{"id":31118,"date":"2025-06-29T18:14:40","date_gmt":"2025-06-30T01:14:40","guid":{"rendered":"https:\/\/essential.construction\/news\/granite-led-jv-taps-into-240m-nevada-water-job\/"},"modified":"2025-06-29T18:14:40","modified_gmt":"2025-06-30T01:14:40","slug":"granite-led-jv-taps-into-240m-nevada-water-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/granite-led-jv-taps-into-240m-nevada-water-job\/","title":{"rendered":"Granite-led JV taps into $240M Nevada water job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><\/p>\n<p>            <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/images\/audio_icon.svg?482016190122\" alt=\"-\"><\/p>\n<p>        Listen to the article<br \/>\n        <span class=\"text-to-speech__button__audio-length\">3 min<\/span><br \/>\n    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"https:\/\/res.cloudinary.com\/dmgi9movl\/video\/upload\/q_1\/v1750886730\/news\/text_to_speech\/granite-jv-nevada-water-horiztontal-lateral_lcajbf.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><span><span><span><strong><span><span>Award: <\/span><\/span><\/strong><span><span><span>Water infrastructure project<span> <\/span><\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Value: <\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>$240 million<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Location: <\/span><\/span><\/strong><span><span><span>Henderson, Nevada<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Client: <\/span><\/span><\/strong><span><span><span>Southern Nevada Water Authority<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span>Granite Construction has more water business flowing its way.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The Watsonville, California-based contractor has won a construction-manager-at-risk contract, along with joint venture partner Contri Construction of Las Vegas, <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.graniteconstruction.com\/newsroom\/granite-and-jv-partner-advance-southern-nevada-water-infrastructure-paradise-hills-cmar\" target=\"_blank\"><span><span><span><span><span><span><span><span>from the Southern Nevada Water Authority<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, according to a June 23 news release. Granite\u2019s total estimated construction contract value is $240 million, the firm said.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Granite and Contri formed Southern Nevada Construction Partners to deliver the preconstruction phase of the Paradise Hills portion of <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.snwa.com\/infrastructure-improvements\/horizon-lateral\/index.html\" target=\"_blank\"><span><span><span><span><span><span><span><span>SNWA\u2019s larger, $2.7 billion Horizontal Lateral Program<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, which is aimed at protecting and improving water delivery and reliability in the Las Vegas Valley.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>SNCP\u2019s contract scope includes the installation of approximately 22,000 linear feet of 120-inch steel water pipeline, which will encompass three trenchless crossings beneath an existing 108-inch waterline, Interstate 11 and Union Pacific Railroad tracks. Contri will be responsible for installing the 120-inch pipeline and associated equipment, according to the release.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Construction will also incorporate multiple valved outlets for future connections to Boulder City, the city of Henderson\u2019s Reservoir R-8 and the Horizon Lateral pipeline. Also under scope is the construction of a pumping station with a 65 million-gallons-per-day capacity, which will initially operate at 35 million gallons per day, per the release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The facility will comprise a single-level pump building with mechanical, electrical and disinfection systems, surge protection infrastructure, flow metering and advanced instrumentation and control systems. Civil grading, access roads, perimeter security and desert-compliant landscaping will be incorporated as site improvements.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>As the JV lead, Granite will perform clearing and grubbing operations, structure excavations and backfill, form\/place\/strip of concrete structures, installation of access roads along the pipeline alignment, demolition and restoration of existing roadways and the full installation of all pump station structures and equipment, per the release.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cThrough SNCP, we\u2019re delivering a high-value, future-ready water infrastructure solution that supports the long-term needs of Southern Nevada,\u201d said Don Sawyer, Granite area manager.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Preconstruction is slated for completion in December 2026, with construction scheduled to kick off in January 2027 and anticipated completion in January 2030<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/granite-jv-nevada-water-horiztontal-lateral\/751689\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 3 min This audio is auto-generated. Please let us know if you have feedback. Award: &#8230; <a title=\"Granite-led JV taps into $240M Nevada water job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/granite-led-jv-taps-into-240m-nevada-water-job\/\" aria-label=\"Read more about Granite-led JV taps into $240M Nevada water job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-31118","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31118"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31118\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}