{"id":29320,"date":"2025-03-05T02:18:30","date_gmt":"2025-03-05T10:18:30","guid":{"rendered":"https:\/\/essential.construction\/news\/one-crane-remains-above-cherry-house-at-canary-landing\/"},"modified":"2025-03-05T02:18:30","modified_gmt":"2025-03-05T10:18:30","slug":"one-crane-remains-above-cherry-house-at-canary-landing","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/one-crane-remains-above-cherry-house-at-canary-landing\/","title":{"rendered":"One Crane Remains Above Cherry House at Canary Landing"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cherry-house-canary-landing.39101\" target=\"_blank\">Cherry House at Canary Landing<\/a>&#8216;s buildings have topped off at Mill and Cherry streets in Toronto\u2019s Distillery District, with only one last crane still standing over the complex&#8217;s east building. Developed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/dream-unlimited.7880\" target=\"_blank\">Dream Unlimited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kilmer-group.8677\" target=\"_blank\">Kilmer Group<\/a>, and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tricon-residential.8368\" target=\"_blank\">Tricon Residential<\/a>, the project consists of three buildings, one of 12 storeys and two of 13 designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/cobe-architects.19180\" target=\"_blank\">COBE Architects<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/architectsalliance.7955\" target=\"_blank\">architects\u2014Alliance<\/a>. The site, spanning over 15,000m\u00b2, replaces one of the last large surface parking lots in the area and is one of several parts of the larger Canary Landing community, some other currently projects of which also includes <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/maple-house-canary-landing.34836\" target=\"_blank\">Maple House<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/birch-house-indigenous-hub.39147\" target=\"_blank\">Birch House, and the Indigenous Hub<\/a>. Construction on Cherry House began in 2021.<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-f7d9e938-2242-4847-9b06-f15c302b0fe3\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180650.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180650.jpeg', true, ''); return false;\" title=\"Looking southeast to Cherry House at Canary Landing, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \"\/><span class=\"image-description\">Looking southeast to Cherry House at Canary Landing, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential <\/span><\/p>\n<p>Looking northwest from Cherry and Mill streets, this image from May, 2024 captures brick-patterned precast that had been installed up to the 9th floor for the south building. Above the masonry, the 10th floor steps back and is then cantilevered over by three more concrete slabs for the uppermost levels including the mechanical penthouse. Windows have been installed as high as the 8th floor, while at grade, the curtain wall glazing wraps around the double-height retail podium. To the right of the windows, bronze-toned metal panels are partially installed.<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-70b7af81-de7a-4878-98d1-4193c5d28390\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180644.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180644.jpeg', true, ''); return false;\" title=\"Cladding progress on the tower at Cherry and Mill streets, image by UrbanToronto Forum contributor rdaner\"\/><span class=\"image-description\">Cladding progress on the tower at Cherry and Mill streets, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p>An aerial view facing south in July, 2024, highlights the blue tower crane at the east end of the site. Construction hoists are visible along the north elevation, rising only six floors at that time, while the east building then reached twelve floors. On the south tower to the left, cladding has begun on the mechanical penthouse. Along Cherry Street and Front Street East, the precast brick-patterned cladding has been installed up to the fourth floor.<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-931da45e-bdc0-425a-85fc-2c56e2ecdcff\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180645.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180645.jpeg', true, ''); return false;\" title=\"An aerial view looking south, image by UrbanToronto Forum contributor skycandy\"\/><span class=\"image-description\">An aerial view looking south, image by UrbanToronto Forum contributor skycandy<\/span><\/p>\n<p>Looking at the project in October, 2024, a pedestrian mews between the east and west buildings affords a partial look into the courtyard within the Front Street, Cherry Street, and Trinity Street block that the east and west buildings share. Brick-patterned framing anchors the lower levels, while above, powder-coated aluminum panels with varying corrugations have been installed most of the way up the buildings. On either side of the opening, cantilevers extend over the mews, emphasizing the stepped massing of the buildings.<\/p>\n<p><imgx alt=\"Looking into the courtyard between east and west buildings at Cherry House, Toronto\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-35751756-849a-4623-9538-eb2e222592fe\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180652.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180652.jpg', true, ''); return false;\" title=\"Looking into the courtyard between east and west buildings at Cherry House, image by UrbanToronto Forum contributor xmyth_\"\/><span class=\"image-description\">Looking into the courtyard between east and west buildings at Cherry House, image by UrbanToronto Forum contributor xmyth_<\/span><\/p>\n<p>An aerial view facing northeast in January, 2025 gives us a view of the west elevation\u2019s stepped massing, highest\u00a0along Front Street. The cladding is all but complete, with the corrugated aluminum panels and glazing mostly installed across the buildings. Along Trinity Street, the brick pattern-framed lower floors bring texture to the buildings&#8217; street presence. Hidden to the right, the south elevation lines a newly created, as yet unnamed road.\u00a0<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-96d63e8f-8553-4a82-9fc5-871c9339df1c\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180647.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180647.jpeg', true, ''); return false;\" title=\"An aerial view looking northeast to the Trinity Street frontage, image by UrbanToronto Forum contributor xmyth_ 2\"\/><span class=\"image-description\">An aerial view looking northeast to the Trinity Street frontage, image by UrbanToronto Forum contributor xmyth_ 2<\/span><\/p>\n<p>Recently captured from a nearby tower, the topped-off south building&#8217;s upper box is now fully clad. To the right, cladding has progressed up to the eighth floor on the adjacent buildings, showcasing the stepped massing as its heights gradually increases toward the 13-storey corner at Cherry and Front streets. Below, some lower floors remain partially enclosed with orange tarp, while the brick-patterned framing hugs the ground on completed sections.<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-3d905f9e-3e11-4143-b0f0-6c91a9b6e60b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180648.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180648.jpeg', true, ''); return false;\" title=\"An aerial view looking northwest to the towers along Cherry Street, image by UrbanToronto Forum contributor rdaner\"\/><span class=\"image-description\">An aerial view looking northwest to the towers along Cherry Street, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p>Finally, looking northeast this month, the west-end tower crane was captured in the process of being dismantled. A mobile crane is seen ready to lower to the ground the top sections of the crane above its slewing unit.<\/p>\n<p><imgx alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential \" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cb4bf446-1b6e-4ba4-a25e-1d38b71312de\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180649.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58099\/58099-180649.jpg', true, ''); return false;\" title=\"The north end tower crane being dismantled, image courtesy of UrbanToronto Forum contributor PL1\"\/><span class=\"image-description\">The north end tower crane being dismantled, image courtesy of UrbanToronto Forum contributor PL1<\/span><\/p>\n<p>Once complete, the Cherry House complex will contain 855 units, in buildings standing as high as 50.32m tall.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/03\/one-crane-remains-above-cherry-house-canary-landing.58099\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Cherry House at Canary Landing&#8216;s buildings have topped off at Mill and Cherry streets in Toronto\u2019s Distillery District, with &#8230; <a title=\"One Crane Remains Above Cherry House at Canary Landing\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/one-crane-remains-above-cherry-house-at-canary-landing\/\" aria-label=\"Read more about One Crane Remains Above Cherry House at Canary Landing\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-29320","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29320"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29320\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}