{"id":24709,"date":"2024-02-01T04:52:37","date_gmt":"2024-02-01T12:52:37","guid":{"rendered":"https:\/\/essential.construction\/news\/pair-of-landmark-bridges-open-in-torontos-port-lands\/"},"modified":"2024-02-01T04:52:39","modified_gmt":"2024-02-01T12:52:39","slug":"pair-of-landmark-bridges-open-in-torontos-port-lands","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/pair-of-landmark-bridges-open-in-torontos-port-lands\/","title":{"rendered":"Pair of landmark bridges open in Toronto&#8217;s Port Lands"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<div id=\"attachment_1003981305\" style=\"width: 310px\" class=\"wp-caption alignright\"><a rel=\"magnific nofollow noopener\" href=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2024\/01\/Entuitive_Toronto_s_Port_Lands_Celebrates_the_Opening_of_Two_Lan-scaled.jpeg\" target=\"_blank\"><\/a><\/p>\n<p id=\"caption-attachment-1003981305\" class=\"wp-caption-text\">Cherry St. South Bridge with the newly opened Cherry St. North Bridge and roadway in the distance. (CNW Group\/Entuitive)<\/p>\n<\/div>\n<p>The two newest additions to Toronto\u2019s Port Lands Bridges are now open to the public. The bridges, says structural engineering consultancy Entuitive, signify a major step in the redevelopment of 500 acres of once underutilized land.<\/p>\n<p>Designed as modern, elegant, and eye-catching structures, the opening of the Cherry Street North and Commissioners Street bridges for vehicle, pedestrian, and cyclist traffic brings visitors into and around the future site of Villiers Island in style.<\/p>\n<p>Waterfront Toronto\u2019s Port Lands Flood Protection Enabling Infrastructure (PLFPEI) project called for innovative and aesthetically stunning bridges to be placed over current and future waterways in the area. The Port Lands Bridges, which are central to the $1.3 billion revitalization and regeneration effort, were designed by Entuitive, schlaich bergermann partner (sbp), and Grimshaw Architects.<\/p>\n<p>\u201cWe\u2019re pleased to celebrate the opening of Cherry Street North and Commissioners Street bridges, and to reflect on our rewarding and fruitful collaboration with sbp and Grimshaw, as well as our construction partners at EllisDon,\u201d stated Michael Meschino, principal at Entuitive. \u201cWaterfront Toronto is one step closer to completing one of the province\u2019s most exciting projects, and the creation of crucial infrastructure, a place to live, work and play, will be a truly remarkable transformation.\u201d<\/p>\n<p>The joint design effort led by Entuitive was also bolstered with direction from Waterfront Toronto and Construction Manager EllisDon, who led the construction process from fabrication to erection.<\/p>\n<p>\u201cWe are honoured to be a part of the physical transformation of the Toronto waterfront into a vibrant, active, and connected community,\u201d said Juan Porral, Ppartner at Grimshaw. \u201cThe Port Lands Bridges enable connectivity and ease of mobility, creating memorable gateways for pedestrians, cyclists, future streetcars, and vehicles onto and through the new Villiers Island.\u201d<\/p>\n<p>The bridges were designed as an aesthetically unified family of four and showcase innovative fabrication techniques alongside state-of-the-art engineering. The goal of the design was to create elegant and efficient structures that will function as both crossing points and compelling destinations for the public.<\/p>\n<p>The single-span Cherry Street North Road and LRT Bridges and the four-span Commissioners Street Bridge join the previously opened Cherry Street South Bridge. With three spans, the Cherry Street South Bridge crosses the new mouth of the Don River on the west side of Villiers Island and was opened in October 2022.<\/p>\n<p>\u201cThe Port Lands Bridges are a prime example of how creative teams of architects, engineers, contractors, and owners can come together and design beautiful bridges,\u201d stated Michael Stein, managing director of sbp. \u201cWe are thrilled to contribute to the evolution of Villiers Island with bridges that serve the community both as functional infrastructure and as engaging landmarks that improve the quality of their built environment.\u201d<\/p>\n<p>The family of Port Lands Bridges has been widely recognized with engineering and steel construction design awards in North America and Europe, including the Institution of Structural Engineers, the National Council of Structural Engineers Associations, the Structural Engineers Association of NY, and the Association of Consulting Engineers Companies for Ontario.<\/p>\n<p>\u201cFrom concept to construction there have been many challenges, which brought lots of opportunity for innovation and collaboration,\u201d explained Jonathan Werner, senior associate at Entuitive. \u201cSeeing the Port Lands Bridges open to the public for them to use and enjoy makes it all worthwhile.\u201d<\/p>\n<p>The PLFPEI project called for bridges that would reference the rich history of Toronto\u2019s waterfront while also supporting a livable and walkable future for the new neighbourhood.<\/p>\n<p>The design team arrived at a hybrid shell-arch bridge structure\u2014essentially curved tied arches with a planar deck connected by hangers. This self-anchoring curved-tied arch maximizes the material efficiency and reduces cost. Additionally, tied arches only create vertical reaction forces which reduce the size and complexity of the foundations.<\/p>\n<p>This was a key design consideration since the soil in the industrial area is contaminated and of poor quality and supporting foundations and piers were also limited by the site\u2019s flood protection plan.<\/p>\n<p>\u00a0<\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/www.entuitive.com\/\" target=\"_blank\">www.entuitive.com<\/a><\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/www.sbp.de\/\" target=\"_blank\">www.sbp.de<\/a><\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/www.grimshaw.global\/\" target=\"_blank\">www.grimshaw.global<\/a><\/p>\n<\/p><\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/bridges\/pair-of-landmark-bridges-open-in-torontos-port-lands\/1003981304\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=pair-of-landmark-bridges-open-in-torontos-port-lands\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cherry St. South Bridge with the newly opened Cherry St. North Bridge and roadway in the distance. (CNW Group\/Entuitive) The &#8230; <a title=\"Pair of landmark bridges open in Toronto&#8217;s Port Lands\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/pair-of-landmark-bridges-open-in-torontos-port-lands\/\" aria-label=\"Read more about Pair of landmark bridges open in Toronto&#8217;s Port Lands\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":24710,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[],"class_list":["post-24709","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-onsite-magazine","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/24709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=24709"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/24709\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/24710"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=24709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=24709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=24709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}