{"id":28845,"date":"2025-01-31T12:56:27","date_gmt":"2025-01-31T20:56:27","guid":{"rendered":"https:\/\/essential.construction\/news\/plans-in-for-200m-middlesbrough-regen-scheme\/"},"modified":"2025-01-31T12:56:27","modified_gmt":"2025-01-31T20:56:27","slug":"plans-in-for-200m-middlesbrough-regen-scheme","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/plans-in-for-200m-middlesbrough-regen-scheme\/","title":{"rendered":"Plans in for \u00a3200m Middlesbrough regen scheme"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-494506\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Property developers iMpeC and Buccleuch Property are seeking approval from Middlesbrough Development Corporation for more than 230 build-to-rent properties, and a 450-bed student accommodation block at a derelict site in Gresham.<\/p>\n<p>International hotel brand Fairfield by Marriott is also in discussions to open a 200-bedroom hotel as part of the wide-scale regeneration project.<\/p>\n<p>Contractor Wates is in line to deliver the project which would be the largest single investment in Middlesbrough in a generation.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Unknown-12.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-494509\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Unknown-12.jpeg\" alt=\"-\" width=\"775\" height=\"465\"><\/a><\/p>\n<p>Subject to planning permission and MDC board approval, building work on the project could start as soon as early summer 2025.<\/p>\n<p>Tees Valley Mayor and Middlesbrough Development Corporation Chairman Ben Houchen said: \u201cThis incredible development is proof of how our Development Corporation is making a huge difference to the future of Middlesbrough town centre.<\/p>\n<p>\u201cThis site has stood empty and unloved for far too long but in just a short space of time we have helped support this project which would see the biggest one-off investment in Middlesbrough in living memory.\u201d<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/01\/31\/plans-in-for-200m-middlesbrough-regen-scheme\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Property developers iMpeC and Buccleuch Property are seeking approval from Middlesbrough Development Corporation for more than 230 build-to-rent properties, &#8230; <a title=\"Plans in for \u00a3200m Middlesbrough regen scheme\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/plans-in-for-200m-middlesbrough-regen-scheme\/\" aria-label=\"Read more about Plans in for \u00a3200m Middlesbrough regen scheme\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-28845","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28845"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28845\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}