{"id":26021,"date":"2024-05-30T03:06:32","date_gmt":"2024-05-30T10:06:32","guid":{"rendered":"https:\/\/essential.construction\/news\/make-every-construction-project-succeed-with-visualleader\/"},"modified":"2024-05-30T03:06:35","modified_gmt":"2024-05-30T10:06:35","slug":"make-every-construction-project-succeed-with-visualleader","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/make-every-construction-project-succeed-with-visualleader\/","title":{"rendered":"Make Every Construction Project Succeed with VisualLeader"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"\">\n<p><strong>Ains<br \/>\nGroup has just released a digital service that radically changes the way<br \/>\nconstruction projects are managed. The concept consists of a new management process,<br \/>\na command center, and a situation awareness portal for project decision-makers and<br \/>\npartners. It aims to make every project reach its goals.<\/strong><\/p>\n<p> <span id=\"more-1009973\"\/><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright\"><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"500\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/jaakko-jauhiainen-ains.jpg\" alt=\"Jaakko Jauhiainen\" class=\"wp-image-1009987 lazyload\"\/><figcaption>Jaakko Jauhiainen<\/figcaption><\/figure>\n<\/div>\n<p><a rel=\"nofollow noopener\" aria-label=\"Ains Group (opens in a new tab)\" href=\"https:\/\/www.ains.fi\/en\/\" target=\"_blank\">Ains Group<\/a> has long been a trailblazer in the use of digital technologies, such as BIM, Virtual Reality, and Algorithmic Design. The company has now used their knowledge and skills to develop a completely new, visual project management solution called <em>VisualLeader<\/em>. The system supports decision-making, collaboration, and risk management. It has the potential to make successful projects a norm.<\/p>\n<p>The game-changing feature of the new concept is the VisualLeader portal with dashboards that visualize the leading and forecasting project indicators.<\/p>\n<p>\u201cIn practice, we offer an exhaustive picture of a project\u2019s condition: where we are, how we came to be here, and what are our prospects are for success,\u201d <strong>Jaakko Jauhiainen<\/strong>, the CTO of Ains Group, explains. \u201cThe information is in the cloud, available wherever and whenever you want.\u201d<\/p>\n<h2 class=\"wp-block-heading\">From Reactions to<br \/>\nPredictions<\/h2>\n<p>With 60 years in the construction management and engineering business and a portfolio of over 1500 projects annually, Ains Group knows what makes a project thrive. They\u2019ve also seen how things can go wrong if the client and the project team are not paying attention to certain early warning signs.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/Jyrki-Keinanen-Ains.jpg\" alt=\"Jyrki Kein\u00e4nen\" class=\"wp-image-1009988 lazyload\"\/><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"500\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/Jyrki-Keinanen-Ains.jpg\" alt=\"Jyrki Kein\u00e4nen\" class=\"wp-image-1009988 lazyload\"\/><figcaption>Jyrki Kein\u00e4nen<\/figcaption><\/figure>\n<\/div>\n<p>\u201cTraditionally, you have a rear mirror view of a construction project,\u201d says <strong>Jyrki Kein\u00e4nen<\/strong>, the CEO of Ains Group. \u201cProject forecasting methodology is underdeveloped, and the piles of printed monthly reports that are generated nowadays don\u2019t actually give a manager a comprehensive insight into the total situation or the project future.\u201d<\/p>\n<p>Ains Group has identified several factors that can indicate a project\u2019s success. Among these are the quantity and value of ideas and innovations, eNPS, the pace of payments, and emerging risks.<\/p>\n<p>\u201cProject staff work spirit is one of the key decisive barometers. There\u2019s a big difference between the performance of low-spirited and happy professionals. Teams in a flow state can be five times more productive,\u201d Kein\u00e4nen asserts.<\/p>\n<p>VisualLeader retrieves data on the key indicators and turns them into easy-to-comprehend dashboard visuals. You can drill down them to find opportunities for cost and time savings or to analyze root causes of eventual problems.<\/p>\n<h2 class=\"wp-block-heading\">The New Language of<br \/>\nEngagement is Visual<\/h2>\n<p>Drawings are generally not the best way to communicate the design intent with clients and users in a construction project. Ains Group uses CAVE technology to create immersive spatial simulations. This allows the client, users, consultants, and contractors to step into a real-size virtual building or environment, make observations, and discuss issues that need attention.<\/p>\n<p>CAVE is the<br \/>\nheart of the <em>VisualLeader Command Center<\/em>, a three-dimensional virtual reality<br \/>\nequivalent of the Big Room. All the project information is accessible through<br \/>\nthe center, and it has a video theater extended with three additional displays.<br \/>\nHence why it\u2019s referred to as CAVE<sup>3<\/sup>. The software<br \/>\nlets you take part in meetings remotely and to link several Command Centers<br \/>\nwith each other.<\/p>\n<p>\u201cFor the Tallinn railway tunnel project, for example, we could have interconnected Command Centers both in Helsinki and Tallinn for collaboration,\u201d Kein\u00e4nen says.<\/p>\n<p>He demonstrates the power of visualization with a metro model for this project. We drive the metro train down the tunnel, stop at a station, and watch trains come and go according to the timetable. It\u2019s a completely different experience from trying to make sense of traditional floorplans or static renderings.<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-users.jpg\" alt=\"-\" class=\"wp-image-1009982 lazyload\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"675\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-users.jpg\" alt=\"-\" class=\"wp-image-1009982 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-users.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-768x432.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-990x557.jpg 990w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-470x264.jpg 470w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-640x360.jpg 640w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-215x120.jpg 215w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-300x168.jpg 300w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-users-414x232.jpg 414w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"><figcaption>VisualLeader CAVE3<\/figcaption><\/figure>\n<h2 class=\"wp-block-heading\">A New Way to Manage<br \/>\nProjects<\/h2>\n<p>Of course, digital tools and data alone won\u2019t guarantee that a project will meet its original goals and business intent. You need a process that makes use of the advanced project management tools and techniques, and the data that the participants provide.<\/p>\n<p>\u201cWhether a project succeeds is often a question of management,\u201d Jauhiainen reminds. \u201cJust think of BMW. With lean management, they have been able to cut down factory construction time by 50%, without adding costs.\u201d<\/p>\n<p><em>A-Format<\/em>, a new management framework, is the third pillar of the concept. The model is compatible with the world-leading project management standard the PMBOK\u00ae. It ties together project phases and tasks, methods and services, and the client\u2019s decision-making milestones.<\/p>\n<p>Among the methods included in A-Format are clients\u2019 needs and business targets, Monte Carlo analysis, takt production, and the eNPS\u2013employee Net Promoter Score<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Dashboard.jpg\" alt=\"-\" class=\"wp-image-1009985 lazyload\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"587\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Dashboard.jpg\" alt=\"-\" class=\"wp-image-1009985 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Dashboard.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-Dashboard-768x376.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-Dashboard-990x484.jpg 990w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"><figcaption>VisualLeader: Project KPIs<\/figcaption><\/figure>\n<h2 class=\"wp-block-heading\">An In-House Development<\/h2>\n<p>Jauhiainen calls the newly launched VisualLeader a \u201cminimum viable product.\u201d It\u2019s an in-house development that is already being used in first projects, and more are in the pipeline.<\/p>\n<p>The software runs on Microsoft Azure and will integrate with project management tools, jobsite apps, and enterprise systems. Currently, VisualLeader has an interface with Scudo, risk management tools, and Congrid, a jobsite safety and quality audit app. Integration can be created between VisualLeader and any other system, such as SAP, when needed.<\/p>\n<p>The user interface of VisualLeader is well-designed, and void of distractions and gimmicks. \u00a0It is intuitive for any manager to use.<\/p>\n<h2 class=\"wp-block-heading\">A Tool for a Global Clientele<\/h2>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Innovations.jpg\" alt=\"-\" class=\"wp-image-1009983 lazyload\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"587\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Innovations.jpg\" alt=\"-\" class=\"wp-image-1009983 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/05\/VisualLeader-Innovations.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-Innovations-768x376.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/08\/VisualLeader-Innovations-990x484.jpg 990w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"><figcaption>VisualLeader: Investment cost savings<\/figcaption><\/figure>\n<p>\u201cWe think VisualLeader will mainly act as a safeguard for the investor. They will know where their money is going and if they are getting what they ordered for,\u201d says Kein\u00e4nen. \u201cAn investor doesn\u2019t have to rely on a monthly report. Instead, they can keep tabs on a project anywhere and anytime, whether in Singapore or on a trip to Los Angeles. With CAVE3, they can even develop the project in real-time with the project team.\u201d<\/p>\n<p>Ains Group\u2019s cumulative, project-specific Net Promoter Score is 73, which is considered \u201cworld class\u201d in any industry. It gives weight to their promise to create value, collaboratively and better, and always on schedule with VisualLeader.<\/p>\n<p>The company has won many international accolades for their various projects around the world, spanning 70 countries to date. VisualLeader opens new opportunities for Ains Group to expand its operations worldwide. Their mission to improve the productivity of construction resonates well with the aspirations of clients and construction managers all around the world.<\/p>\n<p> <span class=\"et_social_bottom_trigger\"\/><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/aec-business.com\/make-every-construction-project-succeed-with-visualleader\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ains Group has just released a digital service that radically changes the way construction projects are managed. The concept consists &#8230; <a title=\"Make Every Construction Project Succeed with VisualLeader\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/make-every-construction-project-succeed-with-visualleader\/\" aria-label=\"Read more about Make Every Construction Project Succeed with VisualLeader\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":26022,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[298,1162],"class_list":["post-26021","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aec-business","category-all-posts","tag-construction","tag-smart-construction","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/26021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=26021"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/26021\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/26022"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=26021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=26021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=26021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}