{"id":29079,"date":"2025-02-15T01:36:56","date_gmt":"2025-02-15T09:36:56","guid":{"rendered":"https:\/\/essential.construction\/news\/settlement-offer-increases-tower-to-19-storeys-across-from-high-park\/"},"modified":"2025-02-15T01:36:56","modified_gmt":"2025-02-15T09:36:56","slug":"settlement-offer-increases-tower-to-19-storeys-across-from-high-park","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/settlement-offer-increases-tower-to-19-storeys-across-from-high-park\/","title":{"rendered":"Settlement Offer Increases Tower to 19 Storeys Across From High Park"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>A settlement offer for a\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1930-1938-bloor-west.51759\" target=\"_blank\">contested proposal<\/a> in Toronto\u2019s High Park area has been accepted by City Council. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/baron-nelson-architects-inc.46043\" target=\"_blank\">Baron Nelson Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/old-stonehenge-development-corporation.19452\" target=\"_blank\">Old Stonehenge Development <\/a>and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/clifton-blake-group.19454\" target=\"_blank\">Clifton Blake Group<\/a>, the site at 1930 through 1938 Bloor Street West, and 3 through 21 Quebec Avenue\u00a0is adjacent to High Park station, and therefore within its Major Transit Station Area where the Province encourages greater density.<\/p>\n<p><imgx alt=\"1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-030e2748-ac5e-44c6-a066-9eeedcf2631e\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180026.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180026.jpg', true, ''); return false;\" title=\"Looking northeast to 1930-1938 Bloor West, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\"\/><span class=\"image-description\">Looking northeast to 1930-1938 Bloor West, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group<\/span><\/p>\n<p>The development site is an assembly of four properties\u00a0of approximately 1,437m\u00b2 in area at the northeast corner of Bloor Street and Quebec Avenue. Currently, the site hosts low-rise buildings, including a daycare, commercial spaces, and 12 residential rental units. High Park lies directly to the south across Bloor Street, while the surrounding area includes a mix of apartment buildings, house-form buildings, mid-rise developments, and commercial uses.<\/p>\n<p><imgx alt=\"1930-1938 Bloor West, Toronto\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-85d0e8b4-e232-4113-9299-24e677d70b1f\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180035.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180035.jpg', true, ''); return false;\" title=\"Looking northwest to the current site, image from submission to City of Toronto\"\/><span class=\"image-description\">Looking northwest to the current site, image from submission to City of Toronto<\/span><\/p>\n<p>Initially proposed at 17 storeys and refused by the City, continuing discussions between the developers and City staff led to a revised plan, addressing concerns over massing and setbacks. City Council accepted the settlement offer with revised massing and height, now 19 storeys, at a meeting on February 5.<\/p>\n<p><imgx alt=\"Previous design, 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-91edd62f-602a-4063-a425-54b7fa82074f\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180024.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180024.jpg', true, ''); return false;\" title=\"Looking northeast to the previous design by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\"\/><span class=\"image-description\">Looking northeast to the previous design by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group<\/span><\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/goodmans-llp.44110\" target=\"_blank\">Goodmans LLP<\/a> submitted the without-prejudice settlement offer letter to the City of Toronto on behalf of the developers. Rising to a height of 69.51m, increased from 62.31m, the plan includes a total Gross Floor Area of 12,629m\u00b2, with 12,263m\u00b2 allocated to residential uses and 365m\u00b2 for retail at grade. The building would have a Floor Space Index of 8.79 times lot coverage, and contain 132 condominium units plus 12 replacement rental units.<\/p>\n<p><imgx alt=\"Site plan, 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-59735774-d632-456d-9efe-19e1995230cc\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180032.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180032.jpg', true, ''); return false;\" title=\"Site plan, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\"\/><span class=\"image-description\">Site plan, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group<\/span><\/p>\n<p>The revised design reduces the podium height along Bloor from six storeys to four, with the fifth-floor step-back 2 metres from the west and south facades. Meanwhile, the tower floor-plate has been reduced from 855m\u00b2 to 648m\u00b2, both moving under the City&#8217;s preference of maximum 750m\u00b2\u00a0floor-plates, and providing more separation between it and the property to the east.<\/p>\n<p><imgx alt=\"1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-d4e8eb2e-86f0-4642-a483-247168c71bf5\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180025.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180025.jpg', true, ''); return false;\" title=\"An aerial view looking southwest to 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\"\/><span class=\"image-description\">An aerial view looking southwest to 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group<\/span><\/p>\n<p>The building would offer 288m\u00b2 of indoor amenities and 288m\u00b2 of outdoor amenities, located on the second floor and penthouse level. The building\u2019s three elevators would result in a ratio of one elevator per 48 units, indicating minimal wait times for residents. A three-level underground garage would provide 60 residential parking spaces and three visitor spaces. For cyclists, the plan includes 130 long-term and 29 short-term spaces.\u00a0<\/p>\n<p><imgx alt=\"Ground floor plan, 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-2c2ba62b-9681-44eb-8ae1-4aeaf6e35ae7\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180033.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180033.jpg', true, ''); return false;\" title=\"Ground floor plan, 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group\"\/><span class=\"image-description\">Ground floor plan, 1930-1938 Bloor West, Toronto, designed by Baron Nelson Architects for Old Stonehenge Development Corporation &amp; Clifton Blake Group<\/span><\/p>\n<p>The site is located just 100m south of High Park Station on Bloor Line 2. Two stations east, Dundas West provides connections to GO Transit\u2019s Kitchener Line and the UP Express. The area is also served by TTC surface routes, with buses operating along High Park Avenue. For cyclists, dedicated bike lanes run along Bloor Street West, offering a continuous east-west route through the city, though it is possible that the provincial government will rip them up. High Park\u2019s trail system connects to the waterfront bike paths.<\/p>\n<p><imgx alt=\"Aerial view, 1930-1938 Bloor West, Toronto\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-36b5f441-e597-4bcd-91f9-0c2f93a3b671\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180034.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57975\/57975-180034.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image from submission to City of Toronto\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p>There is significant development activity near the site. To the east is a stale proposal at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/12-high-park-avenue-micro-retail-and-nursery.20434\" target=\"_blank\">12 High Park Avenue<\/a> for a 3-storey micro-retail and nursery, while the existing\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/high-park-village.24425\" target=\"_blank\">High Park Village<\/a>\u00a0rental complex would add three more towers ranging from 11 to 35 storeys. Similarly, other Tower-in-the-Park style developments in the area are also subject to infill proposals\u00a0 such as\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/299-glenlake.32718\" target=\"_blank\">299 Glenlake<\/a>,\u00a0planned at 11 storeys, while\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/111-pacific-avenue.25537\" target=\"_blank\">111 Pacific Avenue<\/a> features two towers at 24 and 30 storeys, and at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/21-oakmount-road.56910\" target=\"_blank\">21 Oakmount Road<\/a> there are two additional towers proposed at 35 and 43 storeys.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/02\/settlement-offer-increases-tower-19-storeys-across-high-park.57975\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A settlement offer for a\u00a0contested proposal in Toronto\u2019s High Park area has been accepted by City Council. Designed by &#8230; <a title=\"Settlement Offer Increases Tower to 19 Storeys Across From High Park\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/settlement-offer-increases-tower-to-19-storeys-across-from-high-park\/\" aria-label=\"Read more about Settlement Offer Increases Tower to 19 Storeys Across From High Park\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-29079","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29079"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29079\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}