{"id":28773,"date":"2025-01-27T00:36:04","date_gmt":"2025-01-27T08:36:04","guid":{"rendered":"https:\/\/essential.construction\/news\/design-contract-awarded-for-98m-electronic-warfare-regiment-facility-in-kingston\/"},"modified":"2025-01-27T00:36:04","modified_gmt":"2025-01-27T08:36:04","slug":"design-contract-awarded-for-98m-electronic-warfare-regiment-facility-in-kingston","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/design-contract-awarded-for-98m-electronic-warfare-regiment-facility-in-kingston\/","title":{"rendered":"Design contract awarded for $98M electronic warfare regiment facility in Kingston"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>KINGSTON, ONT. \u2014 Construction has officially started and a design contract has been awarded for the new 21 Electronic\u00a0Warfare Regiment\u00a0facility at Canadian Forces\u00a0Base (CFB)\u00a0Kingston.<\/p>\n<p>Colbourne &amp; Kembel Architects Inc. of Kingston will be undertaking the design work.<\/p>\n<p>The\u00a0$98-million,\u00a08,350 m<sup>2\u00a0 <\/sup>facility will consolidate units across CFB Kingston into one secure compound, explains a release.<\/p>\n<p>The two-storey multipurpose building will include new classrooms and administrative spaces, and it will also house the Logistics Vehicle Modernization platforms, light and heavy trucks, and the Electronic Warfare, Mobile Repair Team and Maintenance Recovery Vehicle variants of the Armoured Combat Support Vehicle. Maintenance bays will also be constructed.<\/p>\n<p>The facility will be built to meet the Canada Green Building Council\u2019s Zero-Carbon Building Performance Standards.<\/p>\n<p>High-efficiency heating and cooling systems and onsite solar power generation to offset the building\u2019s electrical demand are some measures being carried out.<\/p>\n<p>The\u00a021 Electronic\u00a0Warfare Regiment is comprised of both reserve and regular force members and provides tactical electronic warfare support to Canadian Armed Forces operations. This support can take a variety of forms, such as intercepting and analyzing foreign communications, and installing and maintaining radio, satellite, and broadband technology.<\/p>\n<p>During construction, the project will sustain approximately\u00a0150 jobs\u00a0in the region, the release adds, and it is expected to be operational in 2028.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/infrastructure\/2025\/01\/design-contract-awarded-for-98m-electronic-warfare-regiment-facility-in-kingston\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] KINGSTON, ONT. \u2014 Construction has officially started and a design contract has been awarded for the new 21 Electronic\u00a0Warfare &#8230; <a title=\"Design contract awarded for $98M electronic warfare regiment facility in Kingston\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/design-contract-awarded-for-98m-electronic-warfare-regiment-facility-in-kingston\/\" aria-label=\"Read more about Design contract awarded for $98M electronic warfare regiment facility in Kingston\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-28773","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28773"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28773\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}