{"id":30984,"date":"2025-06-19T19:18:31","date_gmt":"2025-06-20T02:18:31","guid":{"rendered":"https:\/\/essential.construction\/news\/crane-installed-at-170-roehampton-following-mid-rise-demolition\/"},"modified":"2025-06-19T19:18:31","modified_gmt":"2025-06-20T02:18:31","slug":"crane-installed-at-170-roehampton-following-mid-rise-demolition","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/crane-installed-at-170-roehampton-following-mid-rise-demolition\/","title":{"rendered":"Crane Installed at 170 Roehampton Following Mid-Rise Demolition"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/construction\" target=\"_blank\">CONSTRUCTION<\/a><\/span><br \/><span id=\"article_info\">June 19, 2025 <span class=\"article-author\">by Anthony Teles, Craig White<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329443\" alt=\"-\">\u00a0404\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Crane Installed at 170 Roehampton Following Mid-Rise Demolition<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>A crane now stands where a mid-20th century rental apartment building recently stood in Midtown Toronto. Demolition began in Fall, 2024 of a closed 7-storey rental building at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/170-roehampton.48554\" target=\"_blank\">170 Roehampton Avenue<\/a>. Quickly razed over the following weeks, shoring and excavation of the site followed and they too have now been completed. Where there were previously 53 rental suites, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/capital-developments.7671\" target=\"_blank\">Capital Developments<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/metropia.7768\" target=\"_blank\">Metropia<\/a> are building a 50-storey residential rental tower with 599 suites.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185135.jpg\" data-entity-uuid=\"insert-display_default-530b1be1-8713-43a6-b737-11572193e268\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Looking west to 170 Roehampton, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185135.jpg', true, 'Looking west to 170 Roehampton, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia'); return false;\"><span class=\"image-description\">Looking west to 170 Roehampton, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia<\/span><\/p>\n<p dir=\"ltr\">Since UrbanToronto last\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2022\/07\/capital-and-metropia-propose-46-storey-tower-roehampton.48556\" target=\"_blank\">covered the proposal<\/a> in 2022, the plans for the replacement building, designed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/sweeny-co-architects-inc.7950\" target=\"_blank\">Sweeny &amp;Co Architects Inc.<\/a>, were adjusted through resubmissions in December, 2024 and April, 2025. Changes included six added vehicular parking spaces for a new total of 97, one bicycle space for 600, one more unit above the 598 originally planned, a revision that added four floors, and another one that added a single additional centimetre in height.<\/p>\n<p dir=\"ltr\">Seen in September, 2024, this overhead view captures the original building&#8230;<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185127.jpg\" data-entity-uuid=\"insert-display_default-588f6603-d7b4-4963-9d20-01450a14b382\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Mid-rise at 170 Roehampton prior to demolition, looking north, image by UrbanToronto Forum contributor andresmmax\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185127.jpg', true, 'Mid-rise at 170 Roehampton prior to demolition, looking north, image by UrbanToronto Forum contributor andresmmax'); return false;\"><span class=\"image-description\">Mid-rise at 170 Roehampton prior to demolition, looking north, image by UrbanToronto Forum contributor andresmmax<\/span><\/p>\n<p dir=\"ltr\">&#8230;while three months later on a foggy day in December, 2024, demolition is underway on the building&#8217;s west side. A long-reach excavator outfitted with a concrete pulverizer works through the structure from the rear. Rubble and crushed material are accumulating on the west side, where soft landscaping has been fully stripped.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185128.jpeg\" data-entity-uuid=\"insert-display_default-7818ad8e-cb23-4dbe-b050-2d5528a1b8bf\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Looking north to demolition underway at the west end, image by UrbanToronto Forum contributor andresmmax\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185128.jpeg', true, 'Looking north to demolition underway at the west end, image by UrbanToronto Forum contributor andresmmax'); return false;\"><span class=\"image-description\">Looking north to demolition underway at the west end, image by UrbanToronto Forum contributor andresmmax<\/span><\/p>\n<p dir=\"ltr\">Viewed from across Roehampton Avenue, demolition progresses via a high-reach excavator equipped with a hydraulic pulverizer and dust suppression sprayer mounted near the attachment, meant to mitigate airborne particulate. Several floor plates have been sheared back, exposing interior units including remnants of fire damage sustained earlier in the Fall in part of the structure.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185129.jpg\" data-entity-uuid=\"insert-display_default-e3d3f6c0-f825-42c6-a207-669486fd3c36\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Looking northeast to mechanical demolition with exposed interiors and fire damage, image by UrbanToronto Forum contributor Urban Chairman\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185129.jpg', true, 'Looking northeast to mechanical demolition with exposed interiors and fire damage, image by UrbanToronto Forum contributor Urban Chairman'); return false;\"><span class=\"image-description\">Looking northeast to mechanical demolition with exposed interiors and fire damage, image by UrbanToronto Forum contributor Urban Chairman<\/span><\/p>\n<p dir=\"ltr\">Less than two weeks later, only a narrow five-storey section of the east side is still standing. The exposed concrete floor plates and vertical circulation core are marked by dangling rebar, fractured shear walls, and remnants of interior finishes. Tracked excavators continue to process debris and clear the site.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185130.jpg\" data-entity-uuid=\"insert-display_default-086d98a9-0e8e-418f-8369-437dd3958291\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Final portion of east wing standing amid demolition debris, image by UrbanToronto Forum contributor GenerationLee\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185130.jpg', true, 'Final portion of east wing standing amid demolition debris, image by UrbanToronto Forum contributor GenerationLee'); return false;\"><span class=\"image-description\">Final portion of east wing standing amid demolition debris, image by UrbanToronto Forum contributor GenerationLee<\/span><\/p>\n<p dir=\"ltr\">Shoring commenced in January, 2025, and by April, 2025, excavation for two underground levels is underway. Looking west, soldier piles and lagging are visible along the south shoring wall. A crew member is seen in the middle of the site, surrounded by steel H-piles that will eventually support the ground floor slab.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185131.jpg\" data-entity-uuid=\"insert-display_default-2c489017-44e5-40a0-8aab-a7b0fb169cdf\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Looking west to shoring and excavation progress with staging slab preparation at south end, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185131.jpg', true, 'Looking west to shoring and excavation progress with staging slab preparation at south end, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking west to shoring and excavation progress with staging slab preparation at south end, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">This month, the crane&#8217;s initial blue mast segment was being guided into position atop its concrete footing, suspended by chains from a mobile crane. Crew members, secured with protection harnesses, perform alignment and bolting tasks on the mast.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185132.jpeg\" data-entity-uuid=\"insert-display_default-55878748-c4bd-43fa-8fc2-456f40504e1b\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Initial crane mast section being installed, image by UrbanToronto Forum contributor andresmmax\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185132.jpeg', true, 'Initial crane mast section being installed, image by UrbanToronto Forum contributor andresmmax'); return false;\"><span class=\"image-description\">Initial crane mast section being installed, image by UrbanToronto Forum contributor andresmmax<\/span><\/p>\n<p dir=\"ltr\">In this close-up from later that day, installation had progressed to the operator cab and machinery deck of the luffing jib crane, a type used to work within the site&#8217;s constrained footprint for reduced swing radius. The central red slewing unit supports the rotating upper structure, while the operator cab is mounted to one side. The large blue winch drum at the rear houses the hoisting cable, while crew members work across the machinery platform.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185134.jpeg\" data-entity-uuid=\"insert-display_default-29600723-f9ef-41b7-9cde-b8076dcfee65\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Close-up of crane cab and machinery deck during installation, image by UrbanToronto Forum contributor andresmmax\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185134.jpeg', true, 'Close-up of crane cab and machinery deck during installation, image by UrbanToronto Forum contributor andresmmax'); return false;\"><span class=\"image-description\">Close-up of crane cab and machinery deck during installation, image by UrbanToronto Forum contributor andresmmax<\/span><\/p>\n<p dir=\"ltr\">In this northwest-facing view, the crane is nearing full assembly, with a mobile crane positioning the initial sections of the counterjib above the operator cab. At the bottom of the pit, we see concrete in place across some of the pit, while the ground level staging slab, already mostly covered in dirt, has been completed along the edge of the photo.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185133.jpeg\" data-entity-uuid=\"insert-display_default-0ebb6b1c-5c09-4d04-8eb8-8355b19d339a\" data-entity-type=\"file\" alt=\"170 Roehampton, Toronto, designed by Sweeny &amp;Co Architects Inc for Capital Developments and Metropia\" title=\"Looking northwest across site to the crane installation, image by UrbanToronto Forum contributor andresmmax\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58832\/58832-185133.jpeg', true, 'Looking northwest across site to the crane installation, image by UrbanToronto Forum contributor andresmmax'); return false;\"><span class=\"image-description\">Looking northwest across site to the crane installation, image by UrbanToronto Forum contributor andresmmax<\/span><\/p>\n<p dir=\"ltr\">170 Roehampton will rise to a final height of 160.85m.<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p dir=\"ltr\">UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/capital-developments.7671\" target=\"_blank\">Capital Developments<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/clark-construction-management-inc.38114\" target=\"_blank\">Clark Construction Management Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/crozier-consulting-engineers.31782\" target=\"_blank\">Crozier Consulting Engineers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/goldberg-group.29553\" target=\"_blank\">Goldberg Group<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/jablonsky-ast-and-partners.35673\" target=\"_blank\">Jablonsky, Ast and Partners<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/lea-consulting.36299\" target=\"_blank\">LEA Consulting<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/metropia.7768\" target=\"_blank\">Metropia<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/norris-fire-consulting-inc.46995\" target=\"_blank\">Norris Fire Consulting Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/studio-tla.8179\" target=\"_blank\">STUDIO tla<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/sweeny-co-architects-inc.7950\" target=\"_blank\">Sweeny &amp;Co Architects Inc.<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329443\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/06\/crane-installed-170-roehampton-following-mid-rise-demolition.58832\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0CONSTRUCTIONJune 19, 2025 by Anthony Teles, Craig White\u00a0\u00a0\u00a0404\u00a0 Crane Installed at 170 Roehampton Following Mid-Rise Demolition A crane now &#8230; <a title=\"Crane Installed at 170 Roehampton Following Mid-Rise Demolition\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/crane-installed-at-170-roehampton-following-mid-rise-demolition\/\" aria-label=\"Read more about Crane Installed at 170 Roehampton Following Mid-Rise Demolition\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-30984","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=30984"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/30984\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=30984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=30984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=30984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}