{"id":29021,"date":"2025-02-11T00:22:35","date_gmt":"2025-02-11T08:22:35","guid":{"rendered":"https:\/\/essential.construction\/news\/pcl-stantec-selected-for-121m-san-francisco-biogas-build\/"},"modified":"2025-02-11T00:22:35","modified_gmt":"2025-02-11T08:22:35","slug":"pcl-stantec-selected-for-121m-san-francisco-biogas-build","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/pcl-stantec-selected-for-121m-san-francisco-biogas-build\/","title":{"rendered":"PCL, Stantec selected for $121M San Francisco biogas build"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><\/p>\n<p>            <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/images\/audio_icon.svg?482016190122\" alt=\"-\"><\/p>\n<p>        Listen to the article<br \/>\n        <span class=\"text-to-speech__button__audio-length\">2 min<\/span><br \/>\n    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"http:\/\/res.cloudinary.com\/dmgi9movl\/video\/upload\/q_1\/v1738951808\/news\/text_to_speech\/pcl-stantec-san-francisco-renewable-biogas_xdnor3.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><span><span><span><span><strong><span><span>Award: <\/span><\/span><\/strong><\/span><\/span><\/span><\/span><span><span><span><span><span><span><span>Biogas utilization project<\/span><\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><span><strong><span><span>Value: <\/span><\/span><\/strong><\/span><\/span><\/span><\/span><span><span><span><span><span><span><span>$121 million<\/span><\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><span><strong><span><span>Location: <\/span><\/span><\/strong><\/span><\/span><\/span><\/span><span><span><span><span><span><span><span>San Francisco<\/span><\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><span><strong><span><span>Client: <\/span><\/span><\/strong><\/span><\/span><\/span><\/span><span><span><span><span><span><span><span>San Francisco Public Utilities Commission<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span><span>Edmonton, Alberta-based construction firm PCL Construction and engineering company Stantec have won a <\/span><\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.pcl.com\/ca\/en\/newsroom\/press-releases\/pcl-construction-stantec-selected-for-121-million-san-francisco-biogas-utilization-project\" target=\"_blank\"><span><span><span><span><span><span><span><span><span>$121 million fixed price design-build contract<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span><span> for the Southeast Treatment Plant Biogas Utilization Project in San Francisco, according to a Jan. 23 news release from PCL.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>PCL, whose U.S. headquarters are in Denver, expects to complete construction of the project in early 2027, per the release. Stantec, also based in Edmonton, is acting as lead designer on the build, and is underway with the full-scale design of the facility.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>The project will treat the biogas, generated as a byproduct of wastewater treatment at the Southeast Treatment Plant, in the new digesters to transform it to renewable natural gas quality for injection into the nearby Pacific Gas and Electric gas pipeline, per the release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>PCL said the project would reduce emissions and support the city\u2019s renewable energy goals. The system consists of state-of-the-art gas conditioning and separation processes, which will prepare the renewable natural gas for injection into the existing gas pipeline.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>The plant, which is the city\u2019s largest wastewater treatment facility, handles about 80% of San Francisco\u2019s combined stormwater and wastewater and treats an average of 57 million gallons of wastewater per day, according to PCL.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span><span>\u201cWe\u2019re excited once again to collaborate with the San Francisco Public Utilities Commission and Stantec on a project that not only advances sustainability but also delivers long-term value to the community,\u201d said Richard Hewitt, PCL\u2019s vice president and district manager for its Civil Infrastructure division, in the release.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/pcl-stantec-san-francisco-renewable-biogas\/739582\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 2 min This audio is auto-generated. Please let us know if you have feedback. Award: &#8230; <a title=\"PCL, Stantec selected for $121M San Francisco biogas build\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/pcl-stantec-selected-for-121m-san-francisco-biogas-build\/\" aria-label=\"Read more about PCL, Stantec selected for $121M San Francisco biogas build\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-29021","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29021"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29021\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}