{"id":28900,"date":"2025-02-04T01:04:42","date_gmt":"2025-02-04T09:04:42","guid":{"rendered":"https:\/\/essential.construction\/news\/crest-nicholson-slumps-to-144m-loss\/"},"modified":"2025-02-04T01:04:42","modified_gmt":"2025-02-04T09:04:42","slug":"crest-nicholson-slumps-to-144m-loss","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/crest-nicholson-slumps-to-144m-loss\/","title":{"rendered":"Crest Nicholson slumps to \u00a3144m loss"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>He said the house builder was working hard to draw a line under the expected cost of future fire remediation works and had also revised up site completion costs at two now-closed divisions.<\/p>\n<p>Total exceptional charges reported for the year to October 2024 soared to \u00a3166m, including an extra \u00a3132m to replace combustible materials and \u00a325m for other remedial work at completed sites.<\/p>\n<p>It brings Crest\u2019s total provision so far for safety remediation works to \u00a3249m.<\/p>\n<p>Clark took the helm at Crest last June, joining from Persimmon where he was chief commercial officer.<\/p>\n<p>He said the latest big provisions followed intensive work to assess all future risks with all building surveys expected to complete this summer.<\/p>\n<p>Crest spent \u00a333m last year across several buildings requiring further investigative costs and remediation works, including balcony and cladding-related works.<\/p>\n<p>Clark also revealed that Crest had identified that controls were not operating effectively at the now-closed London and Regeneration divisions<\/p>\n<p>The control weaknesses related to the divisions\u2019 management and forecasting of build costs and margin. After a review Crest has made a \u00a325m further writedown to complete defects at four sites.<\/p>\n<p>Clark said: <span class=\"bjn\">\u201cMy initial focus has been on implementing early operational changes at pace, and ensuring we have a solid foundation for the years ahead.<\/span><\/p>\n<p class=\"bjx\"><span class=\"bjn\">\u201cAs part of that, I have reviewed the existing executive committee to ensure we have the right breadth of expertise and capability, in order to enhance decision-making, strengthen internal controls, address operational challenges and drive future strategic priorities.<\/span><\/p>\n<p class=\"bjx\"><span class=\"bjn\">\u201cI have also made considerable progress in reviewing our strategy and defining my long-term vision for Crest Nicholson to re-invigorate the business for growth.\u201d<\/span><\/p>\n<p>He added: \u201c2025 will be a year of transition for Crest Nicholson as we implement and start to deliver on our new strategy for profitable growth.<\/p>\n<p>\u201cWe are well-positioned with sufficient land with full planning permission to support our planned outlets and volumes.\u201d<\/p>\n<p>The outcome of the top level business review will be announced in March.<\/p>\n<p>Over last year revenue slipped 6% to \u00a3618m, with pre-exceptional operating profit down 38% to \u00a331m.<\/p>\n<p>Completions were down 7% to 1,873 homes.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/02\/04\/crest-nicholson-slumps-to-144m-loss\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] He said the house builder was working hard to draw a line under the expected cost of future fire &#8230; <a title=\"Crest Nicholson slumps to \u00a3144m loss\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/crest-nicholson-slumps-to-144m-loss\/\" aria-label=\"Read more about Crest Nicholson slumps to \u00a3144m loss\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-28900","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28900"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28900\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}