{"id":23101,"date":"2023-11-07T12:55:39","date_gmt":"2023-11-07T20:55:39","guid":{"rendered":"https:\/\/essential.construction\/news\/supercharge-bim-workflows-with-a-single-source-of-truth\/"},"modified":"2023-11-07T12:55:42","modified_gmt":"2023-11-07T20:55:42","slug":"supercharge-bim-workflows-with-a-single-source-of-truth","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/supercharge-bim-workflows-with-a-single-source-of-truth\/","title":{"rendered":"Supercharge BIM Workflows with a Single Source of Truth"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"\">\n<p><strong>Learn how Hercuton, a design &amp; build firm, uses a Common Data Environment to boost its business and how Solibri\u2019s new capabilities streamline BIM workflows on CDEs throughout the construction project.<\/strong><\/p>\n<p>Often, a construction project is visualized as a neat supply chain diagram in which information flows in an orderly manner. Everyone who has worked in the industry knows that\u2019s the exception, not the rule. The information flow is far from well-managed, and errors and rework ensue. However, that shouldn\u2019t be the case. We already have the digital capabilities to perform much better.<\/p>\n<p>We talked with two industry experts to understand construction information management\u2019s present state and the business value of using quality-managed BIM and\u00a0<strong>Common Data Environments<\/strong>\u00a0(CDEs).<\/p>\n<div class=\"wp-block-qubely-row qubely-section qubely-block-48d2f1\">\n<div class=\"qubely-container\">\n<div class=\"qubely-row \">\n<div class=\"wp-block-qubely-column qubely-column qubely-column-front qubely-block-354be3\">\n<div class=\"qubely-column-inner\">\n<h2 class=\"wp-block-heading\" id=\"h-cde-common-data-environment\">CDE \u2013 Common Data Environment<\/h2>\n<p>The concept of a cloud server as a project\u2019s federated file repository was established in the early 1990s. It contains folders for each design discipline and uses rights management to secure the information.<\/p>\n<p>A Common Data Environment, or CDE, extends the capabilities of simple file storage. These are sometimes called BIM collaboration platforms but can contain all kinds of digital documents and data. A CDE can provide services like digital workflows, version and status management, issues communication, model viewing, and quality checks.<\/p>\n<p>Several companies provide CDEs as a service. Examples include Autodesk Construction Cloud, Bimsync, and Oracle Aconex CDE.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2 class=\"wp-block-heading\" style=\"margin-top:var(--wp--preset--spacing--50)\">At Hercuton, BIM is business as usual<\/h2>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.hercuton.com\" target=\"_blank\">Hercuton<\/a> is a design &amp; build company in the Dutch JAJO construction group. The group is unique in the Netherlands because their services cover the whole life cycle of a building. They are \u201cclosing the circle together,\u201d as their new mission declaration states.<\/p>\n<p>Hercuton\u2019s\u00a0<strong>Daan Arts<\/strong>\u00a0has been vital in instilling BIM across JAJO companies, to the degree that it has become business as usual. \u201cLet\u2019s stop calling it BIM. Let\u2019s just call it the way that we work,\u201d he says.\u00a0<\/p>\n<p>Arts\u2019s title is no longer BIM Manager \u2013 he\u2019s been repositioned as the Manager of Digitalization and Innovation for Hercuton. \u201cIt\u2019s because we feel that we are ready to take the next step into the digitalization of this field,\u201d Arts explains.<\/p>\n<p>The company\u2019s digital workflows build on using IFC files enriched with linked data and digital documents on a CDE. They form \u201cthe single source of truth\u201d for a project, from the initial brief to the handover and beyond.<\/p>\n<p>\u201cWe use Revit to create IFCs. That\u2019s the only reason we have Revit. I want to emphasize this because my project managers and engineers work with IFCs,\u201d Arts stresses. \u201cWe are an open BIM organization.\u201d<\/p>\n<figure class=\"wp-block-image size-full\"><noscript><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"853\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Daan-Arts.jpg\" alt=\"-\" class=\"wp-image-2015127 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Daan-Arts.jpg 1280w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Daan-Arts-1200x800.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Daan-Arts-768x512.jpg 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\"><\/noscript><figcaption class=\"wp-element-caption\">Daan Arts, Hercuton<\/figcaption><\/figure>\n<h2 class=\"wp-block-heading\">Getting everyone onboard<\/h2>\n<p>Because BIM has become the backbone of the digital construction workflow, the models must be impeccable. Hercuton uses <a rel=\"nofollow noopener\" href=\"https:\/\/www.solibri.com\/solibri-office?utm_campaign=one-source-of-truth&amp;utm_source=Article&amp;utm_medium=Article-CDE\" target=\"_blank\">Solibri <\/a>for rule-based model checking during cost estimation and engineering, ensuring compliance with requirements, and highlighting possible discrepancies between the federated models.<\/p>\n<p>Typically, 80% of construction project tasks are carried out by subcontractors. That\u2019s why it\u2019s essential to include all of them in the digital workflow. Hercuton also offers access to the client. A CDE makes this possible and manageable.\u00a0<\/p>\n<p>Arts describes the way they work as the so-called hamburger model. On top, there\u2019s the bun denoting the design models \u2013 what to build. The bottom bun represents the suppliers\u2019 models \u2013 how to build. The \u201cmeat\u201d in the middle is how you communicate, by checking with Solibri that the production models comply with the design models and with each other throughout the process.<\/p>\n<h2 class=\"wp-block-heading\">Integrated BIM workflows on CDEs<\/h2>\n<p><strong>Lauri Luoma<\/strong>, <a rel=\"nofollow noopener\" href=\"https:\/\/www.solibri.com\" target=\"_blank\">Solibri\u2019<\/a>s Customer Success Manager, works with consulting firms and contractors worldwide. He helps them succeed with Solibri through training, sharing valuable insights, and paying attention to any issues they might have. He\u2019s their voice within Solibri.<\/p>\n<p>Even though CDEs have been around for years, Lauri sees that people still resort to email, instant messaging, and phone calls to exchange information. He does not suggest that every piece of information should be in the CDE, but that everyone should comply once there\u2019s an agreement on what is included.<\/p>\n<p>Luoma suggests that BIM coordinators should start fostering systematic use of CDEs, creating guidelines, and educating project teams on best practices.\u00a0<\/p>\n<p>\u201cInformation management is still kind of a Wild West,\u201d Luoma says. \u201cA CDE should not be just a place to store files but a way to manage revisions systematically.\u201d<\/p>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Lauri-Luoma.jpg\" alt=\"-\" class=\"wp-image-2015128 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Lauri-Luoma.jpg 1920w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-1200x675.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-768x432.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><noscript><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Lauri-Luoma.jpg\" alt=\"-\" class=\"wp-image-2015128 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/11\/Lauri-Luoma.jpg 1920w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-1200x675.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-768x432.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2023\/03\/Lauri-Luoma-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/noscript><figcaption class=\"wp-element-caption\">Lauri Luoma, Solibri, on the left<\/figcaption><\/figure>\n<h2 class=\"wp-block-heading\">Efficiencies through workflow automation<\/h2>\n<p>Digital workflows have become ingrained in the everyday life of designers and contractors. When building owners and maintenance companies join in, usability requirements increase. Professional BIM users also wish to avoid unnecessary complexity and manual operations.<\/p>\n<p>Automating workflows and standardizing collaboration procedures is difficult since software tools and CDEs can vary from project to project.<\/p>\n<p>\u201cOur aim is to bring quality assurance to the customer\u2019s workflow and integrate with their existing CDE,\u201d says Luoma.<\/p>\n<p>Solibri has direct integrations\u00a0with the most common CDEs and issue management platforms, such as BIM Sync,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/www.solibri.com\/one-source-of-truth\" target=\"_blank\">Autodesk Construction Cloud<\/a>, Dalux, and more. You can find the\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/hubs.ly\/Q01JFbhf0\" target=\"_blank\">full list of integrations here<\/a>.<\/p>\n<p>Solibri has recently been able to streamline BIM quality assurance on CDEs. Using the BCF standard,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/technical.buildingsmart.org\/standards\/bcf\/\" target=\"_blank\">BIM Collaboration Format,<\/a>\u00a0issue management runs seamlessly alongside the model validation and revisioning process.\u00a0<strong>Working directly with IFC models on a CDE is now possible without downloading and uploading the revised models.<\/strong>\u00a0This allows a CDE to become the single source of truth for both issues and IFC files.<\/p>\n<h2 class=\"wp-block-heading\">Achieving high-profit projects with quality-assured data<\/h2>\n<p>Aalto University\u2019s data-based research has shown that up to 70% of construction workers\u2019 time is wasted on non-value-added tasks. Office staff also uses a substantial portion of their workdays on the unnecessary hustle. Much of this waste results from poor communication, a lack of information, and rework caused by errors.<\/p>\n<p>According to the GRI,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/getitright.uk.com\/\" target=\"_blank\">Get It Right Initiative<\/a>, the direct costs of errors resulting mainly from defective or missing data are estimated to be 5% of the total project costs. If you add indirect costs, the total is over 10%.<\/p>\n<p>\u201cThe cost of fixing an issue during design is much lower than if you find it at the construction phase,\u201d Luoma reminds us.<\/p>\n<p>Taking better care of BIM quality and using CDEs comprehensively could increase the profitability of construction firms by several percentage points. Companies like Hercuton that cover the entire building process can seize this opportunity easier than projects with dispersed teams. But every project can do it if the participants commit to shared information management.<\/p>\n<h2 class=\"wp-block-heading\">More incentives from buildings\u2019 lifespan<\/h2>\n<p>Construction sites have started using BIM for procurement, planning, and installation. But there is still a data gap between construction, operations, and maintenance. A large amount of valuable information is lost or becomes obsolete.<\/p>\n<p>Around 2016, digital twins became a talking point in property management. Digital twins combine the virtual model of a building with real-time data captured from the physical building. The aim is to make building operations and maintenance proactive and efficient, saving time and cost and improving quality.<\/p>\n<p>This use of BIM as the basis for digital twins further reinforces the need for correct models enriched with relevant data. Trying to fix the models at handover is unnecessary if they have been kept up to date throughout the design and construction phases.<\/p>\n<p>Daan Arts admits that there\u2019s still some way to go before data flows seamlessly across the building life cycle, even within the same group. However, the aim of achieving carbon-neutral construction increases the pressure to manage material and product data better.<\/p>\n<p>Overall, consultants, contractors, and owners now have an unsurpassed opportunity to increase project profitability. The tools are there; it\u2019s now a question of jointly committing to better information management and taking decisive steps forward.<\/p>\n<p> <span class=\"et_social_bottom_trigger\"\/><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/aec-business.com\/supercharge-bim-workflows-with-a-single-source-of-truth\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Learn how Hercuton, a design &amp; build firm, uses a Common Data Environment to boost its business and how Solibri\u2019s &#8230; <a title=\"Supercharge BIM Workflows with a Single Source of Truth\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/supercharge-bim-workflows-with-a-single-source-of-truth\/\" aria-label=\"Read more about Supercharge BIM Workflows with a Single Source of Truth\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":23102,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[],"class_list":["post-23101","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aec-business","category-all-posts","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/23101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=23101"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/23101\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/23102"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=23101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=23101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=23101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}