{"id":26144,"date":"2024-06-09T15:35:15","date_gmt":"2024-06-09T22:35:15","guid":{"rendered":"https:\/\/essential.construction\/news\/robotics-for-architecture-and-construction-an-interview-with-lauren-vasey\/"},"modified":"2024-06-09T15:35:17","modified_gmt":"2024-06-09T22:35:17","slug":"robotics-for-architecture-and-construction-an-interview-with-lauren-vasey","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/robotics-for-architecture-and-construction-an-interview-with-lauren-vasey\/","title":{"rendered":"Robotics for Architecture and Construction &#8211; An Interview with Lauren Vasey"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"\">\n<p>What\u2019s the state of robotic construction today and how will it develop in the future? <strong>Lauren Vasey<\/strong> shares her views in this <a rel=\"nofollow\" href=\"#podcast\">podcast interview<\/a>.<\/p>\n<p> <span id=\"more-1009740\"\/><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/06\/Lauren-Vasey.jpg\" alt=\"-\" class=\"wp-image-1009744 lazyload\" width=\"400\" height=\"500\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/06\/Lauren-Vasey.jpg 800w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/Lauren-Vasey-768x960.jpg 768w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\"><figcaption>Lauren Vasey<\/figcaption><\/figure>\n<\/div>\n<p>Lauren Vasey is a researcher, educator, and designer investigating robotics and automation within architecture and construction. Since 2014, she has been a Research Associate at the <a rel=\"nofollow noopener\" href=\"https:\/\/icd.uni-stuttgart.de\/\" target=\"_blank\" aria-label=\"Institute for Computational Design and Construction at the University of Stuttgart (opens in a new tab)\">Institute for Computational Design and Construction at the University of Stuttgart<\/a>, where her work has focused on developing feedback-driven robotic construction processes that enable robots to sense and react to their environment. This research has been leveraged to investigate innovative material systems, and new forms of collaboration, including multi-robot and human-robot collaborative processes.\u00a0<\/p>\n<p>Her teaching and research have been recognized in international competitions including the Kuka Innovation Award as well as\u00a0 AEC Hackathons. She has extensively collaborated with external research partners including Autodesk Research and recently the European Space Agency.\u00a0<\/p>\n<p><a rel=\"nofollow\" href=\"#podcast\">In the interview<\/a>, we discuss the following topics:<\/p>\n<ul>\n<li>Why we should be interested in robotic construction right now<\/li>\n<li>When does on-site robotics become feasible and for what purposes<\/li>\n<li>Algorithmic design, digital fabrication, and robotics<\/li>\n<li>Humans and robots working together on a construction site<\/li>\n<li>How robotics could they change the construction industry<\/li>\n<li>Recent exciting examples of robotic construction<\/li>\n<li>How to start experimenting with robotics in your business<\/li>\n<\/ul>\n<p>You can connect with Lauren <a rel=\"nofollow noopener\" href=\"https:\/\/www.linkedin.com\/in\/laurenvasey\/\" target=\"_blank\">on LinkedIn<\/a>.<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/06\/robotic-construction-structure.jpg\" alt=\"-\" class=\"wp-image-1009747 lazyload\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/06\/robotic-construction-structure.jpg\" alt=\"-\" class=\"wp-image-1009747 lazyload\" srcset=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2024\/06\/robotic-construction-structure.jpg 1920w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-1200x675.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-768x432.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-990x557.jpg 990w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-1320x743.jpg 1320w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-470x264.jpg 470w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-640x360.jpg 640w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-215x120.jpg 215w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-300x168.jpg 300w, https:\/\/aec-business.com\/wp-content\/uploads\/2019\/07\/robotic-construction-structure-414x232.jpg 414w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/figure>\n<h2 class=\"wp-block-heading\" id=\"podcast\">Listen to the interview (also on iTunes, Spotify, and several podcast platforms)<\/h2>\n<p class=\"powerpress_links powerpress_links_mp3\" style=\"margin-bottom: 1px !important;\">Podcast: <a rel=\"nofollow noopener\" href=\"http:\/\/media.blubrry.com\/aecbusiness\/aec-business.s3.amazonaws.com\/Lauren-Vasey-interview.mp3\" class=\"powerpress_link_pinw\" target=\"_blank\" title=\"Play in new window\" onclick=\"return powerpress_pinw(&#039;https:\/\/aec-business.com\/?powerpress_pinw=1009740-podcast&#039;);\">Play in new window<\/a> | <a rel=\"nofollow noopener\" href=\"http:\/\/media.blubrry.com\/aecbusiness\/aec-business.s3.amazonaws.com\/Lauren-Vasey-interview.mp3\" class=\"powerpress_link_d\" title=\"Download\" download=\"Lauren-Vasey-interview.mp3\" target=\"_blank\">Download<\/a><\/p>\n<p class=\"powerpress_links powerpress_subscribe_links\">Subscribe: <\/p>\n<p><span class=\"et_social_bottom_trigger\"\/><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/aec-business.com\/robotics-for-architecture-and-construction-an-interview-with-lauren-vasey\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What\u2019s the state of robotic construction today and how will it develop in the future? Lauren Vasey shares her views &#8230; <a title=\"Robotics for Architecture and Construction &#8211; An Interview with Lauren Vasey\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/robotics-for-architecture-and-construction-an-interview-with-lauren-vasey\/\" aria-label=\"Read more about Robotics for Architecture and Construction &#8211; An Interview with Lauren Vasey\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":26145,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[],"class_list":["post-26144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aec-business","category-all-posts","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/26144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=26144"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/26144\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/26145"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=26144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=26144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=26144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}