{"id":28869,"date":"2025-02-01T12:58:29","date_gmt":"2025-02-01T20:58:29","guid":{"rendered":"https:\/\/essential.construction\/news\/strucktor-wins-record-me-package-from-ardmore\/"},"modified":"2025-02-01T12:58:29","modified_gmt":"2025-02-01T20:58:29","slug":"strucktor-wins-record-me-package-from-ardmore","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/strucktor-wins-record-me-package-from-ardmore\/","title":{"rendered":"Strucktor wins record M&#038;E package from Ardmore"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-494497\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The <em>Enquirer<\/em> understands the full mechanical, electrical, and plumbing (MEP) package is worth up to \u00a350m on the scheme to construct three new buildings totalling 540,000 sq ft featuring laboratories, homes, shops and restaurants.<\/p>\n<p>Strucktor will start on site in March with a peak workforce of 120 operatives.<\/p>\n<p>The Tribeca contract is the latest deal in the ongoing collaboration between Ardmore and Strucktor following their successful joint efforts on high-profile projects such as The OWO hotel, The Whiteley, Holland Park Gate, and West King Street.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/01\/31\/strucktor-wins-record-me-package-from-ardmore\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The Enquirer understands the full mechanical, electrical, and plumbing (MEP) package is worth up to \u00a350m on the scheme &#8230; <a title=\"Strucktor wins record M&#038;E package from Ardmore\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/strucktor-wins-record-me-package-from-ardmore\/\" aria-label=\"Read more about Strucktor wins record M&#038;E package from Ardmore\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-28869","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28869"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28869\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}