{"id":28881,"date":"2025-02-02T13:01:01","date_gmt":"2025-02-02T21:01:01","guid":{"rendered":"https:\/\/essential.construction\/news\/plan-for-film-studios-switched-to-data-centre-cluster\/"},"modified":"2025-02-02T13:01:01","modified_gmt":"2025-02-02T21:01:01","slug":"plan-for-film-studios-switched-to-data-centre-cluster","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/plan-for-film-studios-switched-to-data-centre-cluster\/","title":{"rendered":"Plan for film studios switched to data centre cluster"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-494471\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The plans replace a previously approved scheme to build a film studio complex which hit the buffers when the promoter collapsed.<\/p>\n<p>Under the new plan, the data centres will be built on a 13ha site in the south corner of Wycombe Air Park.<\/p>\n<p>Nexus Planning put together the application for the data centre halls, substation and a gatehouse totalling around 580,000 sq ft.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-01-30-at-16.20.58.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-494475\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-01-30-at-16.20.58.png\" alt=\"-\" width=\"2218\" height=\"1514\"><\/a><\/p>\n<p>Planning documents estimate construction costs will be in the region of \u00a3265m over a five-year build programme, sustaining 2,280 construction jobs.<\/p>\n<p>Ollie Bell, Director of Nexus Planning, said: \u201cThe creation of this <span class=\"outlook-search-highlight\" data-markjs=\"true\">data <\/span>centre responds to clear market requirements, addressing a significant need for <span class=\"outlook-search-highlight\" data-markjs=\"true\">data<\/span><span class=\"outlook-search-highlight\" data-markjs=\"true\">centres<\/span> in the UK, particularly in London and the South East of England. The development presents many opportunities on both a local and national level.\u201d<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/01\/30\/plan-for-film-studios-switched-to-data-centre-cluster\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The plans replace a previously approved scheme to build a film studio complex which hit the buffers when the &#8230; <a title=\"Plan for film studios switched to data centre cluster\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/plan-for-film-studios-switched-to-data-centre-cluster\/\" aria-label=\"Read more about Plan for film studios switched to data centre cluster\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-28881","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28881"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28881\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}