{"id":29217,"date":"2025-02-25T01:58:09","date_gmt":"2025-02-25T09:58:09","guid":{"rendered":"https:\/\/essential.construction\/news\/gateway-2-approval-delay-pushes-back-bristol-student-scheme\/"},"modified":"2025-02-25T01:58:09","modified_gmt":"2025-02-25T09:58:09","slug":"gateway-2-approval-delay-pushes-back-bristol-student-scheme","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/gateway-2-approval-delay-pushes-back-bristol-student-scheme\/","title":{"rendered":"Gateway 2 approval delay pushes back Bristol student scheme"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The 500-bed Freestone Island development scheme in the Temple Meads area of Bristol was originally timetabled to open by September next year, but delays in gaining key Gateway 2 approval to start construction have now pushed the project back by around a year.<\/p>\n<p><span class=\"bmq\">Joe Lister, Unite c<\/span><span class=\"bnt\">hief executive, said this morning that n<\/span>ew supply of purpose built student accommodation had been hit by a perfect storm of planning delays, cost inflation and now fire safety regulator delay.<\/p>\n<p>\u201cNew supply of PBSA is also down 60% on pre-pandemic levels, reflecting viability challenges created by higher costs of construction and funding as well as planning backlogs and time required to secure Building Safety Act approvals.<\/p>\n<p class=\"bqz\"><span class=\"bnt\">\u201c<\/span><span class=\"bmz\">Planning timescales remain protracted due to limited planning resource for local authorities, resulting in longer delivery programmes which challenge viability. <\/span><\/p>\n<p class=\"bqz\"><span class=\"bmz\">\u201cWe expect the combination of complex planning, increasing regulation, and higher build and funding costs to restrict the delivery of new supply for several years,\u201d he warned.<\/span><\/p>\n<p>He added that even once the initial backlogs were cleared for fire safety regulator gateway approvals programmes would be extended by the Building Safety Act.<\/p>\n<p>\u201cWe expect these gateways will add around six months to PBSA development programmes once embedded, putting pressure on returns and further slowing new supply. Our appraisals and delivery targets reflect the expected impact of the Act.\u201d<\/p>\n<p>Lister said that viability challenges meant that weekly rents now need to be at least \u00a3200 for new PBSA development outside of London, meaning there was presently little prospect of new supply in many markets.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/02\/25\/gateway-2-approval-delay-pushes-back-bristol-student-scheme\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The 500-bed Freestone Island development scheme in the Temple Meads area of Bristol was originally timetabled to open by &#8230; <a title=\"Gateway 2 approval delay pushes back Bristol student scheme\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/gateway-2-approval-delay-pushes-back-bristol-student-scheme\/\" aria-label=\"Read more about Gateway 2 approval delay pushes back Bristol student scheme\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29217","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29217"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29217\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}