{"id":29046,"date":"2025-02-12T13:29:29","date_gmt":"2025-02-12T21:29:29","guid":{"rendered":"https:\/\/essential.construction\/news\/farrans-lands-leeds-bradford-airport-phase-2-upgrade\/"},"modified":"2025-02-12T13:29:29","modified_gmt":"2025-02-12T21:29:29","slug":"farrans-lands-leeds-bradford-airport-phase-2-upgrade","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/farrans-lands-leeds-bradford-airport-phase-2-upgrade\/","title":{"rendered":"Farrans lands Leeds Bradford Airport phase 2 upgrade"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-494886\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Farrans is currently working on the Phase 1 terminal extension, which is scheduled for completion in the summer of 2025.<\/p>\n<p>Under the new Phase 2 contract, Farrans will focus on refurbishing the existing terminal, with an expected completion date in winter 2026.<\/p>\n<p>The renovation will be carried out in multiple sub-phases to minimise disruption for customers and ensure that the airport can operate as normally as possible.<\/p>\n<p>Planned improvements include the addition of new staircases, lifts, and escalators to create a more open and welcoming environment that complements the new, brighter terminal extension.<\/p>\n<p>The redesigned internal spaces will enhance passenger flow, and new security and arrivals facilities will be introduced, along with World Duty Free shops and various bars and restaurants.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/02\/12\/farrans-lands-leeds-bradford-airport-phase-2-upgrade\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Farrans is currently working on the Phase 1 terminal extension, which is scheduled for completion in the summer of &#8230; <a title=\"Farrans lands Leeds Bradford Airport phase 2 upgrade\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/farrans-lands-leeds-bradford-airport-phase-2-upgrade\/\" aria-label=\"Read more about Farrans lands Leeds Bradford Airport phase 2 upgrade\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29046","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29046","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29046"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29046\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29046"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29046"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}