{"id":29133,"date":"2025-02-19T13:48:19","date_gmt":"2025-02-19T21:48:19","guid":{"rendered":"https:\/\/essential.construction\/news\/six-tower-development-proposed-near-georgetown-go\/"},"modified":"2025-02-19T13:48:19","modified_gmt":"2025-02-19T21:48:19","slug":"six-tower-development-proposed-near-georgetown-go","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/six-tower-development-proposed-near-georgetown-go\/","title":{"rendered":"Six-Tower Development Proposed Near Georgetown GO"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>A proposal at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/130-mountainview-road-north.57979\" target=\"_blank\">130 Mountainview Road North<\/a> beside Georgetown GO station would bring the largest development yet to the Town of Halton Hills to the northwest of Toronto. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arcadis.8006\" target=\"_blank\">Arcadis<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gilbach.40093\" target=\"_blank\">Gilbach<\/a>, the multi-tower project&#8217;s towers would rise between 17 and 22 storeys. The site is within the Georgetown GO Major Transit Station Area (MTSA) where the Province encourages density.\u00a0<\/p>\n<p><imgx alt=\"130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-9e12da44-4ba2-4266-bce5-ca6fe919ba9b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180118.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180118.jpg', true, ''); return false;\" title=\"Looking east to 130 Mountainview Road North, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">Looking east to 130 Mountainview Road North, designed by Arcadis for Gilbach<\/span><\/p>\n<p>The 2.85-hectare site is at the southwest corner of Mountainview Road North and River Drive. Mostly vacant, the brownfield site has a long industrial history, dating back to the 1930s when it was linked to a paper coating mill. The surrounding area is a mix of low- and medium-density housing, employment lands, and industrial properties slated for redevelopment. To the south, the CN Rail corridor carries GO Transit and freight trains, while a mix of low-density homes and small employment uses line the tracks. To the west, light industrial buildings designated for future high-density development sit closer to the station.<\/p>\n<p><imgx alt=\"Aerial view, 130 Mountainview Road North, Halton Hills\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-83c807f4-869b-4f73-9d5f-28f535a62a6a\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180122.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180122.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image from submission to Town of Halton Hills\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to Town of Halton Hills<\/span><\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mhbc-planning.24647\" target=\"_blank\">MHBC Planning<\/a> has submitted Official Plan Amendment, Zoning By-law Amendment, and Draft Plan of Subdivision applications to the Town of Halton Hills on behalf of the developer. The proposal envisions three buildings containing six towers, with five atop shared podiums except for the tallest tower, rising between 17 and 22 storeys (65.3m to 81.3m). Each building would feature a four-storey podium with a mezzanine and two transition storeys. A new L-shaped public road would run through the site, linking Mountainview and River.<\/p>\n<p><imgx alt=\"Site plan, 130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-2c8b5f07-d59a-4e12-bd0b-66f6b51d5afd\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180123.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180123.jpg', true, ''); return false;\" title=\"Site plan, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">Site plan, designed by Arcadis for Gilbach<\/span><\/p>\n<p>\u00a0<\/p>\n<p>The development would introduce 1,481 residential units of unspecified tenure, ranging from studio to three-bedroom layouts. The total Gross Floor Area(GFA)\u00a0 would be 129,739m\u00b2, with a Floor Space Index of 4.56 times coverage of the lot. Of the GFA, 129,214m\u00b2 would be dedicated to residential use, and the remainder of 525 m\u00b2 for retail facing the corner of Mountainview and River.<\/p>\n<p><imgx alt=\"130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-ba237dbc-00b7-4987-9c99-3dc6a3b42b0b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180117.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180117.jpg', true, ''); return false;\" title=\"Looking northwest to the podiums fronting Mountainview Road, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">Looking northwest to the podiums fronting Mountainview Road, designed by Arcadis for Gilbach<\/span><\/p>\n<p>\u00a0<\/p>\n<p>The development would feature 5,924m\u00b2 of amenities, evenly split between indoor and outdoor areas. With three elevators per tower and six in the tallest building, there would be approximately one elevator for every 66 to 74 units per building, indicating adequate service. A 2,721m\u00b2 POPS (Privately-Owned Publicly-accessible Space) is planned mid-block, with a total of 6,640m\u00b2 landscaped open space.<\/p>\n<p><imgx alt=\"Ground floor plan, 130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-097d2923-02a2-4c34-85c6-38d5710d7e79\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180124.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180124.jpg', true, ''); return false;\" title=\"Ground floor plan, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">Ground floor plan, designed by Arcadis for Gilbach<\/span><\/p>\n<p>Parking would be accommodated across three underground levels and within the podiums above grade. There would be 1,333 spaces for residents and 148 for visitors and retail. Bicycle parking provisions include 1,037 long-term and 34 short-term spaces.<\/p>\n<p>Georgetown GO provides rail service between Kitchener and Toronto\u2019s Union station, along with a VIA Rail stop on the Toronto-London-Sarnia line. Multiple GO Bus routes also serve the area. While existing cycling infrastructure is limited, long-term plans include a buffered bike lane on Mountainview Road North and a signed bike route with sharrows on River Drive. A proposed off-road trail would also connect across the CN Rail corridor to the east.<\/p>\n<p><imgx alt=\"130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-fcbf4a21-9782-4eac-a6c4-d2b02413fa2b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180120.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180120.jpg', true, ''); return false;\" title=\"An aerial view looking northeast 130 Mountainview Road North, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">An aerial view looking northeast 130 Mountainview Road North, designed by Arcadis for Gilbach<\/span><\/p>\n<p>The surrounding area is seeing increased development activity, with this proposal calling for the greatest heights and density. West of the station, proposals include <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/mill-street-commons-georgetown.49928\" target=\"_blank\">Mill Street Commons<\/a> at four storeys and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/12-24-dayfoot-drive-georgetown.49962\" target=\"_blank\">12-24 Dayfoot Drive<\/a> at six storeys, while the 6-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/mill-landing.49922\" target=\"_blank\">The Mill Landing<\/a> and 10-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/mcgibbon-main.20340\" target=\"_blank\">McGibbon on Main<\/a> are both currently under construction. East of the station, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/furnace-room-brewery-towns.49959\" target=\"_blank\">Furnace Room Brewery Towns<\/a> calls for townhouses up to 3 storeys while <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1-rosetta-condos.49935\" target=\"_blank\">1 Rosetta Condos<\/a> is planned to rise 12 storeys.<\/p>\n<p><imgx alt=\"130 Mountainview Road North, Halton Hills, designed by Arcadis for Gilbach\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-e2a7c19c-d8ff-4f11-be7e-04de32a8452f\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180121.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/02\/57992\/57992-180121.jpg', true, ''); return false;\" title=\"An aerial view looking southwest 130 Mountainview Road North, designed by Arcadis for Gilbach\"\/><span class=\"image-description\">An aerial view looking southwest 130 Mountainview Road North, designed by Arcadis for Gilbach<\/span><\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arcadis.8006\" target=\"_blank\">Arcadis<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mhbc-planning.24647\" target=\"_blank\">MHBC Planning<\/a><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/02\/six-tower-development-proposed-near-georgetown-go.57992\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A proposal at\u00a0130 Mountainview Road North beside Georgetown GO station would bring the largest development yet to the Town &#8230; <a title=\"Six-Tower Development Proposed Near Georgetown GO\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/six-tower-development-proposed-near-georgetown-go\/\" aria-label=\"Read more about Six-Tower Development Proposed Near Georgetown GO\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-29133","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29133"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29133\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}