{"id":25653,"date":"2024-05-02T14:07:40","date_gmt":"2024-05-02T21:07:40","guid":{"rendered":"https:\/\/essential.construction\/news\/a-6-step-guide-to-improving-your-preventive-maintenance-program\/"},"modified":"2024-05-02T14:07:41","modified_gmt":"2024-05-02T21:07:41","slug":"a-6-step-guide-to-improving-your-preventive-maintenance-program","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/a-6-step-guide-to-improving-your-preventive-maintenance-program\/","title":{"rendered":"A 6-step Guide to Improving Your Preventive Maintenance Program"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<!-- AddThis Sharing Buttons above --><\/p>\n<p><span style=\"font-weight: 400;\">A preventive maintenance program is one of the key aspects of keeping your plant running smoothly. Without it, you will experience many failures and downtimes that can cost your organization up to millions of dollars.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you\u2019re a maintenance manager working in a highly reactive working environment, you\u2019re probably looking for ways to improve your Preventive Maintenance Program, right? But it can be difficult and overwhelming. Especially if you don\u2019t know where to start. In this article, we will detail 6 steps that will help you create a more efficient PM program.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">See, the problem with most organizations is that their Preventive Maintenance Programs are ineffective and inefficient. As John Moubray, the father of RCM II, pointed out in his book \u201cReliability Centered Maintenance\u201d\u2014\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cTypically, between 40%\u201360% of the PM tasks in a preventive maintenance program add little value.\u201d\u00a0\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">They are often filled with tasks that do not add value.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And that\u2019s because many organizations lack a systematic approach to matching the right type of maintenance to the failure mode that is being analyzed, leading to ineffective maintenance.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But it doesn\u2019t have to be that way. Improving a preventive maintenance program doesn\u2019t have to be complicated, expensive, or require fancy software as most organizations believe.\u00a0<\/span><\/p>\n<h2>Before Improving your Preventive Maintenance Program<\/h2>\n<p><span style=\"font-weight: 400;\">But before improving your PM program, you need to ensure that all parties involved in the process (including you) have a fundamental understanding of the <\/span><a rel=\"nofollow noopener\" href=\"https:\/\/roadtoreliability.com\/reliability-centered-maintenance-principles\/\" target=\"_blank\"><span style=\"font-weight: 400;\">9 Principles of Modern Maintenance<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Next, you need to be prepared to work with a diverse team. There will be input from different backgrounds, technical trades, and skills.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Finally, you need to start making decisions based on data and facts, rather than personal experiences or opinions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you have all those covered, then you can finally start improving your Preventive Maintenance Program.<\/span><\/p>\n<h2>Step 1: Analyze your Program<\/h2>\n<p><span style=\"font-weight: 400;\">The first step in improving your PM program is to look at what you are currently doing and see what is working and what isn\u2019t. Look at the equipment that is being maintained and the frequency of maintenance. And then, answer these guiding questions:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Are there any patterns or trends?\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Which equipment or parts have failed the most?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Which is the most expensive?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Which is taking you the longest amount of time?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Which task is the most common?<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">To help you answer these questions, collect information from your computerized maintenance management system (CMMS) and pinpoint the equipment or tasks that are causing issues in your preventive maintenance program. After which, use the data collected to identify areas that need improvement the most.<\/span><\/p>\n<h2>Step 2: Prioritize<\/h2>\n<p><span style=\"font-weight: 400;\">Once you have identified the areas that need improvement, you need to prioritize them. This means determining which areas are most critical and should be addressed first. If an equipment failure would have a significant impact on your organization, it should be given a higher priority. This step will help you focus on the most important areas and ensure that your resources are being used effectively.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Focusing on many tasks at a time can lead to frustration. A good rule of thumb is to start with tasks that are easy to do but can have a lot of impact for your organiszation. These types of tasks can build momentum and credibility for your improvement efforts, so it becomes easier to get the support that you need from your top management.<\/span><\/p>\n<h2>Step 3: Methodology<\/h2>\n<p><span style=\"font-weight: 400;\">After identifying and prioritizing your areas of focus, it\u2019s time to decide on the methodology you will use to improve your PM program. There are many different methodologies available, such as Reliability-centered Maintenance (RCM) and Preventive Maintenance Optimization (PMO).\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It\u2019s important to choose a methodology that is appropriate for your organization and the equipment you are working with. You can pick which is best for your situation by reading this article on the <\/span><a rel=\"nofollow noopener\" href=\"https:\/\/roadtoreliability.com\/types-of-maintenance\/\" target=\"_blank\"><span style=\"font-weight: 400;\">Types of Maintenance<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h2>Step 4: Test your Methodology<\/h2>\n<p><span style=\"font-weight: 400;\">Before implementing your methodology, you should test it to ensure that it is effective. Start with a small system that is relatively easy to deliver good results with. This will help you identify problems that need to be addressed before large-scale implementation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">After evaluating the PMs on a smaller scale, you can analyze the results, summarize the benefits, and present everything to management. Extrapolate the findings to the remaining opportunities identified in step 1 so you can build a business case for a larger improvement project.<\/span><\/p>\n<h2>Step 5: Initiate and deliver PM improvement project<\/h2>\n<p><span style=\"font-weight: 400;\">Once you have tested your methodology and made necessary adjustments, you can now start your PM improvement project. This step involves implementing the new approach across your organization and ensuring that all employees are trained and equipped to use it. It is important to communicate the changes to all employees and provide them with the support they need to make the transition. With that in mind, you will need to apply the necessary project management and change management principles to overcome resistance to implementation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here are some tips for successfully initiating and delivering your PM project:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Very specific methodologies like PMO and RCM can be difficult to deliver successfully because they require a large amount of expertise and resources. And if you fail, it will become more difficult to get support from your top management for future improvements.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">If you\u2019re hiring external contractors to implement RCM or PMO for you, you need to have support and commitment from all parties, not just for the initial pilot but also for the ongoing program. <\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">You don\u2019t need expensive technology or software to create a successful preventive maintenance program. <\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Make sure that you have effective work instructions that are sufficiently detailed, and properly controlled so that you reduce variability in task execution and improve the effectiveness of your PM Program.<\/span><\/li>\n<\/ol>\n<h2>Step 6: Create a system for evaluation and improvements<\/h2>\n<p><span style=\"font-weight: 400;\">The last step is to build a system for feedback, evaluation, and improvements into your PM program. This means regularly reviewing the program to see if it\u2019s working, and then making adjustments as needed. This step is important because it ensures that your PM program is continuously improving and stays current and effective.<\/span><\/p>\n<h2>Final Thoughts<\/h2>\n<p><span style=\"font-weight: 400;\">Improving your PM program doesn\u2019t have to be complicated. You just need to apply the basic principles of a modern maintenance program. And by following the six steps outlined in this article, you can improve your PM program and ensure that your equipment and machinery are functioning properly.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Remember to analyze your current program, prioritize areas for improvement, develop an effective methodology, test it, initiate and deliver the PM improvement project, and finally build a system for continuous improvement. With a well-designed and executed PM program, you can minimize downtime and prolong the life of your equipment.<\/span><\/p>\n<p>                <!-- AddThis Settings Begin --><\/p>\n<p>                <!-- AddThis Sharing Buttons below -->\n  <\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/blog.constructionmarketingassociation.org\/6-step-guide-improving-preventive-maintenance-program\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A preventive maintenance program is one of the key aspects of keeping your plant running smoothly. Without it, you will &#8230; <a title=\"A 6-step Guide to Improving Your Preventive Maintenance Program\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/a-6-step-guide-to-improving-your-preventive-maintenance-program\/\" aria-label=\"Read more about A 6-step Guide to Improving Your Preventive Maintenance Program\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":25654,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1065],"tags":[],"class_list":["post-25653","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-marketing","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/25653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=25653"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/25653\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/25654"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=25653"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=25653"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=25653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}