{"id":30585,"date":"2025-05-24T18:15:12","date_gmt":"2025-05-25T01:15:12","guid":{"rendered":"https:\/\/essential.construction\/news\/race-on-for-60m-london-gateway-container-yard-job\/"},"modified":"2025-05-24T18:15:12","modified_gmt":"2025-05-25T01:15:12","slug":"race-on-for-60m-london-gateway-container-yard-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/race-on-for-60m-london-gateway-container-yard-job\/","title":{"rendered":"Race on for \u00a360m London Gateway container yard job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-498088\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p class=\"\" data-start=\"212\" data-end=\"353\">The \u00a360m civils and M&amp;E job will deliver 10 new automated stacking crane modules as part of the ongoing expansion of the deep-sea port.<\/p>\n<p class=\"\" data-start=\"355\" data-end=\"625\">The scope includes a hefty package of heavy-duty pavements, crane rail foundations, container and reefer plinths, drainage, services, substations, and light towers \u2013 with civil works designed by the client and electrical elements delivered under a design-and-build deal.<\/p>\n<p class=\"\" data-start=\"627\" data-end=\"755\">The contract will run for 19 months from December 2025, with bidders facing a two-stage procurement.<\/p>\n<p class=\"\" data-start=\"757\" data-end=\"890\">Interested firms have until 16 June 2025 to request participation, with 60% of marks weighted on cost and 40% on technical merit.<\/p>\n<p data-start=\"757\" data-end=\"890\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.constructionenquirer.com\/cdn-cgi\/l\/email-protection#b2dddec7d1dadb9cdcc5d3dbc5c7f2d6c2c5ddc0ded69cd1dddf\" target=\"_blank\">Email<\/a> for more bid information.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/05\/23\/race-on-for-60m-london-gateway-container-yard-job\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The \u00a360m civils and M&amp;E job will deliver 10 new automated stacking crane modules as part of the ongoing &#8230; <a title=\"Race on for \u00a360m London Gateway container yard job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/race-on-for-60m-london-gateway-container-yard-job\/\" aria-label=\"Read more about Race on for \u00a360m London Gateway container yard job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-30585","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30585"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30585\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}