{"id":30221,"date":"2025-04-30T17:27:28","date_gmt":"2025-05-01T00:27:28","guid":{"rendered":"https:\/\/essential.construction\/news\/scotlands-most-complex-a9-dualling-job-heads-to-market\/"},"modified":"2025-04-30T17:27:28","modified_gmt":"2025-05-01T00:27:28","slug":"scotlands-most-complex-a9-dualling-job-heads-to-market","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/scotlands-most-complex-a9-dualling-job-heads-to-market\/","title":{"rendered":"Scotland\u2019s most complex A9 dualling job heads to market"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p class=\"\" data-start=\"210\" data-end=\"371\">The \u00a3205m Pitlochry to Killiecrankie job will be the fifth section to go out to tender as part of the long-running upgrade of the A9 between Perth and Inverness.<\/p>\n<p class=\"\" data-start=\"373\" data-end=\"569\">Covering 6.4km of mostly single carriageway, the scheme includes a tough mix of 4km of existing highway widening and 2km of new route construction through sensitive rural terrain near protected environmental sites.<\/p>\n<p class=\"\" data-start=\"571\" data-end=\"834\">Key elements include demolition and replacement of three underbridges, two new bridges over the River Tummel and Loch Faskally, extensive rock excavation, and multiple junction upgrades\u2014including turning at-grade junctions into fully grade-separated interchanges.<\/p>\n<p class=\"\" data-start=\"836\" data-end=\"1016\">The works also feature complex drainage systems, culverts, retaining walls and environmental mitigation measures, all while minimising disruption in a heavily constrained corridor.<\/p>\n<p class=\"\" data-start=\"1018\" data-end=\"1165\">A competitive dialogue process is due to launch this summer, with a contract notice expected in July and a virtual industry day scheduled for June.<\/p>\n<p class=\"\" data-start=\"1167\" data-end=\"1411\">Transport Scotland will require the winning contractor to meet strict sustainability, community benefit, and fair work criteria. The project will be delivered under a design and build contract, with payments made through a Project Bank Account.<\/p>\n<p class=\"\" data-start=\"1413\" data-end=\"1497\">Final ministerial approval will still be needed before the procurement can progress.<\/p>\n<p class=\"\" data-start=\"1499\" data-end=\"1726\">For further information email <a rel=\"noopener nofollow\" href=\"http:\/\/www.constructionenquirer.com\/cdn-cgi\/l\/email-protection#b3c3d7d0f3c7c1d2ddc0c3dcc1c79dd4dcc59dc0d0dcc7\" target=\"_blank\"><strong data-start=\"1535\" data-end=\"1574\">Transport Scotland Team.<\/strong><\/a><\/p>\n<div class=\"break-out-box\">\n<h3>A9 dualling programme progress<\/h3>\n<hr>\n<p data-start=\"1499\" data-end=\"1726\">Balfour Beatty has justed started on the third \u00a3185m section of the A9 dualling Programme between Tomatin and Moy.<\/p>\n<p data-start=\"1499\" data-end=\"1726\">Contract award for \u00a3155m fourth section between Tay Crossing to Ballinluig expected in the coming months. Balfour Beatty, Wills Bros and Graham Construction shortlisted<\/p>\n<p data-start=\"1499\" data-end=\"1726\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/a9-dualling-delivery-map-dec-23-scaled.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-497341\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/a9-dualling-delivery-map-dec-23-scaled.jpg\" alt=\"-\" width=\"2560\" height=\"2010\"><\/a><\/p>\n<\/div><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/04\/30\/scotlands-most-complex-a9-dualling-job-heads-to-market\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The \u00a3205m Pitlochry to Killiecrankie job will be the fifth section to go out to tender as part of &#8230; <a title=\"Scotland\u2019s most complex A9 dualling job heads to market\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/scotlands-most-complex-a9-dualling-job-heads-to-market\/\" aria-label=\"Read more about Scotland\u2019s most complex A9 dualling job heads to market\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30221","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30221"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30221\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}