{"id":30135,"date":"2025-04-24T17:15:21","date_gmt":"2025-04-25T00:15:21","guid":{"rendered":"https:\/\/essential.construction\/news\/final-phase-of-1-5bn-elephant-and-castle-revamp-hits-planning\/"},"modified":"2025-04-24T17:15:21","modified_gmt":"2025-04-25T00:15:21","slug":"final-phase-of-1-5bn-elephant-and-castle-revamp-hits-planning","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/final-phase-of-1-5bn-elephant-and-castle-revamp-hits-planning\/","title":{"rendered":"Final phase of \u00a31.5bn Elephant and Castle revamp hits planning"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-497144\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"206\" data-end=\"387\">Dubbed the West Site, the third and final phase cluster of high rises will replace the old London College of Communication student buildings, which are making way for a new University of the Arts London campus being built across the road.<\/p>\n<p class=\"\" data-start=\"389\" data-end=\"609\">The revised proposals include 507 rental homes with 165 set aside as affordable, alongside the introduction of 452 student beds to meet growing demand and a new public square.<\/p>\n<p class=\"\" data-start=\"611\" data-end=\"854\">Rick de Blaby, chief executive at Get Living, said: \u201cWe are pleased to submit our planning application for the final phase that better reflects local need while significantly enhancing the sustainability credentials.\u201d<\/p>\n<p class=\"\" data-start=\"856\" data-end=\"1123\">The updated plans follow community feedback and ditch some retail space in favour of more homes. They also bring architectural tweaks designed to better fit the area\u2019s character and now a repurposed chunk of the existing college building will become a new cultural venue.<\/p>\n<p class=\"\" data-start=\"1125\" data-end=\"1315\">De Blaby said the West Site was set to come forward in early 2028 after LCC completes its move.<\/p>\n<p class=\"\" data-start=\"1399\" data-end=\"1523\">Get Living\u2019s first phase, Elephant Central, opened in 2017 with 374 homes, 278 student rooms and a raft of commercial space.<\/p>\n<p class=\"\" data-start=\"1525\" data-end=\"1680\">The second phase, known as The Elephant, is due to open in 2026 with 485 homes and the new university building alongside shops, and restaurants.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/04\/24\/final-phase-of-1-5bn-elephant-and-castle-revamp-hits-planning\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Dubbed the West Site, the third and final phase cluster of high rises will replace the old London College &#8230; <a title=\"Final phase of \u00a31.5bn Elephant and Castle revamp hits planning\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/final-phase-of-1-5bn-elephant-and-castle-revamp-hits-planning\/\" aria-label=\"Read more about Final phase of \u00a31.5bn Elephant and Castle revamp hits planning\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30135","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30135"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30135\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}