{"id":30212,"date":"2025-04-30T05:26:11","date_gmt":"2025-04-30T12:26:11","guid":{"rendered":"https:\/\/essential.construction\/news\/bowmer-kirkland-to-build-190m-oxford-science-scheme\/"},"modified":"2025-04-30T05:26:11","modified_gmt":"2025-04-30T12:26:11","slug":"bowmer-kirkland-to-build-190m-oxford-science-scheme","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bowmer-kirkland-to-build-190m-oxford-science-scheme\/","title":{"rendered":"Bowmer + Kirkland to build \u00a3190m Oxford science scheme"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-497298\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"173\" data-end=\"352\">Developers Mission Street and BGO have appointed the firm to deliver the 180,000 sq ft Fabrica scheme on Botley Road, with work set to start at the end of May following groundworks by Colemans.<\/p>\n<p class=\"\" data-start=\"354\" data-end=\"476\">Due to complete in early 2027, Fabrica will be the biggest UK science project to break ground in the first half of 2025.<\/p>\n<p class=\"\" data-start=\"478\" data-end=\"671\">The five-storey building will sit at the heart of Oxford\u2019s West End innovation district, offering flexible lab and office space alongside 7,000 sq ft of public-facing amenities including F&amp;B.<\/p>\n<p data-start=\"673\" data-end=\"862\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-30-at-08.16.08.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-497302\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-04-30-at-08.16.08.png\" alt=\"-\" width=\"2862\" height=\"1710\"><\/a><\/p>\n<p class=\"\" data-start=\"673\" data-end=\"862\">Fabrica is targeting BREEAM Outstanding, EPC A and WiredScore Platinum ratings. It will also become Oxford\u2019s first Living Wage building, with all workers paid at or above the Living Wage.<\/p>\n<p class=\"\" data-start=\"864\" data-end=\"959\">Bowmer + Kirkland will use local labour and supply chains as part of its build strategy.<\/p>\n<p class=\"\" data-start=\"1094\" data-end=\"1292\">The win strengthens the contractor\u2019s growing reputation in the science and innovation sector. It is also working under a PCSA on Mission Street and BGO\u2019s 23-acre District East scheme in Cambridge.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/04\/30\/bowmer-kirkland-to-build-100m-oxford-science-scheme\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Developers Mission Street and BGO have appointed the firm to deliver the 180,000 sq ft Fabrica scheme on Botley &#8230; <a title=\"Bowmer + Kirkland to build \u00a3190m Oxford science scheme\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bowmer-kirkland-to-build-190m-oxford-science-scheme\/\" aria-label=\"Read more about Bowmer + Kirkland to build \u00a3190m Oxford science scheme\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30212","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30212"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30212\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}