{"id":29282,"date":"2025-03-02T02:10:13","date_gmt":"2025-03-02T10:10:13","guid":{"rendered":"https:\/\/essential.construction\/news\/network-rail-fined-3-41m-after-surbiton-track-worker-death\/"},"modified":"2025-03-02T02:10:13","modified_gmt":"2025-03-02T10:10:13","slug":"network-rail-fined-3-41m-after-surbiton-track-worker-death","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/network-rail-fined-3-41m-after-surbiton-track-worker-death\/","title":{"rendered":"Network Rail fined \u00a33.41m after Surbiton track worker death"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The firm pleaded guilty to a safety offence following an investigation and prosecution by industry regulator the Office of Rail and Road.<\/p>\n<p>It is the second heavy fine in as many weeks following a \u00a33.75m penalty imposed following the death of two trackworkers at Margam, Wales.<\/p>\n<p>In the latest fatality, 30-year-old track worker Tyler Byrne was struck by a passenger train near to Surbiton station.<\/p>\n<p>Byrne was a member of a four-person group of track workers, undertaking inspections at the location while trains were running in both directions.<\/p>\n<p>There was no protection and an inadequate warning system in place, which exposed all members of the working party to the risk of being struck by a train in the course of their work.<\/p>\n<p>ORR\u2019s investigation identified failings with the planning, monitoring and supervision to ensure the workers were adequately protected while carrying out their maintenance activities on the track.<\/p>\n<p>The regulator had previously served Network Rail two Improvement Notices in July 2019, requiring it to implement, preventive and protective measures necessary to safeguard workers on or near the line.<\/p>\n<p>One of the notices concerned planning, and the other concerned the use of technology.<\/p>\n<p>While Network Rail had made some improvements to track worker safety arrangements at the time of Byrne\u2019s accident, its implementation across the organisation lacked urgency and pace, said the ORR.<\/p>\n<p>In recent years and subsequent to the incident, there has been a vast reduction in red-zone working, when lines remain live during track work, while new technologies have been introduced to reduce the risk of harm.<\/p>\n<p>Richard Hines, ORR\u2019s HM Chief Inspector of Railways, said:\u202f \u201cOur deepest sympathies are with the family, friends and colleagues of Tyler Byrne.<\/p>\n<p>\u201cAt just 30 years old, Tyler had a bright future ahead of him \u2013 I am sure that he would have gone on to achieve all his hopes and dreams with those who he loved the most. He, however, was sadly denied that opportunity. I am so sorry for the loss of his life.<\/p>\n<p>\u201cIn a period when we also remembered those who lost their lives at Margam in 2019, let us keep our focus on reducing the risks faced by our people.\u201d<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/02\/27\/network-rail-fined-3-41m-after-surbiton-track-worker-death\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The firm pleaded guilty to a safety offence following an investigation and prosecution by industry regulator the Office of &#8230; <a title=\"Network Rail fined \u00a33.41m after Surbiton track worker death\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/network-rail-fined-3-41m-after-surbiton-track-worker-death\/\" aria-label=\"Read more about Network Rail fined \u00a33.41m after Surbiton track worker death\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29282","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29282"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29282\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}