{"id":28939,"date":"2025-02-06T13:12:18","date_gmt":"2025-02-06T21:12:18","guid":{"rendered":"https:\/\/essential.construction\/news\/skanska-lands-design-role-on-1-25bn-steelworks\/"},"modified":"2025-02-06T13:12:18","modified_gmt":"2025-02-06T21:12:18","slug":"skanska-lands-design-role-on-1-25bn-steelworks","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/skanska-lands-design-role-on-1-25bn-steelworks\/","title":{"rendered":"Skanska lands design role on \u00a31.25bn steelworks"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Sir Robert McAlpine was awarded the the main, civil, structural and building works last week for the construction of a new electric arc furnace-based steel production facility that will produce around three million tonnes of steel per year.<\/p>\n<p>Under the latest deal, Skanska\u2019s Technology business will provide civil and structural design for key sections of the project.<\/p>\n<p>This includes design for building foundations and structures, including for the new electric arc furnace. In addition, the team will design site infrastructure and drainage.<\/p>\n<p>Susan Ryall, Engineering and Design Director at Skanska UK said: \u201cWe have been working closely with Tata Steel for the past four years, developing the design and project management solution for this complex scheme.<\/p>\n<p>\u201cWe have a long history of delivering civil engineering works at Port Talbot. Building on this experience, we have worked collaboratively with the site team, using our technical expertise to create a solution that meets the needs of this project.<\/p>\n<p>\u201cWe are delighted to have been appointed and be playing our part in delivering this new electric arc furnace, helping to safeguard jobs across the UK, improve the environment and create new opportunities in the region.\u201d<\/p>\n<p>A technical team from Skanska will be embedded with Tata Steel at Port Talbot, working alongside McAlpine.<\/p>\n<p>Tata Steel UK\u2019s Head of Project Engineering, Dave Murray, added: \u201cThis \u00a31.25bn investment in low CO2 steelmaking is the biggest commitment the UK steel industry has seen in generations. It is critical that it is delivered on specification, on time and on budget, so it is important for us to choose the very best industrial partners with a strong reputation for delivery.<\/p>\n<p>\u201cWe have worked closely with Skanska for a number of years, so have a good understanding of how their world-class capabilities fit in well with our own, and we are looking forward to working with them on this project.\u201d<\/p>\n<p>The design and project management contract will be led by Skanska\u2019s Technology team based at Bridgend, South Wales \u2013 supporting local employment and creating a platform for future growth.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/02\/06\/skanska-lands-design-role-on-1-25bn-steelworks\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Sir Robert McAlpine was awarded the the main, civil, structural and building works last week for the construction of &#8230; <a title=\"Skanska lands design role on \u00a31.25bn steelworks\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/skanska-lands-design-role-on-1-25bn-steelworks\/\" aria-label=\"Read more about Skanska lands design role on \u00a31.25bn steelworks\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-28939","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28939"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28939\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}