{"id":28846,"date":"2025-01-31T12:57:28","date_gmt":"2025-01-31T20:57:28","guid":{"rendered":"https:\/\/essential.construction\/news\/cielo-condos-emerges-above-grade-as-construction-advances\/"},"modified":"2025-01-31T12:57:28","modified_gmt":"2025-01-31T20:57:28","slug":"cielo-condos-emerges-above-grade-as-construction-advances","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/cielo-condos-emerges-above-grade-as-construction-advances\/","title":{"rendered":"Cielo Condos Emerges Above Grade as Construction Advances"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cielo-condos.29486\" target=\"_blank\">Cielo Condos<\/a> is no longer confined to the depths of its foundation. As the new year gets underway, the future 34-storey tower is emerging above grade in Toronto\u2019s Annex neighbourhood. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kpmb-architects.8018\" target=\"_blank\">KPMB Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/collecdev-markee-developments.25215\" target=\"_blank\">Collecdev-Markee Developments<\/a>, with <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/era-architects.7982\" target=\"_blank\">ERA Architects<\/a> overseeing heritage preservation aspects, the project incorporates the heritage George C. Pidgeon House and walls of\u00a0the Bloor Street United Church into its podium, combining contemporary high-rise living with century-old architecture.\u00a0<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, designed by KPMB Architects for Collecdev-Markee Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-f67f2500-a4f7-4339-beb7-cc3ec79a5141\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179510.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179510.jpeg', true, ''); return false;\" title=\"An aerial view looking south to Cielo Condos, designed by KPMB Architects for Collecdev-Markee Developments\"\/><span class=\"image-description\">An aerial view looking south to Cielo Condos, designed by KPMB Architects for Collecdev-Markee Developments<\/span><\/p>\n<p>UrbanToronto last provided an update in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2024\/11\/drone-flights-capture-sub-grade-construction-cielo-condos.57462\" target=\"_blank\">November, 2024<\/a>, when sub-grade construction was advancing. Now, the long-awaited vertical ascent of Cielo Condos is getting underway.<\/p>\n<p>Looking north from Bloor Street in January, 2025, all below-grade formwork is now completed, along with waterproofing of the exterior foundation walls. Rising at the centre, the crane stands adjacent to a red concrete boom pump. Vertical rebar protrudes from the snow-covered site. To the right is the Gothic Revival stonework of the Bloor Street United Church, and across the site, stacked materials rest on the completed ground floor slab, while safety railings and temporary barriers define work zones.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, designed by KPMB Architects for Collecdev-Markee Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-97b0b3e7-8a64-4684-92be-a7d1e8fca8ec\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179511.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179511.jpeg', true, ''); return false;\" title=\"Looking north from Bloor Street to the concrete boom pump and tower crane, image by UrbanToronto Forum contributor enter username\"\/><span class=\"image-description\">Looking north from Bloor Street to the concrete boom pump and tower crane, image by UrbanToronto Forum contributor enter username<\/span><\/p>\n<p>Turning to a view facing southeast across the site, we see the formwork in place below grade towards the north end. The crane, encircled by rebar, stands just northeast of the concrete boom pump. The site is prepared for the upcoming installation of mechanical, electrical, and ventilation equipment below grade, a key step before the automatic parking system trade contractor begins assembling the structure and conveyor system. Above, the church&#8217;s interior walls remain wrapped in protective weatherproofing, supported by the heritage retention scaffold system.<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, designed by KPMB Architects for Collecdev-Markee Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-06c73807-42d8-4f07-a0c0-6dece1f20680\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179512.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179512.jpeg', true, ''); return false;\" title=\"Looking southeast to rebar and formwork at grade level, image by UrbanToronto Forum contributor enter username\"\/><span class=\"image-description\">Looking southeast to rebar and formwork at grade level, image by UrbanToronto Forum contributor enter username<\/span><\/p>\n<p>In this east-facing drone image from earlier this week, the full scope of construction is on display, with the luffing-jib crane\u2019s boom extending high over the site. The final pour for the ground floor slab was completed this week, and across the site, materials are staged at grade, with stacks of rebar and formwork concentrated around the crane and concrete boom pump. A square pit enclosed by red fencing is visible toward the south, near Bloor Street, while additional materials lie covered in snow at the north end, adjacent to the heritage retention scaffold system for the George C. Pidgeon House on the left. With walls and column formwork for the ground floor now progressing, the first walls, cast last week, are visible at the northwest corner (bottom right).<\/p>\n<p><imgx alt=\"Cielo Condos, Toronto, designed by KPMB Architects for Collecdev-Markee Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-a9250c6d-9daa-47f0-888e-125ff1015b7e\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179514.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/01\/57892\/57892-179514.jpg', true, ''); return false;\" title=\"An aerial view looking east to construction at Cielo Condos, image courtesy of Collecdev-Markee\"\/><span class=\"image-description\">An aerial view looking east to construction at Cielo Condos, image courtesy of Collecdev-Markee<\/span><\/p>\n<p>With the first pour of the second-floor slab scheduled for mid-February, 2025, Cielo Condos is heading\u00a0for a final height of 130.35m, housing 349 residential units.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/01\/cielo-condos-emerges-above-grade-construction-advances.57892\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Cielo Condos is no longer confined to the depths of its foundation. As the new year gets underway, the &#8230; <a title=\"Cielo Condos Emerges Above Grade as Construction Advances\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/cielo-condos-emerges-above-grade-as-construction-advances\/\" aria-label=\"Read more about Cielo Condos Emerges Above Grade as Construction Advances\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-28846","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28846"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28846\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}