{"id":31613,"date":"2025-07-31T20:50:42","date_gmt":"2025-08-01T03:50:42","guid":{"rendered":"https:\/\/essential.construction\/news\/junction-sq-condos-tops-off-on-keele-near-dundas\/"},"modified":"2025-07-31T20:50:42","modified_gmt":"2025-08-01T03:50:42","slug":"junction-sq-condos-tops-off-on-keele-near-dundas","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/junction-sq-condos-tops-off-on-keele-near-dundas\/","title":{"rendered":"Junction SQ Condos Tops Off on Keele near Dundas"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/junction-sq-condos.27887\" target=\"_blank\">Junction SQ Condos<\/a>, a five-storey boutique residential building at 410 Keele Street has topped off. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/raw-design.8045\" target=\"_blank\">RAW Design<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/block-developments.21929\" target=\"_blank\">Block Developments<\/a>, the mid-rise project one block north of Dundas Street in Toronto\u2019s Junction neighbourhood, echoes the industrial aesthetic of the area, bringing a contemporary mix of red and grey brick masonry.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186812.jpeg\" data-entity-uuid=\"insert-display_default-f1b16914-995f-4a8a-bdc8-7b46ceac10a2\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"Looking southwest to Junction SQ Condos, designed by RAW Design for Block Developments\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186812.jpeg', true, 'Looking southwest to Junction SQ Condos, designed by RAW Design for Block Developments'); return false;\"><span class=\"image-description\">Looking southwest to Junction SQ Condos, designed by RAW Design for Block Developments<\/span><\/p>\n<p dir=\"ltr\">Back in mid-August 2024, excavation had reached its full depth, following work that began in January. In a wide view of the site looking southwest from Keele Street, soldier piles and timber lagging line the shoring wall, supported by a series of angled H-beam braces. A horizontal steel raker reinforces the southwest corner. At the bottom of the pit, bundled rebar, formwork, and materials are staged. A sloped ramp at the northwest corner provides site access. The concrete base pad for the upcoming crane is visible at the south end, in preparation for its installation the following month.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186807.jpg\" data-entity-uuid=\"insert-display_default-afe49c16-fd02-4d7a-bcbe-b6a4dbc5e705\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"Looking southwest from Keele Street to the excavation and tower crane base, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186807.jpg', true, 'Looking southwest from Keele Street to the excavation and tower crane base, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking southwest from Keele Street to the excavation and tower crane base, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Construction emerged above grade by February, 2025. Seen here in March, the concrete frame has risen two floors, where active slab work is underway with conduit, mechanical sleeves, and rebar matting staged ahead of a concrete pour for the third floor. A red concrete boom pump, positioned off Vine Avenue, arcs over the site to place concrete near the centre, north of the blue crane. Scaffolding is in place along the Keele Street frontage, while red safety fencing lines the second and third floor slabs.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186808.jpg\" data-entity-uuid=\"insert-display_default-3b9dc0a2-4520-48d5-aaef-e832658288fb\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"A high-angle view looking south to construction to the concrete pour for the third-floor slab, image by UrbanToronto Forum contributor Westender100\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186808.jpg', true, 'A high-angle view looking south to construction to the concrete pour for the third-floor slab, image by UrbanToronto Forum contributor Westender100'); return false;\"><span class=\"image-description\">A high-angle view looking south to construction to the concrete pour for the third-floor slab, image by UrbanToronto Forum contributor Westender100<\/span><\/p>\n<p dir=\"ltr\">Looking south from Keele Street in late June, 2025, the structure had progressed to the fourth storey, with formwork and slab decking underway for the fifth floor. This street-level view shows active formwork supported by vertical shoring posts. On the east and north elevations, cladding installation is visible at grade, including sections of clear glazing set within dark mullions, along with black spandrel panels and metal louvres. They are surrounded by white weatherproofing.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186809.jpg\" data-entity-uuid=\"insert-display_default-c3fad3bd-6429-40ab-82ec-b83305531b00\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"Looking south from Keele Street to initial cladding and glazing at grade, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186809.jpg', true, 'Looking south from Keele Street to initial cladding and glazing at grade, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking south from Keele Street to initial cladding and glazing at grade, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Earlier this month, concrete work had progressed on the uppermost residential floor. Formwork panels are visible in the centre, north of the crane. Along the east elevation, the parapet geometry reveals a staggered, sawtooth profile, defining a series of boxed planters as part of the landscaping. Below, glazing and cladding continue to advance on the north elevation.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186810.jpg\" data-entity-uuid=\"insert-display_default-a3ab142b-3839-435f-a399-eb4b86391533\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"A wide high-angle view of construction on the parapet and top residential floor, image by UrbanToronto Forum contributor Westender100\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186810.jpg', true, 'A wide high-angle view of construction on the parapet and top residential floor, image by UrbanToronto Forum contributor Westender100'); return false;\"><span class=\"image-description\">A wide high-angle view of construction on the parapet and top residential floor, image by UrbanToronto Forum contributor Westender100<\/span><\/p>\n<p dir=\"ltr\">Captured yesterday, this view looking northwest from Keele Street shows the concrete formed for the mechanical penthouse, which will be surrounded by rooftop terraces. White weatherproofing is installed on the south elevation up to the fourth floor, with white and blue weatherproofing along the angled east elevation. Metal framing is in place on both elevations in advance of cladding installation. Scaffolding and sidewalk hoarding remain at grade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186811.jpg\" data-entity-uuid=\"insert-display_default-aa064bcd-5dcb-48b7-991a-85fbe3e626e4\" data-entity-type=\"file\" alt=\"Junction SQ Condos, Toronto, designed by RAW Design for Block Developments\" title=\"Looking northwest from Keele Street to weatherproofing materials installed in preparation for cladding, image by UrbanToronto Forum contributor Westender100\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/59111\/59111-186811.jpg', true, 'Looking northwest from Keele Street to weatherproofing materials installed in preparation for cladding, image by UrbanToronto Forum contributor Westender100'); return false;\"><span class=\"image-description\">Looking northwest from Keele Street to weatherproofing materials installed in preparation for cladding, image by UrbanToronto Forum contributor Westender100<\/span><\/p>\n<p dir=\"ltr\">Along Keele Street and the north elevation, red Brampton Brick masonry is planned for the first four storeys, with lighter grey brick cladding to distinguish the stepped-back fifth floor. On the south elevation, a mix of glass spandrel and light- and red-toned brick masonry would provide contrast. Once complete, the building will stand 16.84m and contain 65 condominium units.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<p dir=\"ltr\">\u00a0<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/07\/junction-sq-condos-tops-keele-near-dundas.59111\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Junction SQ Condos, a five-storey boutique residential building at 410 Keele Street has topped off. Designed by RAW Design &#8230; <a title=\"Junction SQ Condos Tops Off on Keele near Dundas\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/junction-sq-condos-tops-off-on-keele-near-dundas\/\" aria-label=\"Read more about Junction SQ Condos Tops Off on Keele near Dundas\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-31613","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31613"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31613\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}