{"id":28756,"date":"2025-01-25T12:40:52","date_gmt":"2025-01-25T20:40:52","guid":{"rendered":"https:\/\/essential.construction\/news\/catching-up-on-nearly-two-years-of-construction-at-olive-residences\/"},"modified":"2025-01-25T12:40:52","modified_gmt":"2025-01-25T20:40:52","slug":"catching-up-on-nearly-two-years-of-construction-at-olive-residences","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/catching-up-on-nearly-two-years-of-construction-at-olive-residences\/","title":{"rendered":"Catching Up on Nearly Two Years of Construction at Olive Residences"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Situated in the heart of Willowdale in North York, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/olive-residences.46462\" target=\"_blank\">Olive Residences<\/a> at 36 Olive Avenue is rising just a short walk east of Finch station on Yonge Line 1. Shoring for what was then to be a 29-storey tower \u2014\u00a0designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arcadis.8006\" target=\"_blank\">Arcadis<\/a>\u00a0for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/capital-developments.7671\" target=\"_blank\">Capital Developments<\/a>\u00a0\u2014 got underway in early 2023. Now heading for 31 storeys,\u00a0construction has now reached 25 storeys, with cladding and glazing following more than halfway up the tower.<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, 31-storey version, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-ff2b9c3b-9753-4bae-a2c2-0aebdb40ed41\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179239.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179239.jpg', true, ''); return false;\" title=\"Looking northeast to Olive Residences, 31-storey version, designed by Arcadis for Capital Developments\"\/><span class=\"image-description\">Looking northeast to Olive Residences, 31-storey version, designed by Arcadis for Capital Developments<\/span><\/p>\n<p>The site was cleaved off the south half of a site at 31 Finch Avenue East where a three-storey Bell Canada substation faces Finch (the back of which can be seen below), and is just west of Doris Avenue, North York City Centre&#8217;s eastern north-south collector road. Looking north in July, 2023, excavation progresses for the three levels of underground garage. An excavator rests at grade beside the pit, while two additional machines are in use within the pit. Wooden lagging lines the east and west excavation walls, while the north wall is concrete.<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-009777f4-2aae-4f13-927d-68f31c1d26bd\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179240.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179240.jpg', true, ''); return false;\" title=\"Looking north to the excavation and excavators onsite, July, 2023, image by Ed Skira\"\/><span class=\"image-description\">Looking north to the excavation and excavators onsite, July, 2023, image by Ed Skira<\/span><\/p>\n<p>With the pit finished in October, 2023, the crane was installed by early November, 2023, and by the end of December, 2023, the lowest slab had been completed and columns to support the levels above were being formed.<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-a9cd3ccd-3dac-4281-abe5-39a6c376a6b2\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179241.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179241.jpg', true, ''); return false;\" title=\"Looking into the worksite on December 31, 2023, image by Edward Skira\"\/><span class=\"image-description\">Looking into the worksite on December 31, 2023, image by Edward Skira<\/span><\/p>\n<p>By March, 2024, Olive Residences had reached grade. In the image below, the crane rises in front of 35 Finch Avenue East. Along Olive Avenue, hoarding and a vehicle access gate are set up. At the southwest corner, the concrete columns for the double-height lobby stand tall.\u00a0<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-2c401c6c-202a-4682-972c-b0abf4f9763d\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179242.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179242.jpg', true, ''); return false;\" title=\"Olive Residences reached grade in March, 2024, image by Edward Skira\"\/><span class=\"image-description\">Olive Residences reached grade in March, 2024, image by Edward Skira<\/span><\/p>\n<p>In early April, 2024, Capital Developments submitted a minor variance application to the City of Toronto seeking an increase to 33 storeys with adjustments to parking and unit counts. The application was approved the following month, but in October, 2024, a Site Plan Approval application established the final design at 31 storeys. In the meantime, construction continued. Looking south from Finch Avenue in August, 2024, the tower was rising over the podium, with approximately 12 storeys formed.\u00a0<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-dbeba010-fcff-4ff6-ae79-1ba6e4e62441\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179184.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179184.jpg', true, ''); return false;\" title=\"The step-backs and massing along the east elevation, looking south, image by UrbanToronto Forum contributor achandi\"\/><span class=\"image-description\">The step-backs and massing along the east elevation, looking south, image by UrbanToronto Forum contributor achandi<\/span><\/p>\n<p>Looking northeast from above Yonge Street in December, 2024, we see white powder-coated aluminum framing at the southwest corner, rising as high as the 16th storey along with the glazing. The construction hoist can be seen rising along the west elevation. Above, formwork is underway on the 24th and 25th floors.<\/p>\n<p><imgx alt=\"Olive Residences, Toronto, designed by Arcadis for Capital Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-50e95fd4-f456-40c3-a56e-d6286d3a0f75\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179243.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57832\/57832-179243.jpg', true, ''); return false;\" title=\"Olive Residences reached garde in December, 2024, image by Edward Skira\"\/><span class=\"image-description\">Olive Residences reached garde in December, 2024, image by Edward Skira<\/span><\/p>\n<p>Olive Residences will rise to a final height of 104.74m and bring 379 condominium units to the area when complete.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arcadis.8006\" target=\"_blank\">Arcadis<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/baker-real-estate-incorporated.8187\" target=\"_blank\">Baker Real Estate Incorporated<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/capital-developments.7671\" target=\"_blank\">Capital Developments<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/clark-construction-management-inc.38114\" target=\"_blank\">Clark Construction Management Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/counterpoint-engineering.36004\" target=\"_blank\">Counterpoint Engineering<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gradient-wind-engineers-scientists.43829\" target=\"_blank\">Gradient Wind Engineers &amp; Scientists<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kramer-design-associates-limited.22923\" target=\"_blank\">Kramer Design Associates Limited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/lea-consulting.36299\" target=\"_blank\">LEA Consulting<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/platinum-condo-deals.53331\" target=\"_blank\">Platinum Condo Deals<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/fence-people.48575\" target=\"_blank\">The Fence People<\/a><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/01\/catching-nearly-two-years-construction-olive-residences.57832\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Situated in the heart of Willowdale in North York, Olive Residences at 36 Olive Avenue is rising just a &#8230; <a title=\"Catching Up on Nearly Two Years of Construction at Olive Residences\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/catching-up-on-nearly-two-years-of-construction-at-olive-residences\/\" aria-label=\"Read more about Catching Up on Nearly Two Years of Construction at Olive Residences\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-28756","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28756"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28756\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}