{"id":29945,"date":"2025-04-11T15:31:31","date_gmt":"2025-04-11T22:31:31","guid":{"rendered":"https:\/\/essential.construction\/news\/mccarthy-starts-326m-phoenix-airport-job\/"},"modified":"2025-04-11T15:31:31","modified_gmt":"2025-04-11T22:31:31","slug":"mccarthy-starts-326m-phoenix-airport-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/mccarthy-starts-326m-phoenix-airport-job\/","title":{"rendered":"McCarthy starts $326M Phoenix airport job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><\/p>\n<p>            <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/images\/audio_icon.svg?482016190122\" alt=\"-\"><\/p>\n<p>        Listen to the article<br \/>\n        <span class=\"text-to-speech__button__audio-length\">1 min<\/span><br \/>\n    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"https:\/\/res.cloudinary.com\/dmgi9movl\/video\/upload\/q_1\/v1744376847\/news\/text_to_speech\/mccarthy-starts-326m-phoenix-airport-job_zhd502.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<p><span><span><span><span><span><span>St. Louis-based McCarthy Building Cos. recently began construction of the <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.mccarthy.com\/insights\/construction-begins-on-terminal-3-north-2-concourse-at-phoenix-sky-harbor-international\" target=\"_blank\"><span><span><span><span><span><span><span><span>$326 million concourse in Terminal 3<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> at Phoenix Sky Harbor International Airport in Arizona, the construction firm announced on April 7.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The new concourse will add approximately 173,000 square feet of space and six new passenger gates, according to the news release, to bring the total to 26 gates. The terminal handles approximately 25% of the airport\u2019s passenger traffic annually.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The multi-level design includes a passenger level with gate hold rooms, public restrooms and spaces for future retail or tenant build-outs, per the release. An upper mezzanine level will provide a lounge, back-of-house areas and an exterior terrace, while the apron level will contain aircraft service and essential support spaces.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The new elevated connector bridge will link the North 2 Concourse to the existing Terminal 3 processor, and the design also includes provisions for a future tunnel connection to Terminal 4\u2019s North Concourse, according to McCarthy.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Crews are expected to begin demolishing the Annex Building and enabling work this month, per the release.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/mccarthy-phoenix-airport-terminal-3-construction\/745111\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 1 min This audio is auto-generated. Please let us know if you have feedback. St. &#8230; <a title=\"McCarthy starts $326M Phoenix airport job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/mccarthy-starts-326m-phoenix-airport-job\/\" aria-label=\"Read more about McCarthy starts $326M Phoenix airport job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-29945","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29945"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29945\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}