{"id":28716,"date":"2025-01-23T12:14:37","date_gmt":"2025-01-23T20:14:37","guid":{"rendered":"https:\/\/essential.construction\/news\/tentative-agreement-reached-between-pego-and-tbs\/"},"modified":"2025-01-23T12:14:37","modified_gmt":"2025-01-23T20:14:37","slug":"tentative-agreement-reached-between-pego-and-tbs","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/tentative-agreement-reached-between-pego-and-tbs\/","title":{"rendered":"Tentative agreement reached between PEGO and TBS"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div id=\"attachment_1003984268\" style=\"width: 310px\" class=\"wp-caption alignright\"><a rel=\"magnific nofollow noopener\" href=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1003984268\" class=\"size-medium wp-image-1003984268\" src=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-300x50.jpg\" alt=\"-\" width=\"300\" height=\"50\" srcset=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-300x50.jpg 300w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-1024x169.jpg 1024w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-768x127.jpg 768w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-250x41.jpg 250w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional-600x99.jpg 600w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/01\/Professional_Engineers_Government_of_Ontario__PEGO__Professional.jpg 1060w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" data-mwl-img-id=\"1003984268\"><\/a><\/p>\n<p id=\"caption-attachment-1003984268\" class=\"wp-caption-text\">(CNW Group\/Professional Engineers Government of Ontario)<\/p>\n<\/div>\n<p style=\"font-weight: 400;\">The Ontario government and the Professional Engineers Government of Ontario (PEGO) bargaining team have announced a tentative collective agreement with the Treasury Board Secretariat (TBS). If ratified, the four-year agreement would run until the end of 2026.<\/p>\n<p style=\"font-weight: 400;\">PEGO-represented engineering and land surveying experts work in 11 ministries and agencies, performing project management, oversight and enforcement roles related to the provincial highway network, the Ontario Building Code, land surveying, fire safety, food and workplace safety, clean air, and safe drinking water. In addition to working on the government\u2019s ambitious $185 billion dollar infrastructure building plans, PEGO members also oversee the maintenance of more than $85 billion worth of already existing public infrastructure in Ontario, including the 400 series highways.<\/p>\n<p style=\"font-weight: 400;\">The proposed agreement, which needs to be ratified by PEGO members, follows more than 18 months of bargaining and PEGO\u2019s first-ever strike action in its 35-year history.<\/p>\n<p style=\"font-weight: 400;\">\u201cOur government was elected to build Ontario for the next generation, including building more roads, highways, hospitals and homes. This plan to build makes Ontario one of the most competitive jurisdictions in the world,\u201d stated Caroline Mulroney, president of the Treasury Board. \u201cIf ratified, today\u2019s four-year tentative agreement with PEGO delivers on that commitment by preventing unnecessary and costly delays to those critical infrastructure projects.\u201d<\/p>\n<p style=\"font-weight: 400;\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.ontario.ca\/\" target=\"_blank\">www.ontario.ca<\/a><\/p>\n<p style=\"font-weight: 400;\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.pego.on.ca\/\" target=\"_blank\">www.pego.on.ca<\/a><\/p>\n<hr\/>\n<p><a rel=\"nofollow noopener\" class=\"btn btn-default btn-xs pull-right\" href=\"https:\/\/www.on-sitemag.com\/construction\/tentative-agreement-reached-between-pego-and-tbs\/1003984267\/javascript:window.print()\" target=\"_blank\"><i class=\"icon-print\"\/> Print this page<\/a>\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t<!-- end of .navigation -->\n\t\t\t<\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/construction\/tentative-agreement-reached-between-pego-and-tbs\/1003984267\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] (CNW Group\/Professional Engineers Government of Ontario) The Ontario government and the Professional Engineers Government of Ontario (PEGO) bargaining team &#8230; <a title=\"Tentative agreement reached between PEGO and TBS\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/tentative-agreement-reached-between-pego-and-tbs\/\" aria-label=\"Read more about Tentative agreement reached between PEGO and TBS\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[1185],"class_list":["post-28716","post","type-post","status-publish","format-standard","hentry","category-onsite-magazine","tag-professional-engineers-government-of-ontario-pegolabor-union-newsusn","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28716","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28716"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28716\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28716"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28716"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28716"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}