{"id":29503,"date":"2025-03-13T03:34:45","date_gmt":"2025-03-13T10:34:45","guid":{"rendered":"https:\/\/essential.construction\/news\/jrl-malaysian-backers-plan-150m-london-city-office-refurb\/"},"modified":"2025-03-13T03:34:45","modified_gmt":"2025-03-13T10:34:45","slug":"jrl-malaysian-backers-plan-150m-london-city-office-refurb","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/jrl-malaysian-backers-plan-150m-london-city-office-refurb\/","title":{"rendered":"JRL Malaysian backers plan \u00a3150m London city office refurb"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The firm, which also confirmed it was close to finalising its \u00a350m purchase of a 50% stake in contractor JRL Group, said the refurbishment work would commence immediately, with completion expected within 36 months.<\/p>\n<p>IJM bought the historic building lease with planning permission for the overhaul that Ardmore Construction Group is understood to be on board to deliver.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-03-13-at-07.03.40.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-495810\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-03-13-at-07.03.40.png\" alt=\"-\" width=\"1060\" height=\"540\"><\/a><\/p>\n<p>Recognised as one of the most significant interventions into a Grade II listed building ever approved by the City of London, the planned building upgrade introduces a sustainability-focused refurbishment and a two-floor extension.<\/p>\n<p>This will increase the building\u2019s total footprint by 26%, from 300,000 sq ft to 378,000 sq ft of gross internal area.<\/p>\n<p>Led by architect Carmody Groarke, the redevelopment targets industry-leading ESG certifications including BREEAM \u2018Outstanding\u2019, WELL \u2018Platinum\u2019, EPC \u2018A\u2019, NABERS 4 Star, and WiredScore \u2018Platinum\u2019, alongside achieving net-zero carbon in operation.<\/p>\n<p>Dato\u2019 Lee Chun Fai, IJM\u2019s Group CEO, said: \u201cThe acquisition and redevelopment of Finsbury Circus strengthens IJM\u2019s presence in the UK, reflecting our confidence in its long-term property sector as London\u2019s financial district continues to evolve as a global hub for finance, commerce, and technology.<\/p>\n<p>\u201cThis investment presents a rare opportunity to revitalise a historic landmark while delivering a modern, high-performance workspace tailored to the needs of global businesses.\u201d<\/p>\n<p>He added: \u201cAlongside our JRL investment and growing UK portfolio\u2014including Royal Mint Gardens, our Innova-Network Rail partnership, and The Wheat Quarter\u2014this investment bolsters our footprint in the UK\u2019s dynamic real estate market while supporting our long-term growth ambitions.\u201d<\/p>\n<div class=\"break-out-box\">\n<h3>Historic building green upgrade plan<\/h3>\n<hr>\n<p>A new underfloor air distribution system will improve energy efficiency, while heat pumps, energy-efficient lifts, and LED lighting will halve operational emissions compared to pre-refurbishment levels.<\/p>\n<div id=\"attachment_495820\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-03-13-at-08.20.39.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-495820 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-03-13-at-08.20.39.png\" alt=\"-\" width=\"1352\" height=\"816\"><\/a><\/p>\n<p class=\"wp-caption-text\">Reworked building with 2-floor roof extension<\/p>\n<\/div>\n<p>The redevelopment also integrates 955 sq m of modular green walls and 675 sqm of Sustainable Urban Drainage System (SuDS) blue roof space, enhancing biodiversity, stormwater management and climate resilience.<\/p>\n<p>Rainwater harvesting for toilet flushing and sourcing electricity through a green tariff further reinforces the project\u2019s sustainability commitments.<\/p>\n<p>Additionally, off-site modular construction will minimise waste and support future deconstruction under a circular economy framework.<\/p>\n<p>Existing structural columns are being strengthened rather than replaced, and a lightweight structural solution for the extension eliminates the need for foundation reinforcement, lowering environmental impact.<\/p>\n<\/div><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/03\/13\/jrl-malaysian-backers-plan-150m-london-city-office-refurb\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The firm, which also confirmed it was close to finalising its \u00a350m purchase of a 50% stake in contractor &#8230; <a title=\"JRL Malaysian backers plan \u00a3150m London city office refurb\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/jrl-malaysian-backers-plan-150m-london-city-office-refurb\/\" aria-label=\"Read more about JRL Malaysian backers plan \u00a3150m London city office refurb\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29503","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29503","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29503"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29503\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}