{"id":29352,"date":"2025-03-07T02:23:56","date_gmt":"2025-03-07T10:23:56","guid":{"rendered":"https:\/\/essential.construction\/news\/multi-tower-proposal-on-yonge-in-richmond-hill-goes-taller-bigger\/"},"modified":"2025-03-07T02:23:56","modified_gmt":"2025-03-07T10:23:56","slug":"multi-tower-proposal-on-yonge-in-richmond-hill-goes-taller-bigger","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/multi-tower-proposal-on-yonge-in-richmond-hill-goes-taller-bigger\/","title":{"rendered":"Multi-Tower Proposal on Yonge in Richmond Hill Goes Taller, Bigger"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>A multi-phased development has been proposed for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/11014-11076-yonge-street.51660\" target=\"_blank\">11014 through 11076 Yonge Street<\/a> in Richmond Hill\u2019s Elgin Mills area, seeking permission for a mix of townhouses, two community centres, and high-rise towers up to 49 storeys. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tregebov-cogan-architects.42983\" target=\"_blank\">Tregebov Cogan Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/armour-heights-developments.37144\" target=\"_blank\">Armour Heights Developments<\/a> (operating as Yonge MCD Inc.), the proposal calls for five residential towers close to the Oak Ridges Moraine that forms the highpoint of the Greater Toronto Area.<\/p>\n<p><imgx alt=\"11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-a68e048a-d6bb-4176-ae61-e74658023e7a\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180775.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180775.jpg', true, ''); return false;\" title=\"An aerial view looking southwest to 11014-11076 Yonge Street, designed by Tregebov Cogan Architecture for Armour Heights Developments\"\/><span class=\"image-description\">An aerial view looking southwest to 11014-11076 Yonge Street, designed by Tregebov Cogan Architecture for Armour Heights Developments<\/span><\/p>\n<p>The 46,415m\u00b2 site spans Brookside Road to Naughton Drive and is currently vacant. A tributary of the Rouge River runs through the eastern portion, bordered by a stream corridor and wetland areas, while a wooded area to the north is owned by the Toronto and Region Conservation Authority (TRCA). Surrounding the site is a mix of residential and commercial uses.\u00a0<\/p>\n<p><imgx alt=\"Aerial view, 11014-11076 Yonge Street, Richmond Hill\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-f9356622-3a9a-4cdb-9656-095a90acd302\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180777.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180777.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image from submission to City of Richmond Hill\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Richmond Hill<\/span><\/p>\n<p>In 2016, applications for an Official Plan Amendment, Zoning By-law Amendment, and Draft Plan of Subdivision were submitted. Phase 1, approved by the Ontario Land Tribunal (OLT) in 2020, allowed for a 6-storey mid-rise building, stacked townhouses, and a linear park. In 2021, a decision permitted two residential towers of 21 and 37 storeys in Phase 2, located at the site&#8217;s southeast corner. A 2024 amendment refined the approved subdivision plan, establishing development blocks and an internal public road network.\u00a0<\/p>\n<p><imgx alt=\"Previous design, 11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-355ece67-d12a-497f-b252-301109c8564f\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180773.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180773.jpg', true, ''); return false;\" title=\"Previous plan by Armour Heights Developments\"\/><span class=\"image-description\">Previous plan by Armour Heights Developments<\/span><\/p>\n<p>Now, the latest Official Plan and Zoning By-law Amendment applications envision five residential towers ranging from 29 to 49 storeys, eight 3-storey townhouse blocks, and two community centres. The development would introduce 1,874 residential units, including a mix of condos, market-rate rentals, and townhouses. The design\u2019s Gross Floor Area is 174,675m\u00b2, including 172,561m\u00b2 for residential uses and 2,114m\u00b2 for the community spaces. The design\u2019s Floor Space Index in the 46,415m\u00b2 property is 6.80 times lot coverage, and the layout includes a linear park and new internal roads.<\/p>\n<p><imgx alt=\"Conceptual site plan, 11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-8d84e375-b080-429a-8302-f26ea0725a13\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180776.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180776.jpg', true, ''); return false;\" title=\"Conceptual site plan, designed by Tregebov Cogan Architecture for Armour Heights Developments\"\/><span class=\"image-description\">Conceptual site plan, designed by Tregebov Cogan Architecture for Armour Heights Developments<\/span><\/p>\n<p>Planned in four phases, Phase 1 would introduce 33 three-bedroom townhouses, while Phase 2 would bring two high-rise towers of 38 and 49 storeys, with a combined 794 condo units. Phase 3 would deliver three rental towers of 29, 31, and 33 storeys, along with two storeys of community centre spaces spanning 2,114m\u00b2. Phase 4 would complete the project with 36 stacked townhouses. The towers would sit atop podiums ranging from 1 to 6 storeys.<\/p>\n<p>Indoor amenities would span 5,771m\u00b2, while outdoor amenities would cover 6,446m\u00b2. A linear park along the site&#8217;s eastern edge would connect Yonge Street, Brookside Road, and the internal street network.\u00a0<\/p>\n<p><imgx alt=\"Ground floor plan, Phase 2, 11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cf646511-934a-47db-ae35-acc7aae8bf5b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180779.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180779.jpg', true, ''); return false;\" title=\"Ground floor plan for Phase 2, designed by Tregebov Cogan Architecture for Armour Heights Developments\"\/><span class=\"image-description\">Ground floor plan for Phase 2, designed by Tregebov Cogan Architecture for Armour Heights Developments<\/span><\/p>\n<p>The towers would include 16 elevators across Phases 2 and 3, with seven in the condo towers (approximately one per 113 units) and nine in the rental towers (one per 112 units). Parking is planned above-grade, at-grade, and in three underground levels, with 1,212 spaces for residents and 136 for visitors. Bicycle parking provisions include 1,082 long-term and 212 short-term spaces for visitors.<\/p>\n<p><imgx alt=\"Ground floor plan, Phase 3, 11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-d9bbe327-5978-4c62-921e-73a3bdc5916b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180778.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180778.jpg', true, ''); return false;\" title=\"Ground floor plan for Phase 3, designed by Tregebov Cogan Architecture for Armour Heights Developments\"\/><span class=\"image-description\">Ground floor plan for Phase 3, designed by Tregebov Cogan Architecture for Armour Heights Developments<\/span><\/p>\n<p>York Region Transit (YRT) bus stops at Brookside Road and Canyon Hill Avenue provide connections along Yonge Street. The VIVA Bus Rapid Transit (BRT) system, running between Highway 7 and 19th Avenue\/Gamble Road, includes a station at Yonge and Bernard Avenue, designating the area as a Major Transit Station Area (MTSA). The Bernard Terminal, southeast of the site, offers additional regional bus connections. Looking ahead, the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/yonge-line-1-north-subway-extension.52165\" target=\"_blank\">Yonge Line 1 North Subway Extension<\/a>, planned to extend beyond Highway 7, shorten the connection time to Toronto.\u00a0<\/p>\n<p>The surrounding area is experiencing an uptick in high-rise development. To the north, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/brookside-yonge-condos.54868\" target=\"_blank\">Brookside Yonge Condos<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/11172-yonge-street.51590\" target=\"_blank\">11172 Yonge Street<\/a> are proposed at 22 storeys each. To the south, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/evelyn-condos-rise-rose.51557\" target=\"_blank\">Evelyn Condos at Rise &amp; Rose<\/a> would introduce 23- and 31-storey towers, while further south at Elgin Mills Road West, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/elgin.53606\" target=\"_blank\">The Elgin<\/a> is planned as a 19- and 25-storey tower development. A masterplanned community at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/41-81-elgin-mills.56930\" target=\"_blank\">41 &amp; 81 Elgin Mills<\/a> calls for towers reaching up to 50 storeys.<\/p>\n<p><imgx alt=\"11014-11076 Yonge Street, Richmond Hill, designed by Tregebov Cogan Architecture for Armour Heights Developments\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-10e790f6-d22f-4808-8424-219ff643ba3e\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180774.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/03\/58114\/58114-180774.jpg', true, ''); return false;\" title=\"An aerial view looking northeast to 11014-11076 Yonge Street, designed by Tregebov Cogan Architecture for Armour Heights Developments\"\/><span class=\"image-description\">An aerial view looking northeast to 11014-11076 Yonge Street, designed by Tregebov Cogan Architecture for Armour Heights Developments<\/span><\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/aercoustics-engineering-ltd.44962\" target=\"_blank\">Aercoustics Engineering Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/weston-consulting.27799\" target=\"_blank\">Weston Consulting<\/a><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/03\/multi-tower-proposal-yonge-richmond-hill-goes-taller-bigger.58114\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A multi-phased development has been proposed for 11014 through 11076 Yonge Street in Richmond Hill\u2019s Elgin Mills area, seeking &#8230; <a title=\"Multi-Tower Proposal on Yonge in Richmond Hill Goes Taller, Bigger\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/multi-tower-proposal-on-yonge-in-richmond-hill-goes-taller-bigger\/\" aria-label=\"Read more about Multi-Tower Proposal on Yonge in Richmond Hill Goes Taller, Bigger\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-29352","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29352"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29352\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}