{"id":30196,"date":"2025-04-29T05:24:54","date_gmt":"2025-04-29T12:24:54","guid":{"rendered":"https:\/\/essential.construction\/news\/green-light-for-150m-west-end-office-revamp\/"},"modified":"2025-04-29T05:24:54","modified_gmt":"2025-04-29T12:24:54","slug":"green-light-for-150m-west-end-office-revamp","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/green-light-for-150m-west-end-office-revamp\/","title":{"rendered":"Green light for \u00a3150m West End office revamp"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-497242\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"315\" data-end=\"562\">Camden Council\u2019s planning committee unanimously approved the office-led scheme, which will see a 1980s block transformed into 250,000 sq ft of workspace with a new-look entrance on Charing Cross Road and rooftop terraces.<\/p>\n<p class=\"\" data-start=\"564\" data-end=\"756\">The project, known as EDGE Shaftesbury, will retain around 75% of the existing structure to cut embodied carbon and is targeting BREEAM Excellent as part of Edge\u2019s push for sustainable design.<\/p>\n<p data-start=\"564\" data-end=\"756\">The project will increase the building\u2019s height from 11 to 13 floors.<\/p>\n<div id=\"attachment_497243\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-29-at-08.23.56.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-497243 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-29-at-08.23.56.png\" alt=\"-\" width=\"1714\" height=\"1236\"><\/a><\/p>\n<p class=\"wp-caption-text\">A new pedestrian route, Caxton Walk, will be created to link New Compton Street with Old Compton Street<\/p>\n<\/div>\n<p data-start=\"1272\" data-end=\"1498\">The project professional team includes architect DSDHA working with M&amp;E engineer SWECO and structural consultant AKT II. Gardiner &amp; Theobald is the cost consultant.<\/p>\n<div id=\"attachment_497253\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-29-at-09.31.23.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-497253 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-29-at-09.31.23.png\" alt=\"-\" width=\"1944\" height=\"1352\"><\/a><\/p>\n<p class=\"wp-caption-text\">New terraced upper levels<\/p>\n<\/div>\n<p class=\"\" data-start=\"1272\" data-end=\"1498\">Shinichi Kagitomi, chief executive of Mitsubishi Estate London, added: \u201cIt is well established that the west end office market is currently chronically under-supplied. This approval will be welcomed by the occupier community.\u201d<\/p>\n<p class=\"\" data-start=\"1500\" data-end=\"1641\">The building, which sits just south of Tottenham Court Road station, has been home to the likes of BT, Yahoo, Meta and WeWork over the years.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/04\/29\/green-light-for-250m-west-end-office-revamp\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Camden Council\u2019s planning committee unanimously approved the office-led scheme, which will see a 1980s block transformed into 250,000 sq &#8230; <a title=\"Green light for \u00a3150m West End office revamp\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/green-light-for-150m-west-end-office-revamp\/\" aria-label=\"Read more about Green light for \u00a3150m West End office revamp\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30196","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30196"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30196\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}