{"id":29614,"date":"2025-03-21T03:54:36","date_gmt":"2025-03-21T10:54:36","guid":{"rendered":"https:\/\/essential.construction\/news\/green-light-for-london-euston-tower-rebuild\/"},"modified":"2025-03-21T03:54:36","modified_gmt":"2025-03-21T10:54:36","slug":"green-light-for-london-euston-tower-rebuild","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/green-light-for-london-euston-tower-rebuild\/","title":{"rendered":"Green light for London Euston Tower rebuild"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-496113\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The developer aims to retain and re-use the existing 1960s building core and foundations at its Regent\u2019s Place site, while adding new low carbon structures to create a new-look 31-storey building with bigger floor-plates.<\/p>\n<p>Lendlease was involved in pre-construction planning work on the new tower, including designing the outline demolition and construction approach, although the appointment of a main contractor is yet to be announced.<\/p>\n<p>David Lockyer, Head of Development at British Land, said: \u201cWe are delighted to receive planning consent for this incredible scheme \u2013 the first West End tower in a generation, and likely to be the last.<\/p>\n<p>\u201cThe tower is ideally located at our Regent\u2019s Place campus, where the Knowledge Quarter meets the West End, and where businesses can benefit from the great concentration of academic and research institutions between Harley Street and King\u2019s Cross.\u201d<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Euston-tower-updated-cgi.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-496114\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Euston-tower-updated-cgi.png\" alt=\"-\" width=\"2077\" height=\"2465\"><\/a><\/p>\n<p>The development will be all-electric and target BREEAM Outstanding.<\/p>\n<p>Leading the design team is Danish architect 3XN GXN supported by London-based architects Adamson Associates and with landscape design by studio DSDHA.<\/p>\n<p>The professional team includes Arup as both structural and building services consultant, with Gardiner &amp; Theobald acting as project manager and cost consultant on the project<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/03\/21\/green-light-for-london-euston-tower-rebuild\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The developer aims to retain and re-use the existing 1960s building core and foundations at its Regent\u2019s Place site, &#8230; <a title=\"Green light for London Euston Tower rebuild\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/green-light-for-london-euston-tower-rebuild\/\" aria-label=\"Read more about Green light for London Euston Tower rebuild\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29614","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29614"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29614\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}