{"id":30362,"date":"2025-05-09T17:44:48","date_gmt":"2025-05-10T00:44:48","guid":{"rendered":"https:\/\/essential.construction\/news\/hs2-curzon-street-station-redesign-approved-as-timber-roof-axed\/"},"modified":"2025-05-09T17:44:48","modified_gmt":"2025-05-10T00:44:48","slug":"hs2-curzon-street-station-redesign-approved-as-timber-roof-axed","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/hs2-curzon-street-station-redesign-approved-as-timber-roof-axed\/","title":{"rendered":"HS2 Curzon Street station redesign approved as timber roof axed"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<p class=\"\" data-start=\"84\" data-end=\"299\">Revised plans for Birmingham\u2019s landmark HS2 Curzon Street station have been approved, with a major design change seeing the timber-lined roof swapped for copper-coloured aluminium panels<\/p>\n<p class=\"\" data-start=\"301\" data-end=\"488\">The Mace Dragados JV, working with Arcadis, WSP and lead architect Grimshaw made the change to meet tougher fire safety rules and cut future maintenance costs.<\/p>\n<p class=\"\" data-start=\"490\" data-end=\"717\">Birmingham City Council\u2019s planning committee signed off on the updated design after reviewing a report highlighting value for money, technical complexities, and engineering constraints as key drivers behind the design tweaks.<\/p>\n<p data-start=\"490\" data-end=\"717\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/3bbd9f438a314f04a374233268d44bed.jpg\" target=\"_blank\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-490574\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/3bbd9f438a314f04a374233268d44bed.jpg\" alt=\"-\" width=\"1120\" height=\"630\"><\/a><\/p>\n<p data-start=\"490\" data-end=\"717\">\n<p class=\"\" data-start=\"870\" data-end=\"1088\">The redesigned interior includes additional cycle parking, better accessibility, more seating and simplified platform access. A prominent southern entrance to the Eastern Concourse will also enhance links to Digbeth.<\/p>\n<p class=\"\" data-start=\"1090\" data-end=\"1274\">Major earthworks are already underway, with foundation work due to begin this autumn. Structural works will kick off in 2026, followed by internal fit-out through to the end of 2028.<\/p>\n<p data-start=\"1090\" data-end=\"1274\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/91d77d87f3ae4120bc553a7a70fb9886.jpg\" target=\"_blank\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-490575\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/91d77d87f3ae4120bc553a7a70fb9886.jpg\" alt=\"-\" width=\"1120\" height=\"630\"><\/a><\/p>\n<p class=\"\" data-start=\"1276\" data-end=\"1463\">Grimshaw partner Neven Sidor said: \u201cThe original design vision has not only been maintained but has also been enhanced. It is more robust, more efficient to build, and just as elegant.\u201d<\/p>\n<p data-start=\"1276\" data-end=\"1463\">\n<p data-start=\"1276\" data-end=\"1463\">\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/05\/09\/hs2-curzon-street-station-redesign-approved-as-timber-roof-axed\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Revised plans for Birmingham\u2019s landmark HS2 Curzon Street station have been approved, with a major design change seeing the &#8230; <a title=\"HS2 Curzon Street station redesign approved as timber roof axed\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/hs2-curzon-street-station-redesign-approved-as-timber-roof-axed\/\" aria-label=\"Read more about HS2 Curzon Street station redesign approved as timber roof axed\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30362","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30362"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30362\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}