{"id":31396,"date":"2025-07-18T07:42:48","date_gmt":"2025-07-18T14:42:48","guid":{"rendered":"https:\/\/essential.construction\/news\/richmond-centre-sets-canadian-bar-for-ev-chargers\/"},"modified":"2025-07-18T07:42:48","modified_gmt":"2025-07-18T14:42:48","slug":"richmond-centre-sets-canadian-bar-for-ev-chargers","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/richmond-centre-sets-canadian-bar-for-ev-chargers\/","title":{"rendered":"Richmond Centre sets Canadian bar for EV chargers"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<p>With over 1,200 electric vehicle chargers, B.C.\u2019s Richmond Centre has launched Canada&#8217;s largest multi-residential EV charging project.<\/p>\n<div>\n<div id=\"attachment_1003985622\" style=\"width: 310px\" class=\"wp-caption alignright\"><a rel=\"magnific nofollow noopener\" href=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px.jpg\" target=\"_blank\"><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-1003985622\" class=\"size-medium wp-image-1003985622\" src=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-300x169.jpg\" alt=\"EV charging parkade at Richmond Centre.\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-300x169.jpg 300w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-1024x576.jpg 1024w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-768x432.jpg 768w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-1536x864.jpg 1536w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-250x141.jpg 250w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px-600x338.jpg 600w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/07\/Image-1600-X-900-px.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" data-mwl-img-id=\"1003985622\"\/><\/a><\/p>\n<p id=\"caption-attachment-1003985622\" class=\"wp-caption-text\">EV charging parkade at Richmond Centre. (Photo courtesy of Elocity Technologies)<\/p>\n<\/div>\n<p style=\"font-weight: 400;\">Located near Richmond City Hall, and owned by Cadillac Fairview, Richmond Centre, in Richmond, B.C., recently opened what Electric Vehicle (EV) charger technology company Elocity Technologies Inc. says is Canada\u2019s largest multi-residential EV charging project. Featuring 1,212 state-of-the-art Elocity smart chargers in a parkade spanning an area the size of six football fields, the project is step forward for tenant convenience and sustainable urban living.<\/p>\n<p style=\"font-weight: 400;\">The parkade, which was built by Axiom Builders with key project partners Natural Resources Canada, the City of Richmond, Ozz Electric, Enlightened Building Technologies and Elocity Technologies, features smart chargers equipped with advanced electrical power-sharing technology designed to make efficient use of infrastructure, balancing overall energy usage of charging vehicles and the electrical demands of the building.<\/p>\n<p style=\"font-weight: 400;\">Calculations suggest the project holds the potential to replace over 13 million miles of gasoline vehicle travel, with GHG reductions similar to avoiding the methane associated with half a million trash bags in landfill.<\/p>\n<p style=\"font-weight: 400;\">\u201cAs the end-to-end technology provider for this project, we are honoured to enable a seamless EV charging experience while reinforcing grid stability and sustainability,\u201d stated Elocity founder and CEO Sanjeev Singh. \u201cOur continued investment in AI-driven energy management and demand response technology makes EV infrastructure scalable, cost-efficient, and future-ready.\u201d<\/p>\n<p style=\"font-weight: 400;\">\u201cRichmond Centre is now home to one of Canada\u2019s most comprehensive EV charging infrastructure, with every residential stall equipped with a charger at no cost to homeowners, made possible through support from Natural Resources Canada,\u201d stated Dan Wilson, executive vice-president of residential at real estate investment, development and management company Shape Properties. \u201cBy integrating this infrastructure into the residential offering of our master-planned community, we are eliminating barriers to EV adoption.\u201d<\/p>\n<p style=\"font-weight: 400;\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.enlightenedbuilding.com\/\" target=\"_blank\">www.enlightenedbuilding.com<\/a><\/p>\n<p style=\"font-weight: 400;\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.elocitytech.com\/\" target=\"_blank\">www.elocitytech.com<\/a><\/p>\n<\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/construction\/richmond-centre-sets-canadian-bar-for-ev-chargers\/1003985621\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] With over 1,200 electric vehicle chargers, B.C.\u2019s Richmond Centre has launched Canada&#8217;s largest multi-residential EV charging project. EV charging &#8230; <a title=\"Richmond Centre sets Canadian bar for EV chargers\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/richmond-centre-sets-canadian-bar-for-ev-chargers\/\" aria-label=\"Read more about Richmond Centre sets Canadian bar for EV chargers\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[],"class_list":["post-31396","post","type-post","status-publish","format-standard","hentry","category-onsite-magazine","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31396"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31396\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}