{"id":28940,"date":"2025-02-06T13:14:26","date_gmt":"2025-02-06T21:14:26","guid":{"rendered":"https:\/\/essential.construction\/news\/39-storey-tower-proposed-near-laird-lrt-station-in-leaside\/"},"modified":"2025-02-06T13:14:26","modified_gmt":"2025-02-06T21:14:26","slug":"39-storey-tower-proposed-near-laird-lrt-station-in-leaside","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/39-storey-tower-proposed-near-laird-lrt-station-in-leaside\/","title":{"rendered":"39-Storey Tower Proposed Near Laird LRT Station in Leaside"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Spurred by the coming\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/crosstown-lrt.47725\" target=\"_blank\">Eglinton Line 5 Crosstown LRT<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/diamond-corp.7697\" target=\"_blank\">Diamond Corp<\/a>\u00a0has submitted an application for a high-rise proposal in Leaside within the area designated as a Major Transit Station Area near Laird station. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/superkul.9158\" target=\"_blank\">Superk\u00fcl<\/a>, a 39-storey mixed-use tower is in the planning process at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/20-brentcliffe-road.57762\" target=\"_blank\">20 Brentcliffe Road<\/a>.<\/p>\n<p><imgx alt=\"20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cceb0c26-28ac-4216-a1e9-d8e0c8e91d51\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179684.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179684.jpg', true, ''); return false;\" title=\"An aerial view looking northwest to 20 Brentcliffe Road, designed by Superk\u00fcl for DiamondCorp\"\/><span class=\"image-description\">An aerial view looking northwest to 20 Brentcliffe Road, designed by Superk\u00fcl for DiamondCorp<\/span><\/p>\n<p>The site is the southern parcel of a larger development block. Originally designated as Employment Areas, the block was subject to a 2013 Official Plan Amendment request seeking conversion to Mixed Use Areas. A 2015 Local Planning Appeal Tribunal ruling paved the way for high-rise residential and a public park on the northern and central portions, while the southern section remained non-residential.\u00a0<\/p>\n<p><imgx alt=\"Block Context Plan, 20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-3486144c-9922-4318-a0e3-b65b85b9d2dc\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179689.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179689.jpg', true, ''); return false;\" title=\"Block Context Plan, image from submission to City of Toronto\"\/><span class=\"image-description\">Block Context Plan, image from submission to City of Toronto<\/span><\/p>\n<p>Addressed to 100 Vanderhoof Avenue as well as 20 Brentcliffe Road, the site spans 4,870m\u00b2 at the northwest corner of those roads. It is currently occupied by a one- to two-storey commercial building with surface parking, a remnant of the area\u2019s low-rise, auto-oriented past. The surrounding commercial neighbourhood is witnessing mid- and high-rise residential development activity while a mix of retail and other commercial persists.<\/p>\n<p><imgx alt=\"20 Brentcliffe Road, Toronto, Google Maps\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cc17fe6e-246d-4714-8773-dd45746fe9ca\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179691.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179691.jpg', true, ''); return false;\" title=\"Looking north to the current site, image retrieved from Google Maps\"\/><span class=\"image-description\">Looking north to the current site, image retrieved from Google Maps<\/span><\/p>\n<p>The developer has submitted Official Plan and Zoning By-law Amendment applications to the City of Toronto to permit a tower at a height of 126.8m, atop a five-storey podium extending along Vanderhoof Avenue. Of the total 475 residential units, 5% of the total residential Gross Floor Area (GFA) would be allocated as affordable housing for 25 years.\u00a0<\/p>\n<p><imgx alt=\"Site plan, 20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-4bd22a5b-a64e-467b-ace9-409ac4d3523b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179687.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179687.jpg', true, ''); return false;\" title=\"Site plan, designed by Superk\u00fcl for DiamondCorp\"\/><span class=\"image-description\">Site plan, designed by Superk\u00fcl for DiamondCorp<\/span><\/p>\n<p>The 30,628m\u00b2 total GFA would be divided into 29,500m\u00b2 of residential space and 1,128m\u00b2 of ground-floor retail. A 468m\u00b2 parkland dedication at the northeast corner would expand the public park to the north, alongside a midblock pedestrian connection. At 4,870m\u00b2 in area, the proposed GFA results in a Floor Space Index (FSI) of 5.63 times lot coverage, increasing to 6.95 post-parkland conveyance.<\/p>\n<p><imgx alt=\"Public park and podium, 20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-54fe29a2-a9c1-48c1-9805-c8bc9a91fcd2\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179685.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179685.jpg', true, ''); return false;\" title=\"Looking south to the public park and podium, designed by Superk\u00fcl for DiamondCorp\"\/><span class=\"image-description\">Looking south to the public park and podium, designed by Superk\u00fcl for DiamondCorp<\/span><\/p>\n<p>Residents would have access to 1,661m\u00b2 of indoor and 986m\u00b2 of outdoor amenities, primarily atop the podium on the 6th floor. The building would be served by four residential elevators or approximately one per 119 units. High-speed motors would be required for adequate service. A two-level underground garage would provide 171 motor vehicle spaces for residents, 6 shared between retail and visitors, and 1 car-share space. Provisions for cyclists include 432 long-term and 96 short-term spaces, located in an enclosed space on Level 2 and at grade.<\/p>\n<p><imgx alt=\"Ground floor plan, 20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-79f78595-c607-433a-b445-d94559cec502\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179688.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179688.jpg', true, ''); return false;\" title=\"Ground floor plan, designed by Superk\u00fcl for DiamondCorp\"\/><span class=\"image-description\">Ground floor plan, designed by Superk\u00fcl for DiamondCorp<\/span><\/p>\n<p>The site is about 300m or a three-minute walk southeast of <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/crosstown-lrt-laird-station.17790\" target=\"_blank\">Laird station<\/a> on the upcoming LRT, currently awaiting an opening date as deficiencies are addressed. A TTC bus stop\u00a0250m away at Eglinton Avenue East and Brentcliffe Road\u00a0provides access to surface routes. Bike lanes along Eglinton Avenue offer dedicated cycling infrastructure, though connections remain limited outside of nearby off-street trails in the West Don Valley ravine. Looking ahead,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-3.47842\" target=\"_blank\">Ontario Line 3<\/a> will have an interchange with Line 5 at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-science-centre-station.47578\" target=\"_blank\">Ontario Science Centre station<\/a>, approximately 2.1km east, once that line, now under construction is complete in about 6 years time.<\/p>\n<p><imgx alt=\"Aerial view, 20 Brentcliffe Road, Toronto\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-107af858-93aa-4804-98b3-5d785495da15\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179690.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179690.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image from submission to City of Toronto\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p>The proposal would rise amid a wave of high-rise development in Leaside. Directly north, the 28-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/frederick-condominiums.46592\" target=\"_blank\">Frederick Condominiums<\/a> is under construction, while to the south, a two-storey retail plaza is underway at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/70-wicksteed.44363\" target=\"_blank\">70 Wicksteed Avenue<\/a>, while to the west, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/849-eglinton-east.48429\" target=\"_blank\">849 Eglinton East<\/a> would bring three towers up to 40 storeys. Closer to Laird station, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/815-eglinton-avenue-east.22515\" target=\"_blank\">815 Eglinton Avenue East<\/a> proposes eight towers from 5 to 34 storeys. East of the site, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/hyde-park-leaside.46656\" target=\"_blank\">Hyde Park Leaside<\/a> envisions four towers ranging from 16 to 28 storeys, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1075-leslie.49552\" target=\"_blank\">1075 Leslie<\/a> would introduce five towers alongside <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/auberge-park.15183\" target=\"_blank\">Auberge on the Park<\/a>\u00a0with towers climbing to 45 storeys, the tallest two at 49 storeys, while further east, major projects under construction include <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/one-crosstown-towers-i-ii-iii-and-crest.40580\" target=\"_blank\">One Crosstown Towers I, II, III, and The Crest<\/a> with towers reaching 39 storeys.<\/p>\n<p><imgx alt=\"20 Brentcliffe Road, Toronto, designed by Superk\u00fcl for DiamondCorp\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-6ad573d8-c2d7-42e7-9be6-7aff72b055ab\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179686.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57925\/57925-179686.jpg', true, ''); return false;\" title=\"Looking north to 20 Brentcliffe Road, designed by Superk\u00fcl for DiamondCorp\"\/><span class=\"image-description\">Looking north to 20 Brentcliffe Road, designed by Superk\u00fcl for DiamondCorp<\/span><\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/02\/39-storey-tower-proposed-near-laird-lrt-station-leaside.57925\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Spurred by the coming\u00a0Eglinton Line 5 Crosstown LRT, Diamond Corp\u00a0has submitted an application for a high-rise proposal in Leaside &#8230; <a title=\"39-Storey Tower Proposed Near Laird LRT Station in Leaside\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/39-storey-tower-proposed-near-laird-lrt-station-in-leaside\/\" aria-label=\"Read more about 39-Storey Tower Proposed Near Laird LRT Station in Leaside\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-28940","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=28940"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/28940\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=28940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=28940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=28940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}