{"id":29683,"date":"2025-03-26T04:05:14","date_gmt":"2025-03-26T11:05:14","guid":{"rendered":"https:\/\/essential.construction\/news\/mclaren-confirms-subcontractor-team-on-135m-warehouse-job\/"},"modified":"2025-03-26T04:05:14","modified_gmt":"2025-03-26T11:05:14","slug":"mclaren-confirms-subcontractor-team-on-135m-warehouse-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/mclaren-confirms-subcontractor-team-on-135m-warehouse-job\/","title":{"rendered":"McLaren confirms subcontractor team on \u00a3135m warehouse job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-496248\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Work got underway earlier this month at the site which will deliver 505,000 sq ft of warehousing accommodation with ancillary office space on a 33-acre site.<\/p>\n<p>Six flexible buildings can be configured as up to nine units, ranging from 23,000 to 175,000 sq ft.<\/p>\n<p>McLaren Construction\u2019s managing director for industrial and logistics, David Gavin, said: \u201cThis will be a stunning setting for an industrial park, with a generous planting scheme that blends sympathetically with the surrounding area.<\/p>\n<p>\u201cCreating the on-site part of that landscape is one of the most complex parts of the project. It\u2019s more important than ever to draw on our environmental management experts to minimise the impact of construction.\u201d<\/p>\n<p>The first buildings are due to be ready for occupation in 2026.<\/p>\n<p>\u00a0<\/p>\n<div class=\"break-out-box\">\n<p><strong> McLaren\u2019s subcontractor team includes:<\/strong><\/p>\n<p>\u00a0<\/p>\n<ul>\n<li>Steelwork: B&amp;K Structures<\/li>\n<li>Wall and roof cladding: CA Group<\/li>\n<li>Whitewall: Cold Clad<\/li>\n<li>Pre-cast warehouses: Modular Cubed<\/li>\n<li>CMC piling: Keller<\/li>\n<li>Curtain walling\/glazing: Ridgeway Facades<\/li>\n<li>Photovoltaics: Watt Energy<\/li>\n<li>Passenger lifts: Kone<\/li>\n<li>Siphonic drainage: Sapaflow<\/li>\n<li>M&amp;E: UME<\/li>\n<li>Dock levellers and doors: Promstahl<\/li>\n<\/ul>\n<\/div><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/03\/26\/mclaren-confirms-subcontractor-team-on-135m-warehouse-job\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Work got underway earlier this month at the site which will deliver 505,000 sq ft of warehousing accommodation with &#8230; <a title=\"McLaren confirms subcontractor team on \u00a3135m warehouse job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/mclaren-confirms-subcontractor-team-on-135m-warehouse-job\/\" aria-label=\"Read more about McLaren confirms subcontractor team on \u00a3135m warehouse job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-29683","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29683"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29683\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}