{"id":31584,"date":"2025-07-30T07:17:36","date_gmt":"2025-07-30T14:17:36","guid":{"rendered":"https:\/\/essential.construction\/news\/data-centers-seek-flexible-power-solutions-for-resilience-sustainability\/"},"modified":"2025-07-30T07:17:36","modified_gmt":"2025-07-30T14:17:36","slug":"data-centers-seek-flexible-power-solutions-for-resilience-sustainability","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/data-centers-seek-flexible-power-solutions-for-resilience-sustainability\/","title":{"rendered":"Data centers seek flexible power solutions for resilience, sustainability"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><br \/>\n        <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/img\/play.svg?500116090725\" alt=\"-\"><br \/>\n        Listen to the article<br \/>\n        <span class=\"text-to-speech__button__audio-length\">9 min<\/span><br \/>\n    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"https:\/\/res.cloudinary.com\/dmgi9movl\/video\/upload\/q_1\/v1753811596\/news\/text_to_speech\/data-centers-power-solutions_ocjcjk.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<p><span><span><span><span><span><span>AI data centers in the United States could consume 33.8 gigawatts of power by 2030, or about 3% of the country\u2019s <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.publicpower.org\/resource\/americas-electricity-generating-capacity\" target=\"_blank\"><span><span><span><span><span><span><span><span>generating capacity<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, Schneider Electric <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/sustainable-ai-requires-close-collaboration-between-data-centers-grid-st\/747014\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>said earlier this year<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>. Some AI power demand projections are even more aggressive, like a 2024 RAND Corporation forecast cited by Schneider that sees 130 GW of data center demand in 2030.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>With data center projects <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.datacenterwatch.org\/report\" target=\"_blank\"><span><span><span><span><span><span><span><span>worth at least $64 billion<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> delayed or blocked by local opposition and state policymakers and regulators placing restrictions on development, a backlash appears to be brewing.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Data center opponents cite a <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.npr.org\/2025\/07\/17\/nx-s1-5469933\/virginia-data-centers-residents-saying-no\" target=\"_blank\"><span><span><span><span><span><span><span><span>litany of concerns<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, from noise to water pollution, but some of the most frequently cited center on the local impacts of onsite power generation and broader effects on the electric grid. Earlier this month, Elon Musk\u2019s xAI overcame local opposition to <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/subscriber.politicopro.com\/article\/eenews\/2025\/07\/03\/musks-xai-gets-air-permit-for-memphis-supercomputer-00438393\" target=\"_blank\"><span><span><span><span><span><span><span><span>secure an air permit<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> for a fleet of gas generators at its AI training center in Memphis, Tenn.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Texas lawmakers recently passed a law requiring new data centers to <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/texas-law-gives-grid-operator-power-to-disconnect-data-centers-during-crisi\/751587\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>disconnect from the grid<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> during periods of high power demand. Several states have implemented or are considering special utility tariffs requiring data center companies to cover the costs of grid upgrades they benefit from. North Carolina utility regulators plan <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/growing-reliability-concerns-top-north-carolina-regulators-large-load-co\/752307\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>a technical conference<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> in October on data centers\u2019 potential impacts on power reliability.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Data centers\u2019 appetite for power and the growing recognition that unchecked growth would be a problem for the grid could cause short-term growing pains for the industry, said Kelcy Pegler, CEO of FlexGen, a battery management software company.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cFrom a societal perspective, we are underestimating the impact that data centers will have on the grid,\u201d Pegler said in an interview. \u201cWe\u2019re going to have a break-in period where data center ambitions will have trouble coming to fruition.\u201d<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Earlier this year, <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.businesswire.com\/news\/home\/20250603612484\/en\/FlexGen-and-Rosendin-Partner-to-Deliver-First-of-its-Kind-Battery-Storage-Solution-for-Data-Centers\" target=\"_blank\"><span><span><span><span><span><span><span><span>FlexGen partnered with electrical contractor Rosendin<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> to develop and deploy a battery-based solution to help AI data centers operate more reliably with fewer impacts on nearby utility customers and the grid as a whole. Their solution could also lower data centers\u2019 <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/my.idc.com\/getdoc.jsp?containerId=prUS52611224\" target=\"_blank\"><span><span><span><span><span><span><span><span>enormous power costs<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> \u2014 which can reach 60% of operating expenses \u2014 while reducing fossil-fuel generator use, Pegler said.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<h3><span><span><span><span><span><span>Better power management with fewer grid impacts<\/span><\/span><\/span><\/span><\/span><\/span><\/h3>\n<p><span><span><span><span><span><span>FlexGen and Rosendin teamed up to keep AI data center operators ahead of an expected exponential increase in newer facilities\u2019 power density that outstrips the capabilities of traditional <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.energystar.gov\/products\/uninterruptible_power_supplies\" target=\"_blank\"><span><span><span><span><span><span><span><span>uninterruptible power supply systems<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>UPS systems integrate directly with individual server racks and respond near-instantaneously to power interruptions, protecting sensitive chips and networking equipment from damage. But the latest NVIDIA chips consume far more power than previous generations despite <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/developer.nvidia.com\/blog\/nvidia-blackwell-ultra-for-the-era-of-ai-reasoning\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>significant efficiency improvements<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, necessitating more powerful battery backup systems at the building or campus level, Pegler said.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cNo one saw this coming because no one knew how [powerful] the new chip would be,\u201d he said.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>That touched off a scramble among data center developers to find solutions for facilities in development today. Those facilities already look different than their predecessors because the latest chips generally need <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.facilitiesdive.com\/news\/2025-outlook-data-center-cooling-electricity-demand-ai-dual-phase-direct-to-chip-energy-efficiency\/737920\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>some form of liquid cooling<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, which rejects heat more effectively than forced air.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The FlexGen-Rosendin offering is \u201ca smarter, leaner, and more responsive approach to data center energy design that doesn\u2019t require any redesigns inside the walls of the data center,\u201d FlexGen Chief Innovation Officer Pasi Taimela said last month.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The partnership combines Rosendin\u2019s utility-scale \u201cBESSUPS\u201d battery backup system with FlexGen technology that allows data centers to transition smoothly between grid-connected and \u201cisland\u201d modes, the companies say. Pegler said the solution is a key reliability backstop for data centers as real-time demand for AI inference rises in critical industries.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<section class=\"storylines-carousel-wrapper hide-small show-large\" id=\"desktop-carousel\"\/>\n<p><span><span><span><span><span><span>Today, \u201cChatGPT is willing to say, \u2018Sorry, I can\u2019t help you right now,\u2019 but you can imagine a lot of future use cases\u201d \u2014 like time-sensitive healthcare functions \u2014 \u201cwhere \u2018I can\u2019t help you right now\u2019 is not an option,\u201d he said.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Flexible BESSUPS systems also position data centers to support rather than burden the grid with their at-times overwhelming demand for power, FlexGen and Rosendin say. During periods of high stress on the grid, such as hot summer evenings, facilities can run off their own batteries. Or, if they can afford to ramp down some computing processes, they can temporarily transform into power plants and dispatch the energy stored in those batteries to the grid.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>And even in non-emergency situations, data centers\u2019 power demand can change rapidly in a matter of minutes, causing voltage fluctuations that can damage the sensitive computing systems onsite and unrelated <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/ai-data-centers-causing-distortions-in-us-power-grid-bloomberg\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>commercial and consumer equipment nearby<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>. A Wood Mackenzie analysis last month saw power consumption at one hyperscale data center <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.woodmac.com\/horizons\/us-data-centre-power-demand-challenges-electricity-market-model\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>drop by 30% in five minutes<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> after spiking nearly as fast, for example.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Data centers\u2019 BESSUPS systems can smooth out these sometimes \u201cviolent\u201d voltage variations and protect sensitive equipment, like <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/batteries-grid-state-of-reliability-nerc\/750649\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>utility-scale battery systems do on the main grid<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span>, Pegler said.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<h3><span><span><span><span><span><span>Bridging the grid connection gap<\/span><\/span><\/span><\/span><\/span><\/span><\/h3>\n<p><span><span><span><span><span><span>FlexGen and Rosendin are teaming up to provide one option in a broad set of complementary onsite power solutions for data centers facing grid constraints, experts say. Other options include onsite gas generators, batteries and solar panels \u2014 or some combination thereof \u2014 as \u201cbridging\u201d the potentially five- to seven-year gap between interconnection request and final approval for a 1-GW hyperscale data campus, says Jim Grice, chair of the data centers and digital infrastructure practice at the law firm Akerman.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<section class=\"storylines-carousel-wrapper show-small hide-large\" id=\"mobile-carousel\"\/>\n<p><span><span><span><span><span><span>The buildout of a hyperscale data campus doesn\u2019t happen all at once, Grice said in an interview. A typical hyperscale campus might start at 100 to 200 megawatts and then scale to 1 GW over time, he said, ideally after the grid connection comes through. At that point, the \u201cbridge\u201d power infrastructure can transition into a backup role and \u2014 like FlexGen and Rosendin envision \u2014 potentially act as a self-contained <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.facilitiesdive.com\/news\/oregon-legislature-passes-first-in-nation-microgrid-framework\/752687\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>microgrid<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> when grid demand peaks.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>But while the \u201cbridge\u201d doesn\u2019t have to power the entire site at full buildout, it does have to be as resilient as a grid connection plus onsite backup power and not cost multiple times more, Grice said.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cYou basically have to overprovision your power capacity, and that is going to have an impact on pricing,\u201d he said. \u201cIt\u2019s like 3-D chess.\u201d<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The need for redundancy has some developers racing to acquire and stockpile gas-fired generators, but order queues even for smaller generators \u2014 and not just the larger turbines <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/heatmap.news\/ideas\/natural-gas-turbine-crisis\" target=\"_blank\"><span><span><span><span><span><span><span><span>booked out to the end of the decade<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> \u2014 now stretch out for years in some cases, Grice said. Developers able to source gas generators sooner, like the group behind a <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/homer-city-gas-fired-power-station-data-center-firstenergy\/744332\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>$10 billion Pennsylvania power project<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> that aims to begin operating next year, have openly touted their plans.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<h3><span><span><span><span><span><span>Keeping sustainability goals within reach<\/span><\/span><\/span><\/span><\/span><\/span><\/h3>\n<p><span><span><span><span><span><span>For rural data center campuses with fewer space constraints, onsite renewable energy may offer faster \u201ctime to power\u201d than gas, Grice said. Google <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/google-intersect-power-co-located-energy-park-data-center-ferc\/735198\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>announced last year<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> that it would locate data centers near and buy power from up to $20 billion of sustainably powered \u201cenergy parks\u201d developed by Intersect Power, the first of which could come online next year. The catch is that onsite renewables require more space than gas generators \u2014 about six to eight acres per megawatt of solar capacity, Grice said.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Despite that, and despite <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/house-passes-senate-megabill-trump-ira-tax-credit\/752276\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>policy headwinds for renewable energy<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> at the federal level, most data center companies prefer clean power if at all possible, Grice said.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cAll things being equal, if there\u2019s a site available with solar plus batteries and grid backup, [a data center would] select that over connecting to a grid powered mostly by coal,\u201d Grice said. \u201cWe\u2019re seeing all sorts of [data center] development strategies with large-scale renewables \u2014 that is very much a market trend that\u2019s happening.\u201d\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>That may be why some data center companies are <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.facilitiesdive.com\/news\/data-center-flow-zinc-battery-xl-eos-prometheus\/751325\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>bullish on novel energy storage technologies<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> that could satisfy their high uptime requirements while further reducing reliance on fossil-fueled power from onsite generators or the power grid itself.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Prometheus Hyperscale announced in May that it would add organic flow batteries from XL Batteries in phases at a Wyoming data center. First up is a small pilot project, set for 2027, to validate the technology\u2019s capabilities. If the pilot goes well, two systems capable of discharging 12.5 MW per hour for 10 hours would follow in 2028 and 2029, the companies say.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Unlike today\u2019s dominant lithium-ion chemistry, organic flow batteries\u2019 active materials are non-toxic, non-flammable and non-corrosive, making them safer to place near multi-billion-dollar data centers. (Prometheus will also bury its batteries so they perform better in the harsh Wyoming climate, senior energy advisor Adam Mirick said in an interview.)<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Additionally, flow batteries can more economically sustain maximum discharge rates over longer periods of time than lithium-ion batteries. That means they can more reliably power data centers with stored energy from the wind, sun and other low-emissions sources \u2014 including, potentially, the <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.prometheushyperscale.com\/news\/oklo-partners-with-wyoming-hyperscale-to-deliver-100-megawatts-to-its-data-centers\" target=\"_blank\"><span><span><span><span><span><span><span><span>small nuclear reactors Prometheus<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> and <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.utilitydive.com\/news\/oklo-aurora-smr-advanced-nuclear-reactor-supply-agreement-data-center-developer-switch\/735933\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>some other data center companies<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> hope to power their facilities in the future.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cIf this does work, and we think it will, that gives us a line of sight to acquire and begin to incorporate [flow batteries] into future data centers,\u201d Mirick said.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/data-centers-power-solutions\/756168\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 9 min This audio is auto-generated. Please let us know if you have feedback. AI &#8230; <a title=\"Data centers seek flexible power solutions for resilience, sustainability\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/data-centers-seek-flexible-power-solutions-for-resilience-sustainability\/\" aria-label=\"Read more about Data centers seek flexible power solutions for resilience, sustainability\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-31584","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31584"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31584\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}