{"id":31111,"date":"2025-06-28T19:35:29","date_gmt":"2025-06-29T02:35:29","guid":{"rendered":"https:\/\/essential.construction\/news\/olt-conditionally-approves-neighbouring-madison-group-proposals-in-midtown\/"},"modified":"2025-06-28T19:35:29","modified_gmt":"2025-06-29T02:35:29","slug":"olt-conditionally-approves-neighbouring-madison-group-proposals-in-midtown","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/olt-conditionally-approves-neighbouring-madison-group-proposals-in-midtown\/","title":{"rendered":"OLT Conditionally Approves Neighbouring Madison Group Proposals in Midtown"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/planning\" target=\"_blank\">PLANNING<\/a><\/span><br \/><span id=\"article_info\">June 27, 2025 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329446\" alt=\"-\">\u00a01.1K\u00a0<\/span><\/div>\n<p><span id=\"article_title\">OLT Conditionally Approves Neighbouring Madison Group Proposals in Midtown<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>Three new towers have cleared a major hurdle on Eglinton Avenue just west of Yonge Street, as a consolidation of two adjacent\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/madison-group.7762\" target=\"_blank\">Madison Group<\/a> submissions has been approved in principle at the Ontario Land Tribunal. Scaled from 40 to 49 storeys, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/audax.7959\" target=\"_blank\">Audax<\/a> has reworked previous proposals for\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/50-90-eglinton-avenue-west.29387\" target=\"_blank\">50-90 Eglinton West<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/21-35-henning.53419\" target=\"_blank\">17-41 Henning Avenue<\/a> into an integrated development plan that would add new parkland while conserving a 1920s substation facade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185500.jpg\" data-entity-uuid=\"insert-display_default-c0d9e14d-9c8a-4f6e-a3e7-b795f9aabfd3\" data-entity-type=\"file\" alt=\"50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group\" title=\"Looking north to 50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185500.jpg', true, 'Looking north to 50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group'); return false;\"><span class=\"image-description\">Looking north to 50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group<\/span><\/p>\n<p dir=\"ltr\">The new designs for both sites were prepared by\u00a0Audax, taking over from\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/turner-fleischer-architects.8071\" target=\"_blank\">Turner Fleischer Architects<\/a> as Design Architect. The revisions react to years of feedback and appeals across the two sites. Heights have been trimmed on Eglinton and increased on Henning, redistributing density while addressing shadowing and transition concerns. The proposal combines retail-lined towers on Eglinton with a quieter, mid-block high-rise on Henning, forming an L-shaped footprint within walking distance of Eglinton station in Yonge Line 1 and soon also <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/eglinton-line-5.47725\" target=\"_blank\">Eglinton Line 5<\/a>.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185499.jpeg\" data-entity-uuid=\"insert-display_default-8ec6cc16-694c-4814-8fa2-98307a88322d\" data-entity-type=\"file\" alt=\"Previous plan, 50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group\" title=\"Looking northeast to the previous plan for 50-90 Eglinton Avenue West, designed by Audax for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185499.jpeg', true, 'Looking northeast to the previous plan for 50-90 Eglinton Avenue West, designed by Audax for Madison Group'); return false;\"><span class=\"image-description\">Looking northeast to the previous plan for 50-90 Eglinton Avenue West, designed by Audax for Madison Group<\/span><\/p>\n<p dir=\"ltr\">The combined site spans the south end of a block bounded by Eglinton Avenue West to the south, Henning Avenue to the west, and Duplex Avenue to the east. It includes the full addresses of 50 through 90 Eglinton West and 17 through 41 Henning Avenue, consolidated into one coordinated development site of 6,176m\u00b2.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185501.jpg\" data-entity-uuid=\"insert-display_default-bccf5163-151e-4cad-9e6e-fd116b17fb55\" data-entity-type=\"file\" alt=\"17-41 Henning Avenue, Toronto, designed by Audax for Madison Group\" title=\"Looking northeast to 17-41 Henning Avenue, Toronto, designed by Audax for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185501.jpg', true, 'Looking northeast to 17-41 Henning Avenue, Toronto, designed by Audax for Madison Group'); return false;\"><span class=\"image-description\">Looking northeast to 17-41 Henning Avenue, Toronto, designed by Audax for Madison Group<\/span><\/p>\n<p dir=\"ltr\">The block currently contains a mix of commercial buildings, a surface parking lot, and low-rise residential dwellings, along with a 1920s-era Toronto Hydro building. Surrounding uses include mid-rise apartments to the west, low-rise homes to the north, and the existing and planned high-rise cluster surrounding Yonge and Eglinton to the east.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185441.jpeg\" data-entity-uuid=\"insert-display_default-559dd626-5a64-4276-97c3-62b4a3d5981d\" data-entity-type=\"file\" alt=\"Previous plan, 21-35 Henning Avenue, Toronto, designed by Turner Fleischer Architects for Madison Group\" title=\"Looking southeast to the previous plan for the Henning Avenue site by Turner Fleischer Architects for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185441.jpeg', true, 'Looking southeast to the previous plan for the Henning Avenue site by Turner Fleischer Architects for Madison Group'); return false;\"><span class=\"image-description\">Looking southeast to the previous plan for the Henning Avenue site by Turner Fleischer Architects for Madison Group<\/span><\/p>\n<p dir=\"ltr\">The revised Eglinton Avenue site now feature two towers rising 46 (159.58m) and 49 storeys (169.03m), down from the previously proposed 46 and 58 storeys. Together, the towers would contain 1,101 condominium units, down from 1,206. The Gross Floor Area (GFA) for the design totals 69,379m\u00b2, yielding a Floor Space Index (FSI) of 13.18 time lot coverage. Of this, 66,241m\u00b2 is residential, while 3,138m\u00b2 is reserved for retail use fronting Eglinton Avenue West.<\/p>\n<p dir=\"ltr\">Amenity areas remain largely consistent with the previous plan, offering 1,887m\u00b2 indoors and 866m\u00b2 outdoors. Architectural plans call for six elevators per tower, or about one for every 92 units, indicating good response times. Below grade, a three-level garage would provide 217 vehicle spaces, down from 230 previously, as well as 924 long-term and 116 short-term bicycle parking spaces.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185503.jpg\" data-entity-uuid=\"insert-display_default-703f1f33-af54-4a95-a596-4f8de493d143\" data-entity-type=\"file\" alt=\"Site plan, 17-41 Henning Avenue, 50-90 Eglinton Avenue West, Toronto, Audax, Madison Group\" title=\"Site plan, designed by Audax for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185503.jpg', true, 'Site plan, designed by Audax for Madison Group'); return false;\"><span class=\"image-description\">Site plan, designed by Audax for Madison Group<\/span><\/p>\n<p dir=\"ltr\">The Henning Avenue assembly occupies a mid-block area that would be redeveloped with 40 storeys rising to a height of 137.6m, an increase from the 34 storeys and 119m originally proposed. The updated design includes 458 condominium units, up from 390 in the earlier submission, served by four elevators, or approximately one for every 115 units, up from 95 units previously. High-speed motors would be required for adequate service here.<\/p>\n<p dir=\"ltr\">The GFA would total 30,767m\u00b2, (up from 25,490m\u00b2), all of it residential, resulting in an FSI of 15.13 times lot coverage. Amenity areas entail 687m\u00b2 indoors and 479m\u00b2 outdoors. A two-level underground garage would include 45 residential parking spaces, consistent with the previous proposal, along with 352 long-term and 88 short-term bicycle parking spaces. A central feature of the approved plan is a new 589m\u00b2 public park to be conveyed to the City at the north end of the site, fronting Henning Avenue.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185502.jpg\" data-entity-uuid=\"insert-display_default-03f3dc29-8c23-4b3e-be6b-0f4abfe5edba\" data-entity-type=\"file\" alt=\"Ground floor plan, 17-41 Henning Avenue, 50-90 Eglinton Avenue West, Toronto, designed by Audax for Madison Group\" title=\"Ground floor plan, designed by Audax for Madison Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185502.jpg', true, 'Ground floor plan, designed by Audax for Madison Group'); return false;\"><span class=\"image-description\">Ground floor plan, designed by Audax for Madison Group<\/span><\/p>\n<p dir=\"ltr\">Located roughly 235m northwest of Eglinton station, the site benefits from close access to Line 1 and the soon-to-open Line 5. Avenue Road station on Line 5 is situated about 360m to the west. TTC bus routes operate along Eglinton Avenue.<\/p>\n<p dir=\"ltr\">The updated plans were approved in principle by the Ontario Land Tribunal in March, 2025, following a settlement between Madison Group and the City of Toronto. The decision resolves two separate appeals under a consolidated framework. Final approval remains subject to a series of conditions, including detailed engineering reviews, execution of a heritage easement agreement for the Toronto Hydro building, and completion of parkland conveyance. A Final Order from the Tribunal will be issued once these conditions are satisfied.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185504.jpg\" data-entity-uuid=\"insert-display_default-10bd5f43-4677-4104-bbf2-6d6ece371f16\" data-entity-type=\"file\" alt=\"Aerial view, 17-41 Henning Avenue, 50-90 Eglinton Avenue West, Toronto\" title=\"An aerial view of the sites and surrounding area, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/06\/58878\/58878-185504.jpg', true, 'An aerial view of the sites and surrounding area, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the sites and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">The projects are within the Midtown Toronto&#8217;s intensifying Yonge\u2013Eglinton node. Directly east at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/36-eglinton-west.42709\" target=\"_blank\">36 Eglinton West<\/a>, a 59-storey tower is proposed, while\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1-eglinton-east.14953\" target=\"_blank\">1 Eglinton East<\/a> is slated for 65 storeys. To the northeast,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/2350-yonge.48922\" target=\"_blank\">2350<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/2346-yonge-street.56002\" target=\"_blank\">2346 Yonge<\/a> would rise 50 and 56 storeys, respectively. Southeast,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/2180-yonge.43847\" target=\"_blank\">2180 Yonge<\/a> is set to deliver five towers ranging from 45 to 65 storeys. Madison\u2019s projects at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/110-eglinton-east.31613\" target=\"_blank\">110<\/a> and\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/150-eglinton-east.30309\" target=\"_blank\">150 Eglinton East<\/a>, designed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rafael-vinoly-architects.10826\" target=\"_blank\">Rafael Vin\u0303oly Architects<\/a>, would each feature twin towers at 58 and 61 storeys.<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p dir=\"ltr\">UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329446\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/06\/olt-conditionally-approves-neighbouring-madison-group-proposals-midtown.58878\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0PLANNINGJune 27, 2025 by Anthony Teles\u00a0\u00a0\u00a01.1K\u00a0 OLT Conditionally Approves Neighbouring Madison Group Proposals in Midtown Three new towers have &#8230; <a title=\"OLT Conditionally Approves Neighbouring Madison Group Proposals in Midtown\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/olt-conditionally-approves-neighbouring-madison-group-proposals-in-midtown\/\" aria-label=\"Read more about OLT Conditionally Approves Neighbouring Madison Group Proposals in Midtown\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-31111","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31111"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31111\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}