{"id":30561,"date":"2025-05-23T06:12:07","date_gmt":"2025-05-23T13:12:07","guid":{"rendered":"https:\/\/essential.construction\/news\/bouygues-go-ahead-for-south-london-estate-rebuild\/"},"modified":"2025-05-23T06:12:07","modified_gmt":"2025-05-23T13:12:07","slug":"bouygues-go-ahead-for-south-london-estate-rebuild","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bouygues-go-ahead-for-south-london-estate-rebuild\/","title":{"rendered":"Bouygues go-ahead for South London estate rebuild"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-498068\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"477\" data-end=\"687\">The next phase will deliver 295 new homes across four blocks on the eastern side of the estate.<\/p>\n<p class=\"\" data-start=\"477\" data-end=\"687\">Plans include a mix of maisonettes and one, two and three-bed flats, all designed in collaboration with residents.<\/p>\n<p class=\"\" data-start=\"689\" data-end=\"907\">The new homes follow the near-completion of phase one and form part of a four-phase masterplan that includes a new primary school, refurbished council homes, and a central park alongside 1,800 sqm of commercial space.<\/p>\n<p data-start=\"689\" data-end=\"907\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1343_tustin_streetview_updatejuly24-1-768x768-1.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-498069\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1343_tustin_streetview_updatejuly24-1-768x768-1.jpg\" alt=\"-\" width=\"768\" height=\"768\"><\/a><\/p>\n<p class=\"\" data-start=\"909\" data-end=\"1065\">Bouygues UK has been working with dRMM Studio Architects and estate residents through design workshops to shape everything from signage to interior colours.<\/p>\n<p class=\"\" data-start=\"1067\" data-end=\"1380\">Oliver Campbell, managing director at Bouygues UK, said: \u201cSecuring planning permission for Phase Two represents a significant milestone in our journey with the Tustin Estate community. The collaborative approach with residents has been instrumental in shaping a development that truly reflects local aspirations.\u201d<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/05\/23\/bouygues-go-ahead-for-south-london-estate-rebuild\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The next phase will deliver 295 new homes across four blocks on the eastern side of the estate. Plans &#8230; <a title=\"Bouygues go-ahead for South London estate rebuild\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bouygues-go-ahead-for-south-london-estate-rebuild\/\" aria-label=\"Read more about Bouygues go-ahead for South London estate rebuild\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30561","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30561"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30561\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}