{"id":30151,"date":"2025-04-25T17:18:17","date_gmt":"2025-04-26T00:18:17","guid":{"rendered":"https:\/\/essential.construction\/news\/ealing-backs-final-phase-of-1-3bn-estate-rebuild\/"},"modified":"2025-04-25T17:18:17","modified_gmt":"2025-04-26T00:18:17","slug":"ealing-backs-final-phase-of-1-3bn-estate-rebuild","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/ealing-backs-final-phase-of-1-3bn-estate-rebuild\/","title":{"rendered":"Ealing backs final phase of \u00a31.3bn estate rebuild"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-497161\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"269\" data-end=\"490\">Developer Mount Anvil and housing association Peabody are behind the 1,345-home regeneration, which will now move into its last stage with another 693 homes set to be built.<\/p>\n<p class=\"\" data-start=\"492\" data-end=\"781\">The full scheme replaces the old Friary Park estate with a mix of private and affordable flats, improved public space and a raft of community facilities.<\/p>\n<p class=\"\" data-start=\"492\" data-end=\"781\">Around 470 of the new homes will be affordable, and all existing tenants have been offered the chance to move into a new place on site.<\/p>\n<p class=\"\" data-start=\"783\" data-end=\"971\">The third and final phase was designed by HTA Design and will help meet nearly a third of Ealing\u2019s annual housing target..<\/p>\n<p class=\"\" data-start=\"2467\" data-end=\"2695\">Friary Park is one of several major projects in the pipeline for the Mount Anvil\/Peabody JV \u2013 including the 266-home rebuild of Watermeadow Court, 307 homes at One Clapham, and the 327-home Three Waters scheme in Bromley-by-Bow.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/04\/25\/ealing-backs-final-phase-of-1-3bn-estate-rebuild\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Developer Mount Anvil and housing association Peabody are behind the 1,345-home regeneration, which will now move into its last &#8230; <a title=\"Ealing backs final phase of \u00a31.3bn estate rebuild\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/ealing-backs-final-phase-of-1-3bn-estate-rebuild\/\" aria-label=\"Read more about Ealing backs final phase of \u00a31.3bn estate rebuild\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30151","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30151"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30151\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}