{"id":31663,"date":"2025-08-03T20:56:49","date_gmt":"2025-08-04T03:56:49","guid":{"rendered":"https:\/\/essential.construction\/news\/night-shift-urbantoronto\/"},"modified":"2025-08-03T20:56:49","modified_gmt":"2025-08-04T03:56:49","slug":"night-shift-urbantoronto","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/night-shift-urbantoronto\/","title":{"rendered":"Night Shift | UrbanToronto"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Late on a recent night, UrbanToronto Forum contributor <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/forum\/threads\/toronto-one-bloor-west-308-6m-85s-tridel-foster-partners.18167\/post-2254594\" target=\"_blank\">MJS<\/a> caught work underway on one of the mechanical sections of One Bloor West, with two members of the work crew hoisted high in a cherry picker from a mobile crane parked below on Yonge Street. Whatever they are doing exactly though, is surrounded in a mystery as dark as the night (as Tridel didn&#8217;t get back to us with an explanation). Looks cool though, as if it were lit for the stage.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/58954\/58954-185897.jpg\" data-entity-uuid=\"insert-display_default-bb80ad03-02ad-4f4f-8301-dac7f09367be\" data-entity-type=\"file\" alt=\"Work proceeds overnight on One Bloor West, Toronto\" title=\"Work proceeds overnight on One Bloor West, image by UrbanToronto Forum contributor MJS\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/07\/58954\/58954-185897.jpg', true, 'Work proceeds overnight on One Bloor West, image by UrbanToronto Forum contributor MJS'); return false;\"><span class=\"image-description\">Work proceeds overnight on One Bloor West, image by UrbanToronto Forum contributor MJS<\/span><\/p>\n<p>Want to see your work featured as Daily Photo? You can post in the\u00a0<a rel=\"nofollow noopener\" href=\"http:\/\/urbantoronto.ca\/forum\/forums\/photos-and-videos.9\/\" target=\"_blank\">City Photos &amp; Videos<\/a>\u00a0section of the UrbanToronto Forum, or submit your images to our\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/www.flickr.com\/groups\/urbantoronto\" target=\"_blank\">UrbanToronto Flickr Pool<\/a>\u00a0for your chance to be featured on our Front Page.\u00a0<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on construction projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ah-tuned-mass-dampers.44586\" target=\"_blank\">A&amp;H Tuned Mass Dampers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/aercoustics-engineering-ltd.44962\" target=\"_blank\">Aercoustics Engineering Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/core-architects.7969\" target=\"_blank\">Core Architects<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/doka-canada-ltdltee.43947\" target=\"_blank\">Doka Canada Ltd.\/Ltee<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/egis.32488\" target=\"_blank\">Egis<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kramer-design-associates-limited.22923\" target=\"_blank\">Kramer Design Associates Limited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/live-patrol-inc.30547\" target=\"_blank\">Live Patrol Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mcw-consultants-ltd.44320\" target=\"_blank\">MCW Consultants Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/motioneering.54223\" target=\"_blank\">Motioneering<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/neezo-studios.39122\" target=\"_blank\">NEEZO Studios<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rjc-engineers.14107\" target=\"_blank\">RJC Engineers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rwdi-climate-and-performance-engineering.43563\" target=\"_blank\">RWDI Climate and Performance Engineering<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/night-shift.58954\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Late on a recent night, UrbanToronto Forum contributor MJS caught work underway on one of the mechanical sections of &#8230; <a title=\"Night Shift | UrbanToronto\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/night-shift-urbantoronto\/\" aria-label=\"Read more about Night Shift | UrbanToronto\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-31663","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31663"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31663\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}