{"id":30386,"date":"2025-05-11T17:31:07","date_gmt":"2025-05-12T00:31:07","guid":{"rendered":"https:\/\/essential.construction\/news\/42m-toronto-metropolitan-university-student-wellbeing-centre-breaks-ground\/"},"modified":"2025-05-11T17:31:07","modified_gmt":"2025-05-12T00:31:07","slug":"42m-toronto-metropolitan-university-student-wellbeing-centre-breaks-ground","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/42m-toronto-metropolitan-university-student-wellbeing-centre-breaks-ground\/","title":{"rendered":"$42M Toronto Metropolitan University Student Wellbeing Centre breaks ground"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>TORONTO \u2014 Set to rise on a tight site at the intersection of Bond and Gould streets, construction of Toronto Metropolitan University\u2019s new Student Wellbeing Centre (SWC) is officially underway. <\/p>\n<p>Designed by Siamak Hariri, founding partner of Hariri Pontarini Architects, the project involves preserving and restoring the heritage O\u2019Keefe House of 1855. <\/p>\n<p>An eight-storey, hybrid mass-timber tower will then emerge from the former student residence and features a transparent esthetic to create an inviting appeal. <\/p>\n<p>Students can access medical, health, wellness and academic support services currently scattered across the university.<\/p>\n<p>\u201cConfiguring these program relationships for visibility, security, and accessibility was critical to making the building welcoming and supportive of the privacy of individuals,\u201d said Hariri in a statement. <\/p>\n<p>The vertical stacking allows for a core of green terraces, meeting rooms and lounge spaces and creates a vertical landscaping motif of the \u201cTree of Well-being.\u201d <\/p>\n<p>There will be cantilevered glass boxes extending from the verdant double-height ground floor upwards through the centre of the building.<\/p>\n<p>\u201cThe project frames nature as the heart of the building and acknowledges its role in restoration and healing, a valued Indigenous perspective and approach to wellness inspired by the Food Forest<\/p>\n<p>Teachings of Elder Duke Redbird, introduced here by Two Row Architect,\u201d the release reads. <\/p>\n<p>Exposed timber decking will be used and the project is targeting Fitwel 2-star certification, an evidenced-based measure of the built environment\u2019s impact on human health and wellbeing.<\/p>\n<p>\u00a033,360-square-foot tower features a fritted glazed fa\u00e7ade on the north and west elevations. A new terrace on the rooftop of the heritage house adds a private space of retreat adjacent to group counselling rooms, the release adds. <\/p>\n<p>\u201cThis building will be a beacon of support to students at TMU in a space that offers shelter, renewal, and quiet strength,\u201d added Hariri. <\/p>\n<p>The $42-million project is largely funded by a student health and well-being fee and will open in 2027.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/05\/42m-toronto-metropolitan-university-student-wellbeing-centre-breaks-ground\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] TORONTO \u2014 Set to rise on a tight site at the intersection of Bond and Gould streets, construction of &#8230; <a title=\"$42M Toronto Metropolitan University Student Wellbeing Centre breaks ground\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/42m-toronto-metropolitan-university-student-wellbeing-centre-breaks-ground\/\" aria-label=\"Read more about $42M Toronto Metropolitan University Student Wellbeing Centre breaks ground\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-30386","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30386"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30386\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}