hospital. Thank you to our partners for helping us reach this goal \u2013 and a big thank you to our staff, who contributed their time, energy and effort to not only help plan and design this building, but also to a future vision of SickKids.\u201d<\/p>\n<p>Designed with connectivity and community in mind, the 22-storey Patient Support Centre is home to the SickKids Learning Institute, which supports more than 1,000 world-class trainees, students and learners annually. The building also includes a state-of-the-art Simulation Centre for hands-on teaching in a bright, modern workspace for clinicians, professionals, management and support staff.<\/p>\n<p>\u201cCompleting construction on the Patient Support Centre and bringing the first phase of SickKids\u2019 vision for Project Horizon to life has been an incredible feat by the hospital, all of the partners and the hundreds of tradespeople who contributed to this project,\u201d said Monique Buckberger, vice-president and district manager of PCL Toronto. \u201cFrom preconstruction planning to final execution, this project truly demonstrates the power of collaboration and dedication and is an accomplishment that is something to be proud of.\u201d<\/p>\n<p>A workforce of approximately 300 tradespeople were active at the peak of construction, with more than 980,000 hours worked without a lost time injury (LTI).<\/p>\n<p>\u201cNow completed, the Patient Support Centre is a bold addition to Toronto\u2019s urban fabric and the SickKids campus,\u201d said Patrick Feje\u0301r, project design lead and CEO of B+H. \u201cThe building\u2019s undulating fa\u00e7ade and blue-ribbon staircase are entry points to an environment that tends to staff wellbeing, guided by the knowledge that patient care requires caring for staff.\u201d<\/p>\n<p>With a strong focus on health and wellness for staff who lead and support clinical care, the Patient Support Centre design integrates purpose-built healing and green features such as a floor-to-ceiling glass fa\u00e7ade and terraced green roofs. Striving for excellence in sustainable design and construction, the new building is aiming to comply with Toronto\u2019s Tier 3 and 4 Building Standards and achieve Leadership in Energy and Environmental Design (LEED) Gold certification.<\/p>\n<p>\u00a0<\/p>\n<h5>Project Team<\/h5>\n<ul>\n<li>Owner: The Hospital for Sick Children<\/li>\n<li>Design Firm: B+H Architects<\/li>\n<li>Construction Manager: PCL Constructors Canada Inc.<\/li>\n<li>Vertical Transportation Consultant: KJA Consultants<\/li>\n<li>Structural Engineer: Entuitive<\/li>\n<li>Mechanical Consultant: The Mitchell Partnership<\/li>\n<li>Electrical Consultant: Mulvey &amp; Banani<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/www.pcl.com\/\" target=\"_blank\">www.pcl.com<\/a><\/p>\n<\/p><\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/construction\/sickkids-patient-support-centre-reaches-the-finish-line\/1003980462\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sickkids-patient-support-centre-reaches-the-finish-line\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Photo courtesy of PCL) The new Patient Support Centre, the first major step of Project Horizon, The Hospital for Sick &#8230; <a title=\"SickKids\u2019 Patient Support Centre reaches the finish line\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/sickkids-patient-support-centre-reaches-the-finish-line\/\" aria-label=\"Read more about SickKids\u2019 Patient Support Centre reaches the finish line\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":22456,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[],"class_list":["post-22455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-onsite-magazine","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/22455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=22455"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/22455\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/22456"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=22455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=22455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=22455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}