{"id":30368,"date":"2025-05-10T05:45:29","date_gmt":"2025-05-10T12:45:29","guid":{"rendered":"https:\/\/essential.construction\/news\/leicester-rebids-22m-station-revamp-after-failed-tender-race\/"},"modified":"2025-05-10T05:45:29","modified_gmt":"2025-05-10T12:45:29","slug":"leicester-rebids-22m-station-revamp-after-failed-tender-race","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/leicester-rebids-22m-station-revamp-after-failed-tender-race\/","title":{"rendered":"Leicester rebids \u00a322m station revamp after failed tender race"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-497579\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"234\" data-end=\"427\">The station upgrade is being rebid with hopes to draw wider contractor interest following a rethink of the scheme, which will now launch with early contractor involvement and detailed design.<\/p>\n<p class=\"\" data-start=\"429\" data-end=\"600\">The previous two-stage design and build contest last summer failed to deliver, prompting the council, Network Rail and East Midlands Railway to overhaul the procurement.<\/p>\n<p class=\"\" data-start=\"887\" data-end=\"1173\">Backed by nearly \u00a318m of levelling up funding, the plan will bring Leicester\u2019s Grade II listed Victorian station back to life with structural changes, internal modifications, telecoms and M&amp;E upgrades, public realm works, and highway changes \u2014 all delivered to Network Rail standards.<\/p>\n<p class=\"\" data-start=\"1175\" data-end=\"1370\">The new design includes relocating the main entrance from London Road to Station Street, creating a public plaza with rainwater gardens and trees, and revealing the station\u2019s original frontage.<\/p>\n<p class=\"\" data-start=\"1372\" data-end=\"1575\">A fresh invitation to tender will be released by 29 July, with construction due to start by 30 April 2026 and finish in October 2028.<\/p>\n<p class=\"\" data-start=\"1577\" data-end=\"1762\">For more information <a rel=\"noopener nofollow\" href=\"http:\/\/www.constructionenquirer.com\/cdn-cgi\/l\/email-protection#a2e8cbc5ccc38cc6cacdd0c3c8cbc3e2cec7cbc1c7d1d6c7d08cc5cdd48cd7c9\" target=\"_blank\">email <\/a>Jigna Dhorajia at Leicester City Council.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/05\/09\/leicester-retenders-22m-station-revamp-after-failed-bid-race\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The station upgrade is being rebid with hopes to draw wider contractor interest following a rethink of the scheme, &#8230; <a title=\"Leicester rebids \u00a322m station revamp after failed tender race\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/leicester-rebids-22m-station-revamp-after-failed-tender-race\/\" aria-label=\"Read more about Leicester rebids \u00a322m station revamp after failed tender race\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30368","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30368"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30368\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}