{"id":29977,"date":"2025-04-13T16:58:29","date_gmt":"2025-04-13T23:58:29","guid":{"rendered":"https:\/\/essential.construction\/news\/massive-mixed-use-redevelopment-proposed-at-burlington-centre\/"},"modified":"2025-04-13T16:58:29","modified_gmt":"2025-04-13T23:58:29","slug":"massive-mixed-use-redevelopment-proposed-at-burlington-centre","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/massive-mixed-use-redevelopment-proposed-at-burlington-centre\/","title":{"rendered":"Massive Mixed-Use Redevelopment Proposed at Burlington Centre"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p dir=\"ltr\">The east end of the Burlington Centre mall could soon be transformed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/burlington-centre-redevelopment.58361\" target=\"_blank\">a high-rise redevelopment<\/a> that would bring 11 towers rising as high as 37 storeys. In a pre-application proposal prepared by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/turner-fleischer-architects.8071\" target=\"_blank\">Turner Fleischer Architects<\/a> for\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/riocan-reit.7806\" target=\"_blank\">RioCan REIT<\/a>, plans call for eight mixed-use, predominantly residential buildings, redeveloping a portion of the mall and matching Burlington\u2019s tallest proposals to date. The site lies about 1.8km east of Burlington GO station, with has direct train and bus connections to Toronto and Hamilton.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182729.jpg\" data-entity-uuid=\"insert-display_default-dfe273fc-536d-4727-ac7b-e4ed7c94a115\" data-entity-type=\"file\" alt=\"Burlington Centre Redevelopment, designed by Turner Fleischer Architects for RioCan REIT\" title=\"Looking northeast to the Burlington Centre Redevelopment, designed by Turner Fleischer Architects for RioCan REIT\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182729.jpg', true, 'Looking northeast to the Burlington Centre Redevelopment, designed by Turner Fleischer Architects for RioCan REIT'); return false;\"><span class=\"image-description\">Looking northeast to the Burlington Centre Redevelopment, designed by Turner Fleischer Architects for RioCan REIT<\/span><\/p>\n<p dir=\"ltr\">The site occupies a 40,645m\u00b2 parcel within the Burlington Centre complex at 777 Guelph Line, positioned between Fairview Street to the north and Prospect Street to the south. The mall&#8217;s east end includes a recently closed Hudson\u2019s Bay store and an Active Green + Ross, along with a large surface parking lot, while immediately east of the area proposed for redevelopment is a Canadian Tire store and its related surface parking area.<\/p>\n<p dir=\"ltr\">The broader mall remains anchored by tenants such as Winners, Old Navy, and HomeSense. This proposal follows years of speculation about the future of the site, which gained momentum after Hudson\u2019s Bay announced its closure in mid-2023 and then officially shut its doors in February, 2025.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182731.jpg\" data-entity-uuid=\"insert-display_default-edfcd408-7587-489b-ab4b-bbcd4ae7f859\" data-entity-type=\"file\" alt=\"Burlington Centre, Google Maps\" title=\"Looking northwest to the current site, image retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182731.jpg', true, 'Looking northwest to the current site, image retrieved from Google Maps'); return false;\"><span class=\"image-description\">Looking northwest to the current site, image retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\">A formal planning submission has yet to be made to the City of Burlington. Plans call for a high-density mixed-use redevelopment consisting of eight buildings containing 11 residential towers, with heights ranging from 23 to 37 storeys. Together, the buildings would introduce 3,476 residential units.\u00a0<\/p>\n<p dir=\"ltr\">Of the total Gross Floor Area of 249,558m\u00b2, there would be 242,279m\u00b2 dedicated to residential use and 7,279m\u00b2 to retail, for a Floor Space Index of 6.14. Retail uses are planned at grade across all buildings, contributing to a continuous pedestrian realm. A new 4,237m\u00b2 public park is planned for approximately where the former Hudson\u2019s Bay store was, creating a central green space leading to a newly truncated east end of the mall. Two new public streets are proposed: a north-south connection linking Fairview and Prospect streets and an east-west link extending into the adjacent Canadian Tire parking lot.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182730.jpg\" data-entity-uuid=\"insert-display_default-44cf3610-f8db-42c1-8a91-5ae90c0458ff\" data-entity-type=\"file\" alt=\"Conceptual site plan, Burlington Centre Redevelopment, designed by Turner Fleischer Architects for RioCan REIT\" title=\"Conceptual site plan, designed by Turner Fleischer Architects for RioCan REIT\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182730.jpg', true, 'Conceptual site plan, designed by Turner Fleischer Architects for RioCan REIT'); return false;\"><span class=\"image-description\">Conceptual site plan, designed by Turner Fleischer Architects for RioCan REIT<\/span><\/p>\n<p dir=\"ltr\">Situated in the Dynes neighbourhood, the area surrounding the site is characterized by a mix of commercial and residential uses. Multiple Burlington Transit bus routes serve the area, with stops approximately a four-minute walk from the site. Although not within a Major Transit Station Area, Burlington GO station, located about 1.8km to the west, is accessible via an eight-minute bus ride and offers connections along the Lakeshore West line.\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/metrolinx.7767\" target=\"_blank\">Metrolinx<\/a>&#8216;s Lakeshore West GO Expansion plans aim to provide 15-minute service or better throughout the day between Toronto and Burlington.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182732.jpg\" data-entity-uuid=\"insert-display_default-99e956fb-adc1-41a5-b4c3-17e271f4f3bd\" data-entity-type=\"file\" alt=\"Aerial view, Burlington Centre, Google Maps\" title=\"An aerial view of the site and surrounding area, image retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/04\/58370\/58370-182732.jpg', true, 'An aerial view of the site and surrounding area, image retrieved from Google Maps'); return false;\"><span class=\"image-description\">An aerial view of the site and surrounding area, image retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\">Development activity surrounding the site reflects a mix of mid- and high-rise intensification. Low-rise proposals are found north and south of the site. Further south,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/residences-cumberland.52606\" target=\"_blank\">The Residences on Cumberland<\/a> is proposed at 7 storeys. Higher-density projects cluster near the GO station to the west, including a proposal for 11 storeys at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/2362-fairview-street.54922\" target=\"_blank\">2362 Fairview Street<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/paradigm-condominiums-burlington.17430\" target=\"_blank\">Paradigm Condominiums<\/a>, where the fourth and fifth towers are now under construction at 18 storeys each. At\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/brant-and-ghent.49306\" target=\"_blank\">Brant and Ghent<\/a>, four towers are proposed, ranging from 8 to 25 storeys, while\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/795-brant-street.49208\" target=\"_blank\">795 Brant Street<\/a> is planned at 33 storeys, and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/holland-park-garden.43322\" target=\"_blank\">Holland Park Garden<\/a> would bring seven towers rising from 29 to 37 storeys.<\/p>\n<p dir=\"ltr\">A pre-application community meeting is scheduled for Tuesday, April 22, from 7:30 to 9:00 PM, via Zoom and at Makwendam Public School, located at 565 Woodview Road.<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p dir=\"ltr\">UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/04\/massive-mixed-use-redevelopment-proposed-burlington-centre.58370\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The east end of the Burlington Centre mall could soon be transformed by\u00a0a high-rise redevelopment that would bring 11 &#8230; <a title=\"Massive Mixed-Use Redevelopment Proposed at Burlington Centre\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/massive-mixed-use-redevelopment-proposed-at-burlington-centre\/\" aria-label=\"Read more about Massive Mixed-Use Redevelopment Proposed at Burlington Centre\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-29977","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=29977"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/29977\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=29977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=29977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=29977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}